GAO Study on Radioactive Waste Management Scenarios

GAO Study on Radioactive Waste Management Scenarios. Ric Cheston US Government Accountability Office (GAO) chestonr@gao.gov. Presentation Outline . Background on GAO Previous GAO work related to Yucca Mountain and High Level Waste (HLW)/Spent Nuclear Fuel (SNF)

pules
Download Presentation

GAO Study on Radioactive Waste Management Scenarios

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO) chestonr@gao.gov

  2. Presentation Outline • Background on GAO • Previous GAO work related to Yucca Mountain and High Level Waste (HLW)/Spent Nuclear Fuel (SNF) • GAO’s ongoing study of radioactive waste management scenarios (scope and methodology)

  3. GAO • An independent, nonpartisan agency who works for Congress • Work is done at the request of congressional committees or subcommittees, mandated by law, or undertaken under the authority of the Comptroller General • Advises Congress and executive agencies about ways to make government more efficient, effective, ethical, equitable and responsive

  4. GAO Work on Yucca Mountain and SNF/HLW • Have been reporting on Yucca Mountain issues since the 1980’s • Selected recent reports: • GAO-07-1010 - Yucca Mountain: DOE Has Improved Its Quality Assurance Program, but Whether Its Application for a NRC License Will Be High Quality Is Unclear • GAO-06-313 - Yucca Mountain: Quality Assurance at DOE’s Planned Nuclear Waste Repository Needs Increased Management Action

  5. GAO Work on Yucca Mountain and SNF/HLW • Additional Relevant Reports: • GAO-03-426 – Spent Nuclear Fuel: Options Exist to Further Enhance Security • GAO-02-191 – Nuclear Waste: Technical, Schedule, and Cost Uncertainties of the Yucca Mountain Repository Project • GAO reports are available at www.gao.gov

  6. Background • In 1987, Congress designated Yucca Mountain as the nation’s sole candidate for a permanent high-level nuclear waste repository through NWPA amendment • Yucca Mountain was originally to open in 1998, but has been delayed until at least 2020 (if license application is approved and the project is adequately funded) • Waste currently resides in spent fuel pools and dry cask storage at nuclear plants and at DOE sites across the country • Several nuclear utilities have sued DOE for not taking custody of SNF as scheduled • Current law provides no alternative repository site to Yucca Mountain

  7. Background • NWPA caps Yucca Mountain at 70,000 MT • In late 2008, DOE reported: • About 10 %, or 7,000 MT will be DOE/defense waste • DOE/defense waste currently ~13,000 MT • Commercial SNF will exceed 63,000 MT by 2010 and reaching ~130,000 MT by 2055 • DOE recommended that Congress lift the 70,000 MT cap on Yucca Mountain and reported that if not lifted, the nation will need a 2nd repository

  8. Objectives • To the extent reliable data are available, provide information on the objectives and costs of: • the Yucca Mountain Repository, • storing radioactive waste at centralized interim storage facilities, then geologic disposal • storing radioactive waste on-site at nuclear power plants and DOE facilities, then geologic disposal • Provide information on challenges and likely sources of funding associated with each scenario

  9. Overview of Methodology • Interview experts from DOE and other government agencies, industry, academia, and independent organizations to: • Obtain information on the objectives and challenges associated with each scenario • Gather initial assumptions and high-level cost data associated with the scenarios

  10. Methodology • Develop preliminary methodology and obtain feedback from the NAS and NWTRB • Collect and analyze data on objectives and challenges • Identify and collect cost data from short list of cost experts • Develop cost projections, using economic models and Monte Carlo risk analysis

  11. Methodology • Characterize the preliminary scenarios for objectives, challenges, and generic costs • Develop a “snowballed” list of experts • Solicit feedback from experts on preliminary scenarios and revise scenarios accordingly • Industry • Government • Academia • Special Interest Nearly 70 responses

  12. Methodology • Team deciding how to address DOE/defense waste • Likely will report DOE/EM data separately rather than incorporate into economic models

  13. Preliminary Scenarios • Yucca Mountain: • Utilize DOE’s assumptions and cost data • Scale DOE estimates to two waste volumes: 70,000 MT and 153,000 MT • Analyze impacts of license application delays

  14. Preliminary Scenarios • Centralized Interim Storage and Disposal: • Construction and operation of two dry-cask, centralized interim storage facilities • Transport SNF and HLW from commercial reactor sites and DOE sites • Interim storage for approximately 100 years and then disposal in a geologic repository • Analyze two waste volumes: 70,000 MT and 153,000 MT

  15. Preliminary Scenarios • Continued On-site Storage: • Long-term storage of SNF and HLW at commercial reactor and DOE sites • Dry-cask storage systems • Periodic repackaging • Analyze two waste volumes: 70,000 MT and 153,000 MT

  16. Preliminary Scenarios • Difficult to quantify cost categories that will likely be discussed qualitatively: • Reprocessing • SNF from new reactors • License renewal costs • State and local taxes, fees, and penalties • Cost of lawsuits related to the Standard Contract

  17. Next Steps • Final round of informal feedback on draft • Obtain formal comment from DOE on draft report • Issue report on the objectives, challenges, and costs associated with the three scenarios

  18. GAO Study on Radioactive Waste Management Scenarios Questions?