1 / 6

Projet NetSolex

Comment assurer la télémaintenance de Solex Electrique et la télésurveillance du niveau de charge de la batterie à partir d’une interface de communication ? Comment contrôle la tracé des itinéraires empruntés par les livreurs ?. Projet NetSolex.

Download Presentation

Projet NetSolex

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comment assurer la télémaintenance de Solex Electrique et la télésurveillance du niveau de charge de la batterie à partir d’une interface de communication ? Comment contrôle la tracé des itinéraires empruntés par les livreurs ? Projet NetSolex Par Gaillard Vincent, Dib Nassim, Esteves Jonathan, Guillemot Jonathan et Ferric Théo

  2. Sommaire • Introduction • Présentation du SysML : • Cas d’utilisation • Diagramme d’exigences. Conclusion

  3. Introduction Ici on présente la problématique, la reformulation et l’attribution des tâches.

  4. SysML • Cas d’utilisation Ici on met le diagramme de cas d’utilisation et on le présente.

  5. SysML • Diagramme d’exigence Ici on met le diagramme d’exigence et on le présente.

  6. SysML • Diagrammede séquence Ici on met le diagramme de séquence et on le commente. On conclut sur cette diapo.

More Related