1 / 31

Beam Instrumentations for KEK ERL Test Facility

Beam Instrumentations for KEK ERL Test Facility. Makoto Tobiyama KEK ERL beam instrumentation group. KEK campus. 3.5GeV e+/8GeV e- KEKB ring. 2.5GeV PF-ring. 6.5GeV PF-AR ring. 8GeV Linac. 5GeV ERL Plan. R&D Plan towards the ERL Light Source. Development of the key components

perrin
Download Presentation

Beam Instrumentations for KEK ERL Test Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam Instrumentations for KEK ERL Test Facility Makoto Tobiyama KEK ERL beam instrumentation group

  2. KEK campus 3.5GeV e+/8GeV e- KEKB ring 2.5GeV PF-ring 6.5GeV PF-AR ring 8GeV Linac

  3. 5GeV ERL Plan

  4. R&D Plan towards the ERL Light Source • Development of the key components • DC photocathode gun • 1.3GHz CW laser • Superconducting cavities, cryomodules and cryosystems • Beam dynamics • Beam instrumentations • ERL test facility • Testing critical components under beam operations • Generation and acceleration of ultra-low emittance / short bunch length beams • Investigation of accelerator physics issues

  5. Tentative parameters of ERL test facility

  6. Layout of ERL test accelerator

  7. Plan for ERL Test Facility in PS East Expt. Hall

  8. KEK ERL Beam Instrumentation Group • Members • T.Mitsuhashi KEK-PF • S.Hiramatsu KEKB • T.Kasuga KEK-PF • T.Obina KEK-PF • M.Tobiyama KEKB • T.Naito KEK-ATF • K.Furukawa KEK-Linac/KEKB • M.Satoh KEK-Linac • K.Haga KEK-PF • M.Tadano KEK-PF • N.Nakamura Tokyo-U ISSP • Missions: • Development of beam monitors for ERL • Development of control system including femto second timing technology

  9. Beam instrumentation for ERL • Beam profile measurement • Fluorescence screen • Optical profile monitor by OTR or SR • Wire scanner (SEM or Compton scattering) • High speed gated camera • Beam position measurement • BPM (electric) • BPM (SR or OTR) • Intensity measurement • DCCT • Differential DCCT to measure beam loss • Photocathode, Faraday cup • SR or OTR based intensity monitor

  10. Beam instrumentation for ERL • Emittance measurement • Fluorescence screen with slit • Wire scanner • Interferometer by SR or OTR • Beam temporal structure • Streak camera (SR or OTR) • Incoherent intensity interferometer (SR or OTR) • CSR interferometer • BLM (opto-electric) • Beam Halo • Wire scanner • Coronagraph (SR or OTR) • Beam loss monitor

  11. Emittance monitor (screen, with slit?) Stripline type BPM Wire scanner or SEM Injection Part

  12. BPM(accelerating beam / decelerating beam) BPM(accelerating beam / decelerating beam) OTR or F. screen OTR or F. screen SC Cavity part SC Cavity part

  13. Differential DCCT to measure current valance (or beam loss) between accelerated beam and decelerated beam

  14. SR3 SR4 SR5 SR2 SR1 SR6 SR7 BPM Screen、OTR Arc sections

  15. cavity BPM Bunch length monitor (one pass, Opto-electric type) Test port for developments Long straight section

  16. Dump line BPM Screen

  17. Present status of development • BPM • Development of BPM electrodes (feedthrough) with better time response • Simulation work to design stripline electrodes • Bunch-by-bunch position detection using iGp • Cavity-type BPM • Design / trial manufacturing of a air-model • Differential DCCT • Under consideration.. • Fluorescence screen with slit • Trial manufacturing

  18. Present status of development(SR related monitors) • Measurement of beam halo • Coronagraph technique have been shown to be usable down to 10-7 using PF ring. • Optical phase space monitor • Measurement of bunch length using intensity interferometry • Input optics system with all mirror-optics for femto-second streak camera

  19. Coronagraph for halo measurement Anti-reflection disk Field lens Relay lens Baffle plate (Lyot stop) Objective lens Opaque disk Baffle plates to reduce reflection

  20. Observation for the more out side Single bunch 65.8mA Exposure time of CCD : 3msec Intensity in here : 2.05x10-4 of peak intensity 2.55x10-6 Far tail Exposure time of CCD : 100msec Background leavel : about 6x10-7

  21. Test line for short pulse beam at PF-BT

  22. ex=40 (nm*rad) ey=13 (nm*rad) BH31 in R56=0.1 (m) T566 = -0.11 (m) Bunch Compress: BK-BH31 sz=0.17 (mm)=0.57(psec) se=10.0 x 10-3

  23. Development of glass-sealed button-type electorde

  24. Time / frequency response

  25. iGp signal processor 509MHz External Memory 8Mbyte Timing / Clock distribution Fid FPGA Vertex II XC2V6000-6 (FF1152) Feedback signal Bunch position ADC 1.5GSPS MAX108 DAC MAX588912bit600M MAX1202 8ch 12bit ADC Embedded IOC (mini-ITX) Ethernet AD8842 8ch 8bit DAC 32bit GPIO

  26. DAC(MAX5889) FPGA(XC2V6000) ADC(MAX108) DC/DC converter USB IF(FT2232L)

  27. Front and rear view

  28. Frequency response(8 tap FIR, tune 0.52)

  29. High frequency trial • KEKB iGp system: work up to 560MHz • Limited by delay scatter of FPGA to DAC • A/D seems working much higher frequency • SLAC/DimTel test set • A/D to FPGA(Spartan3) works up to 1GHz • Seems not so difficult to tune FPGA to work on 1.3GHz RF frequency

  30. Summary • Design and development of the beam instrumentation for KEK-ERL test facility has been started. • Beam position monitor • Intensity monitor / loss monitor • SR related monitor • Constructed test line for short pulse beam at PF-BT • 0.57ps bunch length / 25Hz operation • Evaluate time response of BPMs • Test new SR related monitors

More Related