1 / 28

CMS Trigger Upgrades Phase-I (1)

CMS Trigger Upgrades Phase-I (1). Muon Trigger Upgrades: CSCTF (CSC TrackFinder ) MPC ( Muon Port Card) Calorimeter Trigger Upgrades: HCAL TPG Calorimeter Trigger Algorithms and Electronics ECAL SLB Outline: Calorimeter Trigger Studies and Hardware

quasim
Download Presentation

CMS Trigger Upgrades Phase-I (1)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS Trigger Upgrades Phase-I (1) • Muon Trigger Upgrades: • CSCTF (CSC TrackFinder) • MPC (Muon Port Card) • Calorimeter Trigger Upgrades: • HCAL TPG • Calorimeter Trigger Algorithms and Electronics • ECAL SLB • Outline: • Calorimeter Trigger Studies and Hardware • Status and what will be ready for June10, Sep210 • Muon Trigger Studies and Hardware • Status and what will be ready for June10, Sep210 C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  2. CSC Upgrades for Phase-I • The Goal is to Maintain Performance at 2x1034: • To achieve this we need to increase the bandwidth of the CSC-Trigger and improve on the algorithms. This requires: • A new Muon Port Card (On detector) • A new CSC Track Finder (Off Detector) • Conceptual Design Exists • A Software Package for Simulation has been put together and is being used for studies • Work has started on Hardware Design C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  3. CMS Trigger Upgrades Phase-I (2) Furic+Madorsky:Jan2010 Trigger Meeting C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  4. CMS Trigger Upgrades Phase-I (3) Furic+Madorsky:Jan2010 Trigger Meeting C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  5. CMS Trigger Upgrades Phase-I (4) Furic+Madorsky:Jan2010 Trigger Meeting C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  6. CMS Trigger Upgrades Phase-I (5) Furic+Madorsky:Jan2010 Trigger Meeting C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  7. CMS Trigger Upgrades Phase-I (6) Furic: April 2010 Trigger C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  8. CMS Trigger Upgrades Phase-I (7) Furic: April 2010 Trigger C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  9. CMS Trigger Upgrades Phase-I (8) Furic: April 2010 Trigger C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  10. CMS Trigger Upgrades Phase-I (9) • Summary of Muon Triggers: • Simulation Package of the new trigger is ready • Studies using it have already Started • Firmware Design Has also started • What to expect by June 2010: • Description of the conceptual design • Description of the Software Package. • What to expect by September 2010: • The first results from these studies Furic: April 2010 Trigger C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  11. HCAL TPG (1) • Basic TPG Simulation Package has been written • It Depends upon a number of detector simulation packaged (SiPM, QIE10, MultiDepth….). However, significant progress has been demonstrated in presentations during the monthly trigger meetings. • Effort is needed from the HCAL side to finish the simulation packages and integrate them with TPG and RCT simulations. • After this is done studies can commence. C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  12. HCAL TPG (2) • Guess of what is to come: • Would be nice to have the CMSSW Simulation package by June 2010. • By September 2010 the code could be debugged and integrated with RCT . • By end of the 2010 first Results from Studies • If you want to make the case that the new HCAL design will improve the trigger Isolation algorithms then we must put some effort in to this getting done. C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  13. Calorimeter Trigger Studies (1) • The Strategy is: • Increase the Trigger Granularity and go to 0.087x0.087 Trigger Tower Granularity for all triggers, • Apply Clustering Algorithms • The Goal is to improve performance of: • Tau Trigger (Efficiency, BKG Rejection) • Electron Trigger (Efficiency, BKG Rejection) . • Missing Et Trigger (Sharper Threshold ?). • Jet Trigger (Pseudorapidity and Phi resolution). Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  14. Calorimeter Trigger Studies (2) Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  15. Calorimeter Trigger Studies (3) Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  16. Calorimeter Trigger Studies (4) Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  17. Calorimeter Trigger Studies (5) Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  18. Calorimeter Trigger Studies (6) Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  19. Calorimeter Trigger Studies (7) Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  20. Calorimeter Trigger Studies (8) • Summary: • Debugged/Working Simulation Code Exists • Electron and Tau Triggers in Good Standing • Met Code and Studies needed • Jet Code exists but more studies needed. • What to Expect by June 2010: • What We have now • Algorithm Design • Simulation Design • Electron and Tau Results • What to Expect by September 2010: • Missing Et and Jet Studies • What to Expect by the End of 2010: • All these studies repeated with the new HCAL TPG Code Wisconsin Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  21. HCAL TPG Demonstrators Minnesota Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  22. HCAL TPG Demonstrators (2) Minnesota Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  23. The MiniT Project Imperial Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  24. The MiniT Project Imperial Group C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  25. uTCA Developments at Wisconsin (1) C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  26. uTCA Developments at Wisconsin (2) C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  27. uTCA Developments at Wisconsin (3) C. Foudas, Imperial, Trigger Upgrades 29-4-2010

  28. Summary Demonstrators • The Goal is to have a few Crates in 2012 at P5 running • in parallel with the Current System • We still need to define the roadmap on how to • achieve this goal • The Demonstrators will of course be described in the TP C. Foudas, Imperial, Trigger Upgrades 29-4-2010

More Related