LRTSG meeting 2 to discuss Draft 2014-2018 5-Year Plan Goals and prioritize diagnostics

LRTSG meeting 2 to discuss Draft 2014-2018 5-Year Plan Goals and prioritize diagnostics. Eisenhower, eve of D-day invasion: “In preparing for battle, I have always found that plans are useless but planning is indispensable.”. Introduction 5-yr Fusion landscape PFCs Diagnostics.

nell-cantu
Download Presentation

LRTSG meeting 2 to discuss Draft 2014-2018 5-Year Plan Goals and prioritize diagnostics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LRTSG meeting 2 to discuss Draft 2014-2018 5-Year Plan Goals and prioritize diagnostics Eisenhower, eve of D-day invasion: “In preparing for battle, I have always found that plans are useless but planning is indispensable.” Introduction 5-yr Fusion landscape PFCs Diagnostics US Army Generals Omar Bradley, Dwight Eisenhower, and George S. Patton Friday September 16th at 2:00 PM

  2. Peng presentation: “Fusion Nuclear Science Facility (FNSF) – Motivation, Role, Required Capabilities” advprojects.pppl.gov/Roadmapping/agenda.asp Fusion Sci Technol 2011 vol. 60 (2) pp. 441-448

  3. Fusion landscape will change in 5 years: • FNSF objective: Provide a continuous fusion nuclear environment of copious neutrons, to develop experimental database on nuclear-nonnuclear coupling phenomena in materials in components of plasma-material interactions, tritium fuel cycle, and power extraction. Including: • To maintain plasma T and n profiles and purity for ~106 s (12 days) – divertors capable of handling peak heat flux 10 MW/m2 and control the plasma density continuously using fueling, pumping, heating and current drive. Peng Roadmap workshop presentation: “Fusion Nuclear Science Facility (FNSF) – Motivation, Role, Required Capabilities” advprojects.pppl.gov/Roadmapping/agenda.aspFusion Sci Technol 2011 vol. 60 (2) pp. 441-448 (Time delayed + 10y, but T also decayed). Abdou presentation: advprojects.pppl.gov/Roadmapping/agenda.asp Compact tokamaks ease requirements on tritium breeding and expense. $38 million / T-kg 55.6 kg per 1000 MW fusion power per year without T breeding.

  4. Physical Processes

  5. NSTX-U PFC options: PFC choice will need separate discussion - see Jon’s PFC matrix Note: NSTX-U max P/R ~ 30 actually higher than ITER P/R ~ 24

  6. Heat loads at max Ip, Pheat > ITER Menard et al., Overview of Physics and Engineering Design of NSTX-UISFNT preprint (2011) Table 1 max Ip, Pheat case: (1D) Gernhardt ASC 5-yr presentation Nd laser detritiation ~ 1500 C

  7. Group input p.1:

  8. Group input p.2: