An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EDS 4 DAM/RUC/SASM EDS 4.9 Market Call May 30, 2008 http://nodal.ercot.com 1

  2. ERCOT Anti-Trust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws. http://nodal.ercot.com 2

  3. Agenda • DAM/RUC EDS 4 • Release 9.3 update • Release 8 Update • Q&A and Roll Call • Appendix http://nodal.ercot.com 3

  4. DAM Summary • Thirteen DAMs executed so far (summary of this week below) • May 28- (no guardrails) • Without constraints • Average LMP = $21 • No AS Insufficiency • Procured hourly average of 15,000 MW/hour of Energy • 83 QSEs participated • May 30- (no guardrails) • Without constraints • Average LMP = $50 • No AS Insufficiency • Procured hourly average of 27,000 MW/hour of Energy • 84 QSEs participated • RUC successfully executed for May 28 and 30 • Ran in unconstrained mode to solve capacity shortage only • During April and May ERCOT executed: • 13 DAMs (constrained and unconstrained, last two without guardrails/scripting) • 6 DRUCs, 2 HRUCs, 2 SASMs http://nodal.ercot.com 4

  5. DAM Summary EIP 1.14 released • In Sandbox as of 5/22 • EDS migration 6/5 • Includes following additional functionality related to EDS 4 Release 9.3: • Individual AwardSets (AwardedAS, AwardedCRR, AwardedPTPObligation, AwardedEnergyBid, AwardedEnergyOnlyOffer, AwardedEnergyOffer (aka Three Part Offers)) • When migrated to EDS, QSE can query individual AwardSets from previous markets http://nodal.ercot.com 5

  6. Update on EDS4 Initial DAM/RUC 4.9.3 Testing • At this point in time ERCOT is not planning to execute subsequent DAM, DRUC, HRUC, SASM in the existing environment • ERCOT will maintain and support the existing EDS environment • Allows for QSE market submissions • Allows for downloading of prior market results/awards • Suspension of DAM/RUC execution will allow: • ERCOT to focus on expediting migration to MMS4 for EDS • ERCOT to address missing integration to achieve a more realistic DAM/RUC • ERCOT to develop analytic tools to better respond to market questions • QSE and ERCOT to focus on EIP testing and delivery • MMS4 submission changes, Notifications of awards, RUC instruction, AS Obligations, etc. • Discontinue 4.9.3 DAM/RUC/CommOps market calls but all other communication channels and systems still available (eds4@ercot.com) • NOTE- No changes to other EDS activities (EDS2, EDS3 SCED/LFC/CRR, EDS4 Outages) • Working with Nodal Program and TPTF to coordinate and deliver upgrade to EDS for Day-Ahead Markets and next level of integration among nodal systems. http://nodal.ercot.com 6

  7. Mock RTM Postings • RTM mock Statements and Invoices have been posted to Readiness Center, labeled ‘Mock RTM Settlement Examples’ (http://nodal.ercot.com/readiness/reports/si/index.html) • The posting contents include: • 1-1-08 RTM Initial Settlements – Input data, Output data, Statements • 1-1-08 RTM Final Settlements – Input data, Output data, Statements • 1-4-08 RTM Initial Settlements (No DAM settlement) – Input data, Output data, Statements • RTM Invoices • RTM Late Fee Invoices http://nodal.ercot.com 7

  8. Posting Assumptions and General Information Data Assumptions • All data was originally created for testing purposes and is NOT intended to be production like • Black Start Availability is assumed to be 100% • There were no valid RMR contracts on test operating dates • 1-4-08 is for RTM settlement without DAM execution General Information • Each Operating Date “Settlements Directory” (ex. 1-1-08 RTM Initial Settlements) contains all interval and non-interval input data, output data as well as HTML and XML version of statements • The RTM Invoices directory contains the RTM invoices that invoice Initial Settlements for operating dates 1-1-08 and 1-4-08 • The RTM Late Fee Invoices directory contains all late fee invoices as well as an explanation spreadsheet http://nodal.ercot.com 8

  9. Summary and Q&A To clarify and re-iterate: Only EDS change is that DAM/RUC/HRUC/SASM will not be executed DAM/RUC Environment still available for submission/awards testing No changes to other EDS activities: SCED/LFC/Open-Loop activities requiring COP, O/S, EOC CRR activities Outage Scheduler Q&A / Open ForumRoll-Call http://nodal.ercot.com 9

  10. APPENDICES • Release 8 documents • Release 9.3 Information • DAM notifications available in Sandbox • Upcoming Network Changes • Connectivity information • Links to Key Documentation • Metrics • Data preparation http://nodal.ercot.com 10

  11. Release 8 - Appendix Reports, DDLs, and XSDs posted to Readiness Center: http://nodal.ercot.com 11

  12. Release 8 - Appendix Standard and Mock Statements and Invoices posted to Readiness Center: http://nodal.ercot.com 12

  13. DAM Awards Status of DAM Award Communication Due to integration issues, Notifications delivery moving toward June • Awards queries will likely return compressed payloads given the size of the reports • GetAwardSet composed of: • AwardedEnergyOffer • AwardedEnergyOnlyOffer • AwardedEnergyBid • AwardedAS • AwardedCRR • AwardedPTPObligation • Awards available via Market Manager (display of GetAwardSet) http://nodal.ercot.com 13

  14. DAM Awards DAM awards notification availability in the nodal Sandbox • There is a scheduled job running in Sandbox that sends out notifications once a day (around 11:53 AM CST) • To receive them, you must have your listener configured in the Sandbox environment – if you need it configured, send us an email with your URL (send to eds4@ercot.com) • NOTE: These notifications are generated from static files (pre-formed xmls) • AwardedCRR • AwardedAS • AwardedEnergyBid • AwardedEnergyOffer • AwardedEnergyOnlyOffer • AwardedPTPObligation • ConfirmedTrades • UnConfirmedTrades • OutageSet • ASObligations • StartupShutdownInstructions http://nodal.ercot.com 14

  15. Forthcoming Network Changes Network Changes / site to site fail-over testing (please communicate to your network / firewall teams) • Test to be conducted mid / late March • All QSEs need to have network changes in place no later than 3/14 • The changes should enable receiving / sending data to / from:: • 66.128.16.0/24 • 66.128.17.0/24 • 66.128.18.0/24 • Reminder: required ports do not change (443/80) • Reminder: required protocols do not change (http/https) http://nodal.ercot.com 15

  16. APPENDIX- DAM/RUC 4.9.1 Reference: Relevant Documents http://nodal.ercot.com 16

  17. APPENDIX- DAM/RUC 4.9.1 Reference: Relevant Documents http://nodal.ercot.com 17

More Related