Power Monitoring And Control System (PMACS)

Power Monitoring And Control System (PMACS). NEPTUNE Preliminary Design Review 4-5 December 2003 Chen-Ching Liu, Ting Chan, Kevin Schneider. Overview. Compliance matrix PMACS State estimation and topology error identification Load management and emergency control Fault location.

mimi
Download Presentation

Power Monitoring And Control System (PMACS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Monitoring And Control System (PMACS) NEPTUNE Preliminary Design Review 4-5 December 2003 Chen-Ching Liu, Ting Chan, Kevin Schneider

  2. Overview • Compliance matrix • PMACS • State estimation and topology error identification • Load management and emergency control • Fault location

  3. Compliance Matrix

  4. Base 46 node system • 2 shore stations • 46 BU’s • 46 Science nodes • 3000 Km of cables

  5. PMACS

  6. PMACS • PMACS functions are performed at two shore stations, and possibly a third control station • input signals are received from science nodes • command sequences are sent to science nodes

  7. State Estimation and Topology Error Identification

  8. State Estimation • By using a limited number of measurements, the state of the system can be estimated • Allows for the identification of “bad” data • Reduce errors in estimated states

  9. Unobservability Issue backbone branching unit backbone single-conductor spur cable to science node, 2½ water depths sensor long “extension cord” science node sensor up to 100 km Instrument module short “extension cord” sensor up to 1 km sensor

  10. Weighted Least Square (WLS) : Column vector of measured science node voltages and currents :Column vector of estimated BU voltages

  11. Calculated Residual • Helps to identify “bad data” • Gives an estimate of the accuracy of the estimation n:number of measurements

  12. Topology Error Identification • Allows for the possibility of a single back bone breaker being out of position • Method should also work for multiple breakers out of position, but this has not been verified

  13. Method of Topology Error Identification • Voltage at each shore station is varied independently • Variation of residual is then examined

  14. Correct Topology

  15. Incorrect topology

  16. Load Management and Emergency Control

  17. Load Management • Uses values from science nodes, shore stations, and state estimation to determine if the current system load violates any limits • Interfaces with Observatory Control System • Performs traditional security assessment in a limited manner

  18. Power Flow with Zener Diodes Where: PGi=Power injected at node I, source PDi=Power removed at node I, load. Yik=Resistance of the line between node I and k VZ=Voltage drop of zener diodes m=number of BU’s

  19. Emergency Control • If/when the load management module determines that a system limit has been violated, emergency control attempts to correct the problem • Can adjust shore station voltages • Can shed load at science nodes

  20. Adjustment of Shore Station Voltage • The sensitivity coefficients of the node(s) that have violated a limit are calculated • The shore station voltage is then adjusted by the amount calculated

  21. Load Shedding • The science node loads are tentatively categorized into three load classes • High • General • Deferrable

  22. Load Shedding Cont. • The sensitivity coefficients of the node(s) that have violated a limit are calculated • The load is then shed by the amount calculated

  23. Fault Location

  24. Fault Location • Determine the location of backbone cable fault to within 1 km • Use voltage and current measurements at two shore stations • Models include cable resistances and BU voltage drops

  25. Assumptions • Faulted link is known based on result of state estimation • Network topology is known and fixed (all breakers closed onto the fault) • Resistances of cables and BU voltage drops can be calculated using state estimation • BU voltage drops are constant assuming Zener diodes are operating in saturated region

  26. Fault Current Characteristics • Type 1 • If from each end known • Type 2 • If from each end not known • Type 3 • If from one end known

  27. Fault Location Formulation • For a Zero- ground fault, multiple non-linear equations can be set up based on Ohm’s Law and Loop Analysis • VNode = VPrevious Node + ILink * RLink + BU Voltage drop • All breakers closed onto the fault • Negative shore station voltage outputs

  28. Distance Calculation • Cable resistance = 1 /km • BU voltage drop = 15.2V per link (Zener diodes in saturated region) • Measurement errors = 0.01% (voltage and current)

  29. Voltage and Current Requirements • If faulted link is known before taking measurements • Apply predetermined voltage levels at both shore stations • Ensure backbone currents in branches are sufficient without causing over-current violation • If faulted link is not known before taking measurements • Increase current outputs at both shore stations until the total current output reaches limit