W a v e 2 0 0 1

Wave 2001. W a v e 2 0 0 1. Mildred van der Zwan Architect - TUDelft Valerie Ou Engineer – Stanford Diego Aviles Construction Manager - Stanford Daniel Kwon Apprentice – Stanford Brooke Barrett Owner - DPR. Flexible building and workplaces Central areas for interaction

noel
Download Presentation

W a v e 2 0 0 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wave 2001 W a v e 2 0 0 1 Mildred van der Zwan Architect - TUDelft Valerie Ou Engineer – Stanford Diego Aviles Construction Manager - Stanford Daniel Kwon Apprentice – Stanford Brooke Barrett Owner - DPR

  2. Flexible building and workplaces Central areas for interaction Ocean view Context Architect’s Vision W a v e 2 0 0 1

  3. Matrix W a v e 2 0 0 1

  4. 3D Model W a v e 2 0 0 1

  5. auditorium classrooms lab seminar computer offices lounge storage MEP elevator Floor 1 W a v e 2 0 0 1

  6. auditorium classrooms lab seminar computer offices lounge storage MEP elevator Floor 2 W a v e 2 0 0 1

  7. auditorium classrooms lab seminar computer offices lounge storage MEP elevator Floor 3 W a v e 2 0 0 1

  8. A B B” Section B B” A” A A” W a v e 2 0 0 1

  9. Building Performance Large classrooms: Sloped, 2 exits, 65 seats Auditorium: sloped, 5 exits, 197 seats All classrooms, LAB, Computer: ocean view All offices: daylight W a v e 2 0 0 1

  10. Structural Requirements • Design wind speed: V33 = 80mph • NBCC • (National Building Code of Canada) • Most severe case: North wind • Wind parallel to corridor • Design snow load: • Uniformly distributed load • 25psf W a v e 2 0 0 1

  11. Final Structural Solution Beam : W18X35 Girder: W24X76 Column: W14X48 • Steel Moment resisting frame • 3” 20GA full composite slab • 12m girder, column/column span W a v e 2 0 0 1

  12. Foundation Design • Spread footings :1.5m X 1.5m X 60cm • Grade beams: 30 cm X 60cm W a v e 2 0 0 1

  13. Architectural/Structural Integration Column!! • No structure element intrusion in architectural space in 1st and 2nd floor • One column intruded flexible offices are, but acceptable to architect W a v e 2 0 0 1

  14. Architectural/Structural Integration W a v e 2 0 0 1

  15. Final Roof Design: Structure N • Conventional Truss: Double angles • Truss Spacing: 20’ oc • Purlin Spacing: 5’oc EW, 7oc NS • Simple connections to main structure W a v e 2 0 0 1

  16. Roof Design: Truss Configuration N WIND L 2X2 ½ X 5/16 L 2X2 ½ X 3/16 • Sloping N-S direction • Suction effect due to North wind at wing trusses—uplifting • Compression on end trusses WIND L 2X2 ½ X 3/16 W a v e 2 0 0 1

  17. Roof Design: Truss Configuration con’t N WIND L 2X2 ½ X 3/16 • Sloping E-W direction • Wind parallel to ridge suction effect • Uplifting at connections L 2X2 ½ X 3/16 L 2X2 ½ X 3/16 W a v e 2 0 0 1

  18. Roof Design: Truss Configuration con’t • Purlin size: C 9X20 • 1 ½” steel deck • Expanded perlite and fibers impregnated with integral asphalt waterproofing • 2hr fire rating with 1” slab W a v e 2 0 0 1

  19. Roof Connections W a v e 2 0 0 1

  20. Structure Connections W a v e 2 0 0 1

  21. Structural Analysis: • P-d effect included • Story drift : 1.2 in • Large horizontal shear force at truss/structure connection • Truss element forces are verified by MASTAN • Average element force ranging from 10 kips to 50 kips W a v e 2 0 0 1

  22. Pro’s and Cons W a v e 2 0 0 1

  23. Budget: $5.5 Million in 2015 (4.6 Million PV) Time Constraints: 1 year (construction duration ) Computer Lab Occupied by May 30, 2016 Preserve Architecture Construction Objectives W a v e 2 0 0 1

  24. Site Plan W a v e 2 0 0 1

  25. Construction Equipment Crane Excavator Dump Truck Concrete Pump Truck Material Handler W a v e 2 0 0 1

  26. 4D Simulation W a v e 2 0 0 1

  27. Milestone 1 Foundation (week 5) Schedule - Milestones W a v e 2 0 0 1

  28. Milestone 2 Set HVAC Equipment (week 18) Schedule - Milestones W a v e 2 0 0 1

  29. Milestone 3 Exterior Closure (week 24) Schedule - Milestones W a v e 2 0 0 1

  30. Milestone 4 Project Completion (week 31) Schedule - Milestones W a v e 2 0 0 1

  31. Total Pre-construction Time: 8 months Total Construction Duration: 7 months Milestones: Foundation (by June 30, 2015) Exterior Closure (by November 30, 2015) Project Completion (by January 15, 2016) Time savings achieved by: Simple Foundation Steel Structure On time Enclosure Schedule Analysis W a v e 2 0 0 1

  32. $611,176 $3,756,820 Construction Estimate W a v e 2 0 0 1

  33. Cost Distribution W a v e 2 0 0 1

  34. Where are the main costs? Superstructure (Roof-Truss) Larger Surface Area (2,736 sf) How did we save? Simple Foundation Avoided Mass Excavation (Bedrock) Local Wood Facade Cost Analysis $3,756,820 $3,590,600 W a v e 2 0 0 1

  35. Chiller 60 Tons Nominal Capacity Dimensions: Length = 9.5ft Width = 7.3ft Height = 6.5ft Weight = 2465/3010 lbs Equipment Specifications (1) W a v e 2 0 0 1

  36. Air Handling Unit 120 Tons with 20,000 CFM airflow Dimensions: Length = 12.4 ft Width = 6 ft Height = 8 ft( Weight = 8,000 lbs Equipment Specifications (2) W a v e 2 0 0 1

  37. MEP Layout Floor 1 Floor 2 Floor 3 W a v e 2 0 0 1

  38. A E C Team Process: Roof Design W a v e 2 0 0 1

  39. Explanation of concepts in other disciplines Good design requires interaction and collaboration Technology is only as good as the user Lessons Learned W a v e 2 0 0 1

  40. Thank You A Carel Weeber (TUDelft), Rutger Smook (TUDelft), Sevil Sariliydize (TUDelft), Dennis Scott (MBT), David Bendett (MBT), Bart Luiten (HBG), Bart van der Pot (HBG), Cor Notenboom (HBG) E Greg Luth (KLAA), Shilin Jiang (KLAA), Eduardo Miranda (Stanford) C Eric Horn (Webcor Builders), Bob Tatum (Stanford) and Eduardo Miranda (Stanford) W a v e 2 0 0 1