1 / 8

Eugene Water & Electric Board

Eugene Water & Electric Board. Review Recommendations for Premium Western Economizer. Primary sensor control location Two-stage thermostat & coordination Differential dry-bulb outside air changeover Adequate air flow and exhaust relief Ventilation control Quality Assurance.

parker
Download Presentation

Eugene Water & Electric Board

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eugene Water & Electric Board Premium Ventilation

  2. Review Recommendations for Premium Western Economizer • Primary sensor control location • Two-stage thermostat & coordination • Differential dry-bulb outside air changeover • Adequate air flow and exhaust relief • Ventilation control • Quality Assurance Premium Ventilation

  3. Desired Sequence • Min OSA ventilation during heating • Use ventilation before cooling • Use full OSA vent with cooling coil • Lock out or Change over from ventilation to minimum when OSA too warm Premium Ventilation

  4. Premium Ventilation • Start with a Western Premium Economizer • Upgrade the Economizer module with • DCV capable economizer control module • CO2 Sensor; Min air set to 0% = leakage • Add variable speed fan motor • Full (or near full) speed in heating or cooling • Low (30%) speed in idle mode Premium Ventilation

  5. Triple the Savings • Premium Economizer Savings, plus • Fan savings when not heating or cooling • Savings during warm-up by reducing ventilation when not occupied • Ventilation heating and cooling savings when building not fully occupied • No need to set and measure outside air minimum Premium Ventilation

  6. Regional Savings Premium Ventilation

  7. New Units or Retrofit • Retrofit VSD Options • ICM CC750 • Fan Handler • Both use temperature control strategy Premium Ventilation

  8. Currently Custom Incentives • Move towards rebate approach • Two contractors have proposals for work • New Construction and Replacement market Premium Ventilation

More Related