An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CVE 4091 - Design 1 Project Management Requirements Prof. Ralph V. Locurcio, PE

  2. Project Phases • Design 1 – Prepare proposal • Purpose is to winthe design • Proposal must state why your team is best • Must include a Project Management Plan in the proposal • Must include your proposed fee for design • Design 2 – Design the project • Verify the proposal @ 5% stage • Design phases @ 15, 50, 95, 100% • Develop engineering details & construction drawings • Manage & report on status@15, 50, 95,100% • Integrate all design elements into unified project • Prepare display for Design Showcase in April • Estimate cost of construction @ 15, 50, 95,100% • Prepare and include a construction schedule • Turn in written report

  3. Proposal Contents-1 • Title Page – follow instructions • Letter of Transmittal –transmits your fee/price to client • Table of Contents – separate tab for each section • Introduction • Problem Statement, Background & Scope of Work - what’s included & what’s not • Discussion of Site, Project Maps – where is it, geometry - area map & site map • Team Organization – who will do it • Project Management Plan • Work Breakdown Structure & Design Budget • Project Flow Diagram – flow of design tasks over time (Draft-1) • Design Schedule (MS Project) – (Draft-2) • Construction Cost Estimate – cost to actually build the project • Conceptual in Proposal, 5% & 15% design • Detailed at 50%, 95% & 100% in Design-2 • Construction schedule at 50% – when project will be built

  4. Proposal Contents-2 • Project Base & Layout Map • Base Map shows data on boundaries and major features • Layout adds “proposed” location and size of engineering features: roads, piping systems, retention ponds, etc. • All team members should participate in these drawings • Design Investigation Report • Written Technical Report – consult with engineering advisor • Include such items as: • Engineering problem(s) to be solved in the design • Logic of location &size of engineering features • Design options considered; cite the pros & cons of each • Applicable codes, ordinances or criteria that will control the design • Cite all technical information to be used in the design • Design decision – what engineering design method will be used and why • Constraints – cite any political, environmental or physical limitations 8. Appendices & List of References

  5. Project Management ToolsYour Project Dashboard They enable you to be proactive rather than reactive…

  6. Project Management Tools • Project Flow Diagram your road map/GPS • Project Schedule your speedometer • Project Budget your fuel gauge

  7. Project Design Flow Diagram

  8. Flow Diagram-2

  9. Work Breakdown Structure

  10. Work Breakdown Structure Don’t forget To update duration At each % stage!!! WBS

  11. Design Budget Budget Don’t forget To update duration At each % stage!!! Don’t forget To show totals At each % stage!!!

  12. Design & Construction Schedules

  13. Cost Estimates • Conceptual Construction Cost • Based on historical data • Itemize components: w&s, structure, roads, etc. • Use cost per SF or unit pricing data • Data from similar project • Be sure to update for location & timing • Example: construct a 300-bed college dorm @ FIT Based on 2008 UCF example @ $25,000/bed Conceptual cost = $7,500,000 x .83 x 1.1 = $6,847,500

  14. Cost Estimates • DetailedConstruction Cost – 50%, 95%, 100% • Due in Design-2 reports • Based on actual design & engineering data • Itemize components: w&s, structure, roads, etc. • More detail as design is completed • Obtain pricing for elements online, RS Means, other. • Include all cost elements: materials, labor, logistics • See template; all use same format • Be sure to summarize cost of entire project • Should be 90-95% accurate

  15. Cost Estimate Template

  16. Questions???? Slides & Sample documents located at: http://my.fit.edu/~locurcio/14-CVE 4091 documents