An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014

  2. For memory: Scientific Motivation • To test equipment under the worst case conditions it may encounter in case of full beam impact • To validate the diluting materials used in TPSG4 • To demonstrate the MSE is properly protected by TPSG4 • To benchmark advanced numerical simulations HiRadMat Operations meeting 5/3/2014

  3. Test setup overview MSE TPSG4 Beam HiRadMat Operations meeting 5/3/2014

  4. The real deal! HiRadMat Operations meeting 5/3/2014

  5. Dismantling procedure mentioned in the safety file of HRMT#6, presented during safety review of 28/9/2012. Phase Post-Irradiation et Démontage HiRadMat Operations meeting 5/3/2014

  6. RP Analysis Estimated dose (06/2012) Real dose(11/2012) MSE TPSG4 HiRadMat Operations meeting 5/3/2014

  7. Proposed planning April 2014 • Week 14: leak test of MSE in TNL (20bar He). • Week 15: removal equipment from TNL: • MSE -> blg 955 • TPSG4 -> blg 867 • hydraulics rack and electronics and frames -> blg 955 • Wk 16: removal of TPSG4 from vacuum vessel in bunker of blg 867 for visual inspection. • Wk 17: planning of repair of TPSG4 (worst case), insertion of TPSG4 in tank to be stored in blg 955. HiRadMat Operations meeting 5/3/2014

  8. Radioprotection related issues • WDP, to be done still • IMPACT, to be created for HRMT. A separate one for 867? • Specific RP requirements for bunker? HiRadMat Operations meeting 5/3/2014