1 / 21

Hospitality Division

Hospitality Division. Prefab Panel System. Luxury Bath and Flooring. PREFAB PANEL. Aluminum Honeycomb. Aluminum Sheet. Aluminum Sheet. Natural marble. Prefab Panel with Honeycomb Backing Usage: Wall Panel, Cladding, Curved Panel. PREFAB PANEL. Prefab Panel with Fiberstone Backing

ownah
Download Presentation

Hospitality Division

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hospitality Division Prefab Panel System Luxury Bath and Flooring

  2. PREFAB PANEL Aluminum Honeycomb Aluminum Sheet Aluminum Sheet Natural marble • Prefab Panel with Honeycomb Backing • Usage: Wall Panel, Cladding, Curved Panel

  3. PREFAB PANEL • Prefab Panel with Fiberstone Backing • Usage: Floor Panel, Pattern flooring, high-strength requested

  4. SYSTEM ADVANTAGES • Light-weight panels • Ease handling for semi-skilled workers • Watertight • Suitable for shower & bath • Adapt to your design vision. • More stone choices to use such as limestone, sandstone, marble, granite & onyx • Match with site tolerances • Proven high speed production • 300 bathrooms per month

  5. INSTALATION ADVANTAGES • Major work done in factory • Reduce Site work • Fast installation • Improve workmanship • No wet work on site • No waste/debris on site

  6. ECONOMICAL ADVANTAGES • Early back to business • Short installation lead time • Clean & Quiet site • Renovation along with normal business operation is possible • Better Quality • Highest standards of workmanship • Easily retrofitted • Save building cost • Less building weight (Only drywall needed) • Less natural stone used • Less site debris • Less experienced labor required • Less transportation cost

  7. GENERAL COMPARISON

  8. PRODUCTION PROCESS

  9. INSTALLATION SEQUENCE

  10. SITE INSTALLATION Bath Tub & Frame

  11. INSTALLATION: 4-DAY CYCLE

  12. FINISHED PROJECT: • Macau Ponte 16 Resort • Installation of 404 bathrooms in just 48 days. • Product Used: Prefab with honeycomb; wall & flooring • Comparison • Conventional Method: • 160 Skilled Workers • 50 Cleaners • Prefab System: • 40 Semi-Skilled Workers • 8 Skilled Workers • 10 Cleaners

  13. Macau Ponte 16 Resort

  14. Macau Ponte 16 Resort

  15. FINISHED PROJECT: • Singapore Marina Bay Sands • Installation of 2797 bathrooms in just 69 days. • Product Used: Prefab with honeycomb; wall & flooring • Comparison • Conventional Method: • 762 Skilled Workers • 60 Cleaners • Prefab System: • 122 Semi-Skilled Workers • 61 Skilled Workers • 20 Cleaners

  16. SINGAPORE MARINA BAY SANDS

  17. SINGAPORE MARINA BAY SANDS

  18. FINISHED PROJECT: • Venetian, Macau • Installation of 1,200 m2 Waterjet Pattern in just 15 days. • Product Used: Prefab panel with fiberstone; flooring • Comparison • Conventional Method: • 10 Skilled Workers • 2 Cleaners • Prefab System: • 2 Semi-Skilled Workers • 2 Skilled Workers • 1 Cleaners

  19. VENETIAN, MACAU

  20. MORE PREFAB STONE PRODUCTS • 1.5 mm thk Slate Veneer • 3 mm thk semi transparent Onyx Panel • Floor / Wall Panel • Patterns or Inlays • Hairline / 1 mm Joint • Shower Panel • Curved Panel • 1/5 weight to original 30mm stone

  21. For more information visit us at:www.terracorepanels.com 2030 Irving Blvd Dallas, Texas 75207 (214) 749-0999

More Related