An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Surveying and Digitizing

  2. Primary Data Sources • Measurements • Field → surveying • Lab (not covered here) • Remotely sensed data • already secondary? • Creating geometries • Definitely in the realm of secondary data • Digitizing • Scanning

  3. Surveying • Measurements and measurement techniques • Distances • Angles • Position determination • Applications • Traversing and mapping • Construction and earthwork • Boundary surveys

  4. Definition of Surveying • General • To inspect, view, scrutinize, or examine • To determine condition, situation, or value • Specifically • Science and art of determining relative positions of points above, on, or beneath earth surface

  5. Uses of Surveying • Locate/map resources • Engineering design • Layout construction or engineering projects • Verify performance • Acquire reliable data • Provide control • Usually for location

  6. History of Surveying • Early applications • Boundary location • Construction • Mapping • Early surveys limited by technology • Crude and inconsistent methods • Development of sighting devices, standards, …

  7. History of Surveying (2) • Industrial revolution improved surveying • Advances in available materials • Improvement in tools • Electronics revolution  fundamental advances • Electronic distance and angle measurement • Satellite surveying • Enhanced processing

  8. Specific Types of Surveying • Property (cadastral) surveying • Control surveying • Mapping surveying (planimetric or topographic) • Photogrammetric surveying • Construction (engineering) surveying • Route surveying • Hydrographic surveying

  9. Surveying Measurements • Two quantities measured in surveying • Lengths • Angles • All measurements are imperfect • Errors • Mistakes

  10. Measurement Errors • Sources of errors • Natural • Instrumental • Types of errors • Systematic • Random • Terms used in describing errors • Precision • Accuracy • Personal

  11. Idea of Relative Position • Question: Have the points moved? • Answer: Relative to what? • References • Needed for expressing location of points, lines, other objects • Datums provide references in surveying • Horizontally • Vertically

  12. f = flattening e = eccentricity Reference Ellipsoids Basic Concept a = semi-major axis b = semi-minor axis

  13. Example Reference Ellipsoids GRS = Geodetic Reference System WGS = World Geodetic System ITRS = International Terrestrial Reference System

  14. Ignoring Earth Curvature • Distance ( 5 miles .006m 8000 + 0.25”) 8000.000m ( 5 miles) 1000 km  998.95 km

  15. Ignoring Earth Curvature (2) • Level line Horizontal plane 1 mile (1609 m) 8 inches ( 20 cm) Level surface

  16. Ignoring Earth Curvature (3) • Triangle geometry Sum of Interior Angles = 180° 00' 01" 75 mi2(48,000 acres)19,800 hectares

  17. Digitizing and Scanning • Instruments • Georeferencing • The process and problems associated with it • Automation • Formats

  18. Why Do We Have To Digitize? • Existing data sets are general purpose, so if you want something specific you have to create it • In spite of 20+ years of GIS, most stuff is still in analog form • Chances are somebody else has digitized it before; but data sharing is not what it should be

  19. Digitizer • Digitizing table10” x 10” to 80” x 60”$50 - $2,0001/100th inch accuracy • Stylus or puck with control buttons

  20. The Digitizing Procedure • Affixing the map to the digitizer • Registering the map • Actual digitizing • In point mode • In stream mode

  21. Georeferencing • at least 3 control pointsaka reference points or tics • easily identifiable on the map • exact coordinates need to be known

  22. Digitizing Modes • Point mode • most common • selective choice of points digitized • requires judgment • for man-made features • Stream mode • large number of (redundant) points • requires concentration • For natural (irregular) features

  23. Problems With Digitizing • Paper instability • Humidity-induced shrinking of 2%-3% • Cartographic distortion, aka displacement • Overshoots, gaps, and spikes • Curve sampling

  24. Errors From Digitizing • Fatigue • Map complexity • ½ hour to 3 days for a single map sheet • Sliver polygons • Wrongly placed labels

  25. Digitizing Costs • Rule of thumb: one boundary per minuteergo:appr. 62 lines= more than one hour

  26. Automated Data Input (Scanning) • Work like a photocopier or fax machine • Three types: • Flatbed scanners • A4 or A3 • 600 to 2400 dpi optical resolution • $50 to $2,000 • Drum scanner • practically unlimited paper size • $10k TO $50k • Video line scanner • producesvector data

  27. Requirements for Scanning • Data capture is fast but preparation is tedious • Computers cannot distinguish smudges • Lines should be at least 0.1 of a mm wide • Text and preferably color separation • AI techniques don’t work (yet?) • Symbols such as  are too variable for automatic detection and interpretation

  28. Semi-automatic Data Input(Heads-up Digitizing) • Reasonable compromise between traditional digitizing and scanning • Much less tedious • Incorporating your intelligence

  29. Criteria for Choosing Input Mode • Images without easily detectable line work should be left in raster format • Really dense line work should be left as background image – • unless it is really needed for automatic GIS analysis; in which case you would have to bite the bullet

  30. Conversion from Other Databases • Autocad .dxf and dBASE .dbf are de facto standards for GIS data exchange • In the raster domain there is no equivalent; .tif comes closest to a “standard” • In any case: merging data that originate from different scales is problematic – in the best of all worlds; there is no automatic generalization routine