GRUPO DE TRABALHO LICITAÇÕES E OBRAS PÚBLICAS

GRUPO DE TRABALHO LICITAÇÕES E OBRAS PÚBLICAS. INTEGRANTES: ISABEL GROBA – PRR 3ª REGIÃO SUZANA FAIRBANKS – PR/SP JOSÉ RICARDO MEIRELLES – PRR 3ª REGIÃO. GRUPO DE TRABALHO LICITAÇÕES E OBRAS PÚBLICAS. DEMANDAS ESPECÍFICAS DA 5ª CCR

Download Presentation

GRUPO DE TRABALHO LICITAÇÕES E OBRAS PÚBLICAS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRUPO DE TRABALHO LICITAÇÕES E OBRAS PÚBLICAS INTEGRANTES: ISABEL GROBA – PRR 3ª REGIÃO SUZANA FAIRBANKS – PR/SP JOSÉ RICARDO MEIRELLES – PRR 3ª REGIÃO

  2. GRUPO DE TRABALHO LICITAÇÕES E OBRAS PÚBLICAS • DEMANDAS ESPECÍFICAS DA 5ª CCR • PROGRAMA EMERGENCIAL DE TRAFEGABILIDADE E SEGURANÇA NAS ESTRADAS INSTITUÍDO PELO DNIT • OBRAS AEROPORTUÁRIAS E DEMAIS CONTRATOS CELEBRADOS PELA INFRAERO

  3. MALHA RODOVIÁRIA FEDERAL – 56.138 KM ASFALTADOS PORTARIA DNIT Nº 1806 – CONTEMPLOU 26.516,1 KM: • 7.251,9 KM - DECLAROU O ESTADO DE EMERGÊNCIA PARA A CONTRATAÇÃO DIRETA (ARTIGO 24, IV, DA LEI Nº 8.666/93)‏. • OUTROS 19 MIL KM - PERMITIU ADITAMENTO CONTRATUAL POR MEIO DE CRÉDITOS EXTRAORDINÁRIOS AOS CONTRATOS PARALISADOS POR FALTA DE RECURSOS.

  4. AÇÃO CIVIL PÚBLICA PROMOVIDA PELA PR/DF • OBJETO: SUSPENSÃO DA EFICÁCIA DO ART. 3.º DA PORTARIA DNIT NO QUE SE REFERE À AUTORIZAÇÃO PARA CONTRATAÇÃO DIRETA. • PEDIDO DE TUTELA ANTECIPADA: ABSTER-SE DE CONTRATAR E RENOVAR CONTRATOS FIRMADOS COM TERCEIROS COM FUNDAMENTO NO ESTADO DE EMERGÊNCIA DECRETADO, SALVO PROCEDIMENTO LICITATÓRIO ESPECÍFICO EM CONFORMIDADE COM A DECISÃO DO TCU Nº 347/1994. • TUTELA ANTECIPADA INDEFERIDA.

  5. ATUAÇÃO DA 5ª CCR E DO GRUPO DE TRABALHO • - COLETA DE INFORMAÇÕES PARA A ATUAÇÃO: • REUNIÃO DOS ANALISTAS PERICIAIS COM OS TÉCNICOS DO TCU E PROFESSORES DA UnB, EMITINDO A INFORMAÇÃO TÉCNICA Nº 003/2006. PONTOS ACENTUADOS: • SER QUESTIONÁVEL A DECLARAÇÃO DE SITUAÇÃO DE EMERGÊNCIA EM TODA A EXTENSÃO DOS TRECHOS DO PETSE APRESENTADOS PELO DNIT; • A ESCOLHA DE SOLUÇÕES INADEQUADAS E/OU A AUSÊNCIA DE PROJETO ESPECÍFICO DE EXECUÇÃO RESULTA EM PREJUÍZOS AO ERÁRIO; • RECOMENDA O ACOMPANHAMENTO DAS RESTAURAÇÕES. • REUNIÕES COM DIRETOR-GERAL E PROCURADOR-GERAL DA DNIT – FATOS RELEVANTES APURADOS. • REUNIÃO DOS INTEGRANTES DO GT E A COORDENADORA DA 5ª CCR COM O TCU – SECOB. • REUNIÃO DA 5ªCCR – DELIBERA AMPLA DIVULGAÇÃO AOS MEMBROS PARA A ATUAÇÃO NA MATÉRIA.

  6. - PROVIDÊNCIAS PARA ATUAÇÃO: • EXPEDIÇÃO DE OFÍCIO CIRCULAR COMUNICANDO DELIBERAÇÃO DA 5ª CCR; • EXPEDIÇÃO DE OFÍCIO AO TCU E CGU SOLICITANDO COMPARTILHAMENTO DE INFORMAÇÕES; • INCREMENTO DE INFORMAÇÕES NO LINK DA 5ªCCR NA INTRANET – SUBSÍDIOS À ATUAÇÃO; • ACOMPANHAMENTO DA EXECUÇÃO ORÇAMENTÁRIA DO PROGRAMA - ANALISTA PERICIAL DA 5ª CCR; • ASSESSORIA PERICIAL DA 5ª CCR: - ANÁLISE DOS RELATÓRIOS DE FISCALIZAÇÃO DA CGU – 140 RELATÓRIOS COM INFORMAÇÕES COLHIDAS EM CAMPO, REF. A 12.000 KM DE RODOVIAS PERCORRIDAS - EMISSÃO DE 42 PARECERES TÉCNICOS - EMISSÃO DE 6 INFORMAÇÕES TÉCNICAS

  7. ATUAÇÃO DO TCU • 101 FISCALIZAÇÕES EM 23 ESTADOS - RELATÓRIOS COM PROPOSTAS DE MEDIDA CAUTELAR DE SUSPENSÃO DE OBRAS/ DILIGÊNCIAS INSTRUTÓRIAS. • RELATÓRIO CONSOLIDADO - ACÓRDÃO Nº 686/06 – 103 ITENS DO PETSE FORAM FISCALIZADOS, APROXIMADAMENTE 10.790 KM.

  8. OBRAS E SERVIÇOS DO PETSE* X FISCALIZAÇÕES DO TCU

  9. CLASSIFICAÇÃO DOS TRECHOS FISCALIZADOS QUANTO À EMERGENCIALIDADE

  10. CLASSIFICAÇÃO DOS TRECHOS FISCALIZADOS QUANTO AOS INDÍCIOS DE IRREGULARIDADE

  11. FALHAS DETECTADAS PELO TCU • CONTRATOS VERBAIS EM DESACORDO COM A LEI 8.666/93; • CONTRATOS SEM O DESCONTO DE 20% PREVISTO NAS NORMAS REGULAMENTARES DO PETSE; • TRECHOS CLASSIFICADOS COMO EMERGENCIAIS SEM EVIDÊNCIAS DA NECESSÁRIA URGÊNCIA – DISPENSADA LICITAÇÃO; • PRORROGAÇÃO DE CONTRATOS ANTIGOS COM MAJORAÇÃO, SEM PRÉVIA DEFINIÇÃO DA PLANILHA DE CUSTOS E SEM ELABORAÇÃO DE ORÇAMENTO DETALHADO.

  12. OBRAS AEROPORTUÁRIAS E OUTROS CONTRATOS CELEBRADOS PELA INFRAERO • CRISE AÉREA • LEVANTAMENTOS REALIZADOS PELO GRUPO DE TRABALHO PROJETOS E METAS • PROCEDIMENTOS INVESTIGATÓRIOS EXISTENTES NO ÂMBITO DO MPF • PROCEDIMENTOS INSTAURADOS PELO TCU • CRUZAMENTOS DE INFORMAÇÕES

  13. ATUAÇÃO GRUPO DE TRABALHO • COMPILAÇÃO E REFINAMENTO DOS DADOS: CONSULTAS AOS DIVERSOS BANCOS DE DADOS E AOS MEMBROS DO MPF • DISPONIBILIZAÇÃO DOS DADOS EM LINK ESPECÍFICO NA PÁGINA DA INTRANET DA 5ª CCR • LEVANTAMENTO DAS DECISÕES E ACÓRDÃOS DO TCU • EXPEDIÇÃO DE OFÍCIO CIRCULAR ÀS PR E PRM, COM A REMESSA DE DECISÕES E ACÓRDÃOS DO TCU PERTINENTES A IRREGULARIDADES NA INFRAERO

  14. COMISSÃO PARLAMENTAR DE INQUÉRITO DO “APAGÃO AÉREO” DO SENADO FEDERAL: • LEVANTAMENTO DE PROCEDIMENTOS INVESTIGATÓRIOS DE RELEVO PARA INDICAÇÃO À CPI; • CONSULTA AO BANCO DE DADOS DE PROCEDIMENTOS DA 5ª CCR; • PROCEDIMENTOS INVESTIGATÓRIOS E ACP EXISTENTES E CONSULTA AOS COLEGAS. • REUNIÃO ESPECÍFICA: - OBJETO: TRATAR DOS PA, ICP E ACP REFERENTES A OBRAS E SERVIÇOS DE ENGENHARIA DE MODERNIZAÇÃO E AMPLIAÇÃO DOS AEROPORTOS SOB A CONDIÇÃO DA INFRAERO.

  15. - ESTRATÉGIAS: • - PRIORIZAÇÃO DA INSTRUÇÃO DOS PA E ICP ALÉM DO ACOMPANHAMENTO EFETIVO DAS AÇÕES JUDICIAIS; • - NECESSIDADE DE REALIZAÇÃO DE TRABALHO TÉCNICO PELOS ANALISTAS PERICIAIS DE ENGENHARIA DA 5ª CCR, ESTABELECENDO CONTATO DIRETO COM A SECOB/TCU; • - INTERCÂMBIO DE INFORMAÇÕES COM A SECOB/TCU PARA A INSTRUÇÃO DE INVESTIGAÇÕES E AÇÕES JUDICIAIS; • - NECESSIDADE URGENTE DE IDENTIFICAÇÃO DA EXISTÊNCIA DE PROCEDIMENTOS CRIMINAIS, INQUÉRITOS POLICIAIS E AÇÕES CRIMINAIS EM CURSO NAS PR VERSANDO SOBRE IRREGULARIDADES NAS OBRAS;

  16. - REMESSA À PR/DF DOS DADOS ENCAMINHADOS PELA CPI DO “APAGÃO AÉREO' DO SENADO FEDERAL À PR/SP, VISANDO À INSTAURAÇÃO DO PROCEDIMENTO COM O ESPECIAL OBJETO DE INVESTIGAR AS IRREGULARIDADES DOS CONTRATOS DE OBRAS DE MODERNIZAÇÃO E AMPLIAÇÃO DOS AEROPORTOS BRASILEIROS; - ENCAMINHAMENTO DE OFÍCIO AO COORDENADOR DA 5ª CCR ENFATIZANDO A NECESSIDADE DE AUMENTO DO QUADRO DE ANALISTA PERICIAL COM FORMAÇÃO EM ENGENHARIA CIVIL VINCULADO À 5ª CCR; - NECESSIDADE DE ACOMPANHAMENTO PREVENTIVO DAS OBRAS AEROPORTUÁRIAS A SEREM REALIZADAS NO AEROPORTO DE VIRACOPOS, CAMPINAS/SP; • ACOMPANHAMENTO DO DESDOBRAMENTO DAS ESTRATÉGICAS TRAÇADAS NA REUNIÃO.

  17. SUGESTÕES DE NOVAS ATUAÇÕES DO GRUPO DE TRABALHO • ACOMPANHAMENTO E DIVULGAÇÃO DAS FISCALIZAÇÕES REALIZADAS PELO TCU EM CUMPRIMENTO ÀS LDO. • CICLO DAS FISCALIZAÇÕES: • INÍCIO – SELEÇÃO POR VOLTA DO MÊS DE MARÇO DE CADA EXERCÍCIO; • FINAL – ENVIO DA CONSOLIDAÇÃO DOS DADOS AO CONGRESSO NACIONAL ATÉ 30 DE SETEMBRO DE CADA ANO.

  18. Quantidade de Fiscalizações por Função Orçamentária – Fiscobras 2008 – – Fiscobras Tradicional e Acompanhamentos in loco)‏ Fonte: TCU

  19. Composição das Unidades Orçamentárias nas Fiscalizações de Obras em 2008 (Fiscobras Tradicional e Acompanhamentos in loco)‏

  20. PROJETOS ESPECIAIS AUDITADOS

  21. Indícios de Irregularidades Fiscobras – 2008 (situação em 25/09/2008)‏ Obs.: Das 84 obras do PAC 13 apresentam IG-P.

  22. Fiscalizações em que foram constatados indícios de irregularidades graves que podem gerar paralisação da obra (IG-P) ou retenção de pagamentos, por Unidade Orçamentária (situação em 25/09/2008):

  23. Incidências de indícios de IG-P mais significativas

  24. Fonte: Jornal Correio Braziliense, 1º de Outubro de 2008

  25. Fonte: Jornal Correio Braziliense, 1º de Outubro de 2008