Integrated Blast Risk Assessment for Improved Preparedness & Response (CRTI-06-0150TD)

Integrated Blast Risk Assessment for Improved Preparedness & Response (CRTI-06-0150TD). Simon Foo, Edward Morofsky & Brian Kyle Professional & Technical Service Management Real Property Branch Ghani Razaqpur Murat Saatcioglu McMaster University University of Ottawa

Download Presentation

Integrated Blast Risk Assessment for Improved Preparedness & Response (CRTI-06-0150TD)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Blast Risk Assessment for Improved Preparedness & Response(CRTI-06-0150TD) Simon Foo, Edward Morofsky & Brian Kyle Professional & Technical Service Management Real Property Branch Ghani Razaqpur Murat Saatcioglu McMaster University University of Ottawa Public Security S&T Summer Symposium 2009, Ottawa, June 15-18.

  2. Project Overview • Screening tool: preliminary risk assessment for ranking of buildings according to risk levels • Evaluation methodology: reliability-based approach for the evaluation of high-risk buildings to determine mitigation needs • Retrofit technologies: guidance on the use of blast mitigation technologies • Post-blast assessment: on-site evaluation of a building after a bomb blast attack • Training of end-users: preparedness and emergency responders

  3. Relevance to emergency preparedness & responder needs Emergency preparedness Emergency response Screening Post-Blast Evaluation Evaluation Retrofit

  4. Progress: Screening Building function, Security measures, charge weight Threat Standoff distance, building geometry (length, height, number of floors), frame/wall construction, window type & percentage Vulnerability Building area, number of occupancy, affected (damaged) area with respect to vulnerability Consequence Risk Threat x Consequence • Refined P-I diagrams for uniformity of the criteria for damage assessment being evaluated against available diagrams & test data

  5. Progress: Retrofitting • Experimental investigation of as-is and retrofitted structural elements by University of Ottawa with support from CERL • Shock tube became operational in December 2008 • Testing of first series of reinforced concrete members (slabs and columns) with and without seismic detailing • Various retrofitting technologies to be considered in second series of tests

  6. Retrofitting: Ottawa U’s Shock Tube

  7. Retrofitting: Shock Tube Test

  8. Progress: Evaluation • Developed computer programs which apply SDOF, MDOF concentrated mass & continuum elements to analyze structural elements • SDOF & MDOF models developed and being evaluated against results of commercial FE software • Objective is to compare the results of these analyses with each other & with experimental data, leading to a set of recommendations on how to properly apply each method of analysis and its expected level of accuracy • Conducted field tests on concrete, steel and masonry members in May 2008, November 2008 and May 2009

  9. Progress: Post-Blast Assessment • Framework for a post-blast evaluation methodology developed, including safety classification levels and the initial development of the criteria used in the classification • Work underway on developing specific criteria for each type of classification and for different building types & structural systems • Further development of the methodology awaits the evaluation of analysis tool and the test data

  10. Acknowledgement • Chemical, Biological, Radiological/Nuclear, and Explosives Research Technology Initiative (CRTI-06-0150TD) • Centre for Security Science • Project Partners: • NRCan/CERL (Canadian Explosives Research Lab) • RCMP Technical Security Branch • McMaster University • University of Ottawa • ABS Consulting