1 / 3

Tasks, Milestones and Manpower March 4, 2005

Tasks, Milestones and Manpower March 4, 2005. Optimize kinematics, rates, conditions?  run plan (Lingyan and Xiaodong) Simulations: background, physics, PID, detectors (Xin, Huan, Lingyan and Xiaodong) HRS (Lingyan): Kaon detection (Franco) A1/A2 (Lingyan)

napua
Download Presentation

Tasks, Milestones and Manpower March 4, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tasks, Milestones and ManpowerMarch 4, 2005 • Optimize kinematics, rates, conditions?  run plan (Lingyan and Xiaodong) • Simulations: background, physics, PID, detectors (Xin, Huan, Lingyan and Xiaodong) • HRS (Lingyan): Kaon detection(Franco) A1/A2 (Lingyan) • BigBite (beyond Gen) (Doug, Nilanga?) Supporting Structure(Doug) Background test(Lingyan) new Cherenkov? (Brad) Other detectors?(Nilanga?) • Trigger and DAQ(?), Analysis software(Xiaodong) • Luminosity Monitoring (Xiaodong)

  2. Transversity Tasks (II) • Polarized 3He target (Todd, JP) Polarization reversal adiabatic RF flip (Huan) laser polarization reversal (Lingyan) Vertical coils (Al, J.C.) Target ladder-oven system (Al, Todd, JP) Cells (Gordon, Todd) Optical lines (JP, ?) NMR (Huan, Todd) EPR (Xin, Wolfgang?) Field measurement (Wolfgang?)

  3. Possible Milestones • Pol. 3He Polarization Flip: 12/05 Vertical Coil: design 8/05, construction 12/05 Oven-ladder: design 12/05, construction/testing 3/06 Cells: start production 12/05, 15 cells 8/06 Optics: design 10/05, test 3/06 NMR/EPR: test 6/06 Field Measurement: 3/06 • BigBite Cherenkov: design/construction 3/06, test 6/06 Support structure: will be ready for Gen • HRS RICH: upgrade 12/05 • Trigger/DAQ/Analysis Software: 8/06 • Ready for experiment: 10/06

More Related