An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDAQ commissioning Carlos Solans, Belen Salvachua TileCal Valencia meeting 20th September 2007

  2. Online Muid Energy run 20897 M4 performance • Read-Out • OF constants loading to all RODs presented at online database meeting(link) • Sincronization issue CTP - TileCal. • Extra BCR delay added • High-rate de-synchronization issue • Expert session (CTP-Tile-ROS) scheduled for 30/09/2007. • Data storage/castor/cern.ch/grid/atlas/t0/perm/daq • Monitoring • Running at ROS and EF level • More on L2 contribution reported by Arantxa. • DDC integration • Data and Message transfer used. • Outcome from DDC meeting (link) Combined cosmic event ATLANTIS display TDAQ commissioning 20th sept 2007

  3. RCD updates • Added programable ECR, BCR enabling and rate to TileCal_TTCviModule. • RCD ReadoutModule used for ROD lab @Valencia and @CERN. • OC flush SDRAM when using VME read-out. • Used for DVS tests. • Publish ROD links up and ROD links read-out at configuration time. • Read-out configuration monitor • MetaData update readMetaData output display TDAQ commissioning 20th sept 2007

  4. DSP updates • DSP version 13.3.3 installed in the pit since Friday 14th september. • Event format version word • MSB: TDAQ data format version (0x0301). • The ROS will check for the correct format version. • LSB: DSP version • RITMO • Added TTC information (LastL1ID, LastBCID, LastTType) • Reco fragment type 4 (Belen can explain better) • Energy units (ADC, pC, CS calibrated pC, MeV) • Using calibration constants • Already syncrhonized with Athena version 13.3.X • It will be synchronized with production version 13.0.30 (M5) • DSP synchronization issue(Alberto can explain better) • DSP rejected one out of 8 events from staging feb when there were problems with full feb. TDAQ commissioning 20th sept 2007

  5. Future upgrades ROD crate • Stop less recovery system (see drawing) • If ROD Busy is busy, it will disable the linked object in the channel setting the busy. • In case of Tile, it is the TBM  Logical OR of all ROD crate • We need to extend this stop less recovery system to the TBM. • TBM firmware upgrade? (To be discussed with LAr). • Segment cleaning • We have the same number of controllers than controlled applications. • DAQ asked to group applications inside same TTC segment. • Less segments with same granularity. • A bit abstract still. To be clarified. • Read-Out Links description • ROD module configuration logic has to be upgraded. • If read-out link is down, should not be used. • If drawers into read-out link are out, read-out link should be disabled. • To be clarified. • Dual timer substitute board (see drawing) • We are paying for material rent every month because we need external trigger source @Valencia and @CERN • 1 NIM output trigger (programable rate) • 1 NIM input busy • VME 6U / PMC for SBC • Engeneering project ROD busy TBM ROD ROD Busy x8 Output trigger source TTCvi Trigger Veto TBM Trigger Busy TDAQ commissioning 20th sept 2007

  6. Schedule • TileCal week 4th-9th october. • DAQ Online Tools split into Maintenance/DAQ development and Operation/DAQ. • Still to clarify agenda. • Next minor TDAQ release 01-08-03 for 11th october. • Need to recompile packages. • No major issues forseen. • I’ll be in Valencia 9th-20th october. • Expect to migrate lab to 01-08-03. • M5 starts 22nd October. • Book shift for high speed session. • No more Mx weeks until february 2008. • At CERN until mid december. TDAQ commissioning 20th sept 2007