Software Phase V Testing and Improvements to Test Procedures

Software Phase V Testing and Improvements to Test Procedures. S. Corder and L.-A. Nyman. Software Phase V Testing - Side effects on CSV/DSO.

nikki
Download Presentation

Software Phase V Testing and Improvements to Test Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Software Phase V Testing andImprovements to Test Procedures S. Corder and L.-A. Nyman ICT Planning Meeting, Santiago

  2. Software Phase V Testing - Side effects on CSV/DSO • The situation now is that we are doing continuous testing on various incremental releases for which only the last one goes into the release candidate (on-line and off-line subsystems) • Testing is a huge staff effort: • Online features often require assessment of full system • Incremental release results in effectively non-stop testing of new offline features. • Delivery of online features monthly but 3 weeks of time to do acceptance testing/verification is inconsistent with realistic scenarios: If CSV spends 2-3 weeks verifying the new system, which is realistic, on that timescale critical resources spend no time doing anything else (Sawada/Barkats/Kamazaki) • Line between testing new features and testing new capabilities is often lost: features enable capabilities but they do not directly provide them. • Current testing/feature load is not maintainable. Possible mitigations: • More testing before phase V • Fewer/smaller new features • Less frequent releases ICT Planning Meeting, Santiago

  3. Testing Improvements /Optimizations • On-line system and regression testing: • Obsmode Testing/Regression: Basic observing modes, sources of known structure, produce data to be used in pipeline/reduction testing. • Testing to prepare a base set for next cycle; Regression to cover the base set from previous cycle. • Pipeline use to reduce the data. Some metrics for data verification that will migrate to the Pipeline (I know this is throw away code…) • Software regressions: • Basic: few, high-level tests with clear pass/fail criteria and automated evaluation tools. Not done in the pipeline for the short term. Tools/metrics in the works that can be passed to the pipeline. • Intensive: cross check of most common failure modes in new feature delivery. Similar automatic evaluation, to be used with new releases. Pipeline reduction in all possible cases. • Performance: Outside the scope of this discussion • Details on Obsmode and Software regression presented later. • What is ICT going to do to make sure that delivered software is less likely to fail before these points? ICT Planning Meeting, Santiago

  4. Low-level changes with large impact –features that may destablize entire system • 32 => 64 bit systems • Multiple concurrent arrays on the baseline correlator • Scalability of data capturer, bulk data system, etc. • Correlator software scalability (data rates) • Coordinated subarrays (SD, 7m separate observations but with common calibration) • Are we missing any? • How can we schedule these and test in a way that mitigates impact on science time? ICT Planning Meeting, Santiago

  5. Testing Improvements /Optimizations • Off-line system (including PT, Ph1M, SLT, AQUA) • Regression testing: • Basic: few, high-level tests with clear pass/fail criteria and automated evaluation tools (many more details to follow) • Setting up a useful test environment: Using a commissioning Archive? ICT Planning Meeting, Santiago