1 / 6

HBD HV Control and Monitoring System

HBD HV Control and Monitoring System. A Gain vs. HV study throughout Run-9 – PART 1 –. Manuel Proissl HBD Meeting 06/16/2009. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16 th , 2009.

mshabazz
Download Presentation

HBD HV Control and Monitoring System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HBD HV Controland Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009

  2. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16th, 2009 RESOURCES OF INFORMATION • The HBD HV Server possess a very stable and precisely timed HV data backup process, which clearly stands out of the crowd, as it stores the complete status of every 1471N module every 7 seconds (esp. for TripProtect) as well as HV Control internal activities by system request from the control core. The entire system has been extremely crash tested and is very reliable. • Blaming this system for RANDOM fluctuation in module gain is the wrong approach to this issue! • All this HV information is publically available in our database: hvdb • In terms of gain, all runs that have successfully passed OnCal are stored in the Phenix database. With that information one can retrieve the gain via running our root analysis script. HBD HV Control & Monitoring System Manuel Proissl Page 2 of 5

  3. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16th, 2009 THE BASELINE FOR FURTHER STUDIES • In order to have a look at the latest produced runs, one may login as phoncs to any VA machine and run the following program: • $> hbd/gain/glookup • Provide a runnumber that has • passed OnCal • Result for example for Run 289071 • (last Sunday evening): RUNNUMBER:    288066BEGIN:        2009-06-08 03:50:17END:          2009-06-08 04:48:05EVENTS:       18437439+++++++++++++++++++++++ Gain vs. HV for Run#288066 ++++++++++++++++++++++-------------------------------------------------------------------------Module    |    DV_mean    |    MV_mean    |    Gain    |    Status-------------------------------------------------------------------------ES1    |    0    |    0    |    0.935784  |    FAILED: ZEROES2    |    3880    |    3880.36    |    6.79559    |    SUCCESSES3    |    3954    |    3954.56    |    6.09659    |    SUCCESSES4    |    3804    |    3804.35    |    5.79865    |    SUCCESSES5    |    3876    |    3876.6    |    7.31137    |    SUCCESSEN1    |    4000    |    4001.21    |    3.35373    |    SUCCESSEN2    |    3867    |    3868.09    |    3.87023    |    SUCCESSEN3    |    3980    |    3980.55    |    5.86731    |    SUCCESSEN4    |    3838    |    3839.1    |    3.2634    |    SUCCESSEN5    |    3913    |    3913.63    |    7.29307    |    SUCCESSWS1    |    4037    |    4036.56    |    5.16927    |    SUCCESSWS2    |    3941    |    3940.86    |    5.38924    |    SUCCESSWS3    |    3843    |    3844.31    |    5.72362    |    SUCCESSWS4    |    3855    |    3856.55    |    5.60244    |    SUCCESSWS5    |    3916    |    3916.59    |    4.39763    |    SUCCESSWN1    |    3941    |    3941.03    |    5.73651    |    SUCCESSWN2    |    3930    |    3930.58    |    5.71409    |    SUCCESSWN3    |    3839    |    3839.44    |    5.53937    |    SUCCESSWN4    |    3858    |    3858.26    |    5.52579    |    SUCCESSWN5    |    3990    |    3990.72    |    5.20858    |    SUCCESS------------------------------------------------------------------------- HBD HV Control & Monitoring System Manuel Proissl Page 3 of 5

  4. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16th, 2009 THE BASELINE FOR FURTHER STUDIES • A very different program is currently running for the past 33 hours to analyze the entire data from Run-9 and automatically generates a new database that will provide the baseline for further studies; in particular with the purpose to determine if our idea of a gain correction curve based on P/T has to be “slightly” adjusted in order to guarantee more stable performance in Run-10. The completion of this database is expected to be today, 06/16 at 2:30pm. Access tools for the Web as well as command line will be provided shortly after… • Higher P/T: lower Gain --- Lower P/T: higher Gain • In order to follow these P/T variation, we adjust the HV, which is in theory absolutely correct… However, as we’ve seen multiple times in Bob’s lab: Adjusting the HV results moreover (easily) in “over-adjusting” the Gain. • On the other hand, gain can also change without any change in HV! HBD HV Control & Monitoring System Manuel Proissl Page 4 of 5

  5. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16th, 2009 GAIN CHANGES: HV CONST HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5

  6. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16th, 2009 GAIN CHANGES: P/T WITHIN T1 BIN HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5

More Related