An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Keith GottschalkUCT EMS 2018 Hydro-politics & Hydro-power:the century-long saga of the Grand Inga project

  2. at the Inga rapids on the Congo • 42 000 cubic metres of water per second • fall through 92 metres • & could generate 39 600 MW of electricity • (in practice, need to plan for driest year per century, & will also need to leave some water in river)

  3. Inga timeline • 1920 colonial forced removals. • found village Lubwaku meaning “thrown away” • 1929-1939 Syneba consortium in Belgian Congo. • 1952-1955 Sydelco corporate research group in Belgian Congo. • Colonial Government offers lump sum compensation of 781,000 Belgian francs – but nothing paid by • 1960 Congo wins independence.

  4. Inga timeline continued • 1970 SociétéNationaled'électricité (SNEL) founded; nationalizes existing power companies by end of decade • 1972 Inga 1 synchronized with the grid: 351 MW for Kinshasa & district.

  5. Henry Olivier • 1976 • proposes Pan-African grid

  6. Inga timeline continued • 1982 Inga 2 synchronized with the grid: 1 424 MW for Katanga province, its mines, & smelters. • 1995 Inga 2 starts wheeling 100 MW electricity through Southern African Power Pool to Eskom

  7. Inga 2 transmission cable • built 1982 • 1 424 MW • 1 774 kms • World long distance record for transmission

  8. WESTKOR • 2003: incorporate Westkor in Botswana – to build Inga 3 & a “western power corridor” running directly south through Angola & Namibia to Cape Town @ 600 000 volts to minimize losses; • 2004: MoU • 2005 “pre-feasibility study” • But Eskom puts up no capital (unlike R8b in PBMR), so DRC withdraws in 2010 • Westkor wound up in 2012

  9. Grand Inga Treaty29 October 2013 • Eskom to provide 15% of the equity towards construction; • to become the anchor customer and buy 2500 MW from Inga 3; • plus between 20% and 30% of generation from further developments (Treaty 2013, Article 9[4]). (“20-30%” is between 10 000 – 13 000 MW) • to build transmission cables from SA to DRC

  10. Inga timeline • 2013 Presidents Kabila & Zuma sign Inga treaty. • 2016: at World Bank insistence, ADEPI (Inga Development Authority) established. • Kabila appoints as ADEPI director Bruno Kapandji, veteran electricity technocrat

  11. Inga timeline continued • 2018 earliest possible date for building start on Inga 3. • 2026 earliest feasible date for Inga 3 to synchronize with the grid: • 4 800 MW for domestic, corporate, & foreign clients. • 2030s – 2040s earliest possible construction of remaining 5 stages of Grand Inga in seven year phases: up to 10 000 MW for each of the DRC, Egypt, & SAPP; 8 000 MW for WAPP.

  12. Inga 2 no longer enough • lack of maintenance reduces power from Inga 1 & 2 • 2014: electricity caps imposed on Katanga mines & smelters • who now import 100 MW from Zambia • 91% Congolese no access to electricity • the 9% of Congolese households electrified • suffer average 3 hours of power failure per day • which cuts 1.7% off DRC’s GDP

  13. 1995: Southern African Power Pool • Iinks national power grids of SA, B,L,N,S, DRC, Mozambique, Zambia, Zimbabwe • Inga 2 transmits 110 MW exported to Eskom • through 3 757 kms of cables through DRC, Zambia, Zimbabwe, Botswana to SA (current world long distance record?) • “Western Power Corridor” also proposed in 2003; Eskom sent land surveyors to DRC, Angola, Namibia to finalize route – but not yet built!

  14. Proposed Grand Inga transmissioncables

  15. update • 2016 World Bank withdraws in protest that ADEPI is not independent enough from President’s office • 2017 Kabila asks Chinese and Spanish tender finalists to merge bids – presumably with vendor financing (plus NDB, AfDB, DBSA, IDC, Harith) • 2017 Bruno Kapandji (director ADEPI) proposes Inga 3 be doubled in size to generate 10 000 MW to benefit from economies of scale • SNEL – still stalling on paying compensation to the fourth generation of descendants of evictees of 1920

  16. Conclusions • Incremental shift of SA to imported hydro-power will save 500 billion litres of cooling water per year • 9 600 MW from new nuclear power stations unneeded, & more expensive than Grand Inga. • Hydropower good fit with solar & wind energy; flexible at switching on & off; • Historically, state mega-projects cost about double what was originally claimed; but even so Inga hydro-power will be less expensive electricity than alternatives;

  17. More Conclusions • Congolese & other kleptocrats will try hard to get slice of capex; • Democratization will be useful in DRC & other states • partly conditional on the above, deepening diplomatic & economic integration between SA, DRC, & other SADC states will be a net positive factor for both peace & development