1 / 1

MNR

FBI Information Technology Life Cycle Management Directive (IT LCMD), Version 3.0. SCR. Sys TRR. OAR. APR. FDR. DRR. DR. Control Gates. Control Gates. CDR. PDR. DCR. SATR. MNR. SSR. SSAR. CIR. RCR. PTRR. STRR. AOR. TR. ORR. Project Level Reviews. Project Level Reviews.

morton
Download Presentation

MNR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FBI Information Technology Life Cycle Management Directive (IT LCMD), Version 3.0 SCR Sys TRR OAR APR FDR DRR DR Control Gates Control Gates CDR PDR DCR SATR MNR SSR SSAR CIR RCR PTRR STRR AOR TR ORR Project Level Reviews Project Level Reviews CMMI Process Areas Process Areas Process Areas Key Support Processes Life Cycle Phases Life Cycle Phases • Tailoring • Allowed & Expected • Project Manager’s Responsibility • Documented in Project Plan • Reviewed & Agreed to at Control Gate 2 - Acquisition Plan Review • Considerations • Complexity, Interfaces, Budget, Schedule, Risk, User Needs • Typical Approaches • Combination / Elimination of Events; Modification of Reports, Documents, or Deliverables; Phase Iteration • Bottom Line: • Accommodate Both LCMD Intent & Project’s Needs Accessible on FBI Intranet at:http://oipp.fbinet.fbi/ppmu/LCMD For more information contact the Office of IT Policy & Planning (OIPP): Process, Policy & Metrics Unit (PPMU)

More Related