Coalinga S2S: Solar-thermal EOR Binyamin Koretz Director, Strategic Planning & IP

Coalinga S2S: Solar-thermal EOR Binyamin Koretz Director, Strategic Planning & IP. Coalinga Solar to Steam Project (S2S). Owner: Chevron Location : Coalinga, CA Purpose: Thermal Enhanced Oil Recovery Capacity: 29 MWth Solar field: 3,822 heliostats, each 15 m 2

nassor
Download Presentation

Coalinga S2S: Solar-thermal EOR Binyamin Koretz Director, Strategic Planning & IP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coalinga S2S: Solar-thermal EOR Binyamin KoretzDirector, Strategic Planning & IP

  2. Coalinga Solar to Steam Project (S2S) • Owner: Chevron • Location: Coalinga, CA • Purpose: Thermal Enhanced Oil Recovery • Capacity: 29 MWth • Solar field: 3,822 heliostats, each 15 m2 • BrightSource delivered fully operational project to Chevron in October 2011 • 1-year performance test exceeded contractual goals

  3. Coalinga S2S

  4. Coalinga vs. future EOR plant

  5. Solar EOR – general scheme

  6. Coalinga S2S 1-line diagram

  7. Construction 2009-2010

  8. What happens when engineers make videos

  9. View from the south

  10. Typical performance vs. modeling

  11. And on more difficult days

  12. Potential market • Chart Source: CERA estimate of cumulative solar thermal penetration in thermal enhanced oil recovery market by 2020

  13. Thank you