1 / 13

Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation

Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation. Project Description

osias
Download Presentation

Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation

  2. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation

  3. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation Project Description • Required works to be done under this project: • Preparation of design and safety projects of all applications • Determination of project consultant • Guardrail installation (totally 250 km) • Pedestrian overpass/underpasses installation (totally 10 locations) • Installation of signalisations on existing junctions (totally 12 location ) • Implementation of new interchange (junctions) (totally 2 locations) • Existing junctions improvement (totally 5 locations) • Select the appropriate impact measures • Select the appropriate analysis method • Evaluating economic impacts of the project. • Estimated investment cost • 52 Million €

  4. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation • This project route • is part of future TEN-T Road Network for Turkey and priority project route in TINA Turkey study • is HLG short-term priority project/and route • is providing connection to Zonguldak, Filyos, Samsun and Trabzon Ports of Black Sea Region • This project section is a transit route between Europe, Caucasia and Asia • Part of TINA for Turkey Core Road Network and priority route in TINA study • The objective of TINA for Turkey is to define a multi-modal transport network (Core Network) designed to extend the European Union's TEN-T network into Turkey • Now, the Core Transport Network that is determined at the end of TINA study, is negotiated between EC and Turkey within chapter 21 “Trans European Network” • This project route is a part of • continuation of Pan-European Transport Corridor IV • E-road, HLG south-east axes, BSEC,TRACECA, ECO, UN/ESCAP, TEM and Euro-Asian Road

  5. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation Project General Objectives • Preventing accident with fatal, injured and damaged, • Capacity increase in mountainous region, • Reducing travel time on whole route, • Generate new economic development and create new demand, • Improving the accessibility, • Increasing road safety level on TRACECA route. • Decreasing the user coast

  6. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation Actual and Future Demand • Traffic Volume (2008 - vehicles/day) • Maximum AADT :7.070 • Minimum AADT :3.150 • Heavy vehicle changing ratio 25% - 35% • Traffic Volume (forecasting in TINA project, 2020 – vehicles / day) • Future traffic flows (2020) are estimated using a transport demand model. • The model uses a single socio-economic scenario and three different infrastructure scenarios (Reference, Long-term Investment and Alternative Scenario) • AADT:5.000 - 10.000 Financial Analysis • PPP application has not been available yet. • There isn’t any existing FA study. • There is no any updated Feasibility study

  7. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation • According to our estimations (if Turkey has enough financing sources) • start year of the project : 2013 • end year of project : 2015 • Roughly estimated cost :52 million € (for whole project) • This project is not suitable directly for interesting of private investors with PPP approach at the moment. • Economic benefit due to reduction in number of accidents resulting from increase in geometrical and physical standards • Time savings due to increase in vehicle speed

  8. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation Existing situation • Divided highway with interrupted flow increase road user impacts (money cost of travel, travel time, safety, comfort, reliability etc.) • According to 2009 accident data, there are 939 accidents on Gerede-Gürbulak road section. On 939 accidents, 113 deaths, 4.913 injuries and 2.017 vehicle property damages has occurred. After project implemented • It is estimated that the user costs will decrease 50%. • According to 2011 current prices, an estimated profit of 75 million € will be provided when the result of reduction of user cost. • Estimated B/C ratio is 1,44 • Economic impacts (value added, property value etc)will increase. 8

  9. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation • Total annual vehicle that is entered into Turkey and exited from Turkey • Gürbulak Border Gate to IRAN  232.447 vehicles / year (Heavy vehicle ratio : 71%, in 2010) 9

  10. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation 10

  11. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation 11

  12. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation

  13. Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation

More Related