An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of Feasibility cum Masterplan for Development of Turf Club in Punjab PRE- BID CONFERENCE Date 15.06.2012

  2. Background • Department of Animal Husbandry is administrative department of project. • Punjab Infrastructure Development Board (PIDB), a nodal agency set by Government of Punjab. • IL&FS IDC -as Project Development Advisor • The area allocated for the project is around 250 acre in Ludhiana District, Punjab. • The facility is expected to include Turf Club & other national and international level equestrian activities as well, viz. club house complex, horse riding club for children, etc. • The Project also envisages various related support infrastructure like five star hotel and Amusement park and other Leisure activities, etc . Pre Bid Conference

  3. Institutional Structure • DEPARTMENTS INVOLVED • Department of Home Affair & Justice. • Department of Excise and Taxation G.O.P PIDB ANIMAL HUSBANDRY NODAL AGENCY FOR DEVELOPING THE PROJECT ON PPP ADMINISTRATIVE DEPARTMENT FOR DEVELOPMENT OF THE PROJECT IL&FS IDC PROJECT DEVELOPMENT ADVISOR Pre Bid Conference

  4. Selection Process TWO STAGE PROCESS TECHNICAL EVALUATION Only those Applicants whose Technical Proposals score 70 marks or more out of 100 shall qualify. QUALITY- COST BASED SELECTION- 70:30 FINANCIAL EVALUATION SELECTED BIDDER Pre Bid Conference

  5. Eligibility Criteria TECHNICAL CRITERIA Over the past 15 (Fifteen) years preceding the PDD, undertaken a minimum of [2 (two)] Eligible Assignments. FINANCIAL CRITERIA The Applicant shall have received a minimum average annual income of [Rs. 7 (seven)] crore per annum from professional fees during the last 3 (three) financial years i.e. till March 2011 preceding the Proposal Due Date. Pre Bid Conference

  6. Eligible Assignments • Turf Club • The Turf Club should have been registered in the turf authority/federation of respective countries. • Masterplan and Conceptual Design of the following Components:- • Race Tracks with minimum length of 1200 of meters • Grand Stand with minimum capacity of 3000 spectators • Stables for 500 Horses • Betting Arena]; or Pre Bid Conference

  7. Eligible Assignments • [Upgradation of Turf Club • Project Cost of Upgradation should be more than 200 crores which will include Upgradation or redevelopment of the following components:- • Redevelopment of racecourse which involves extension and widening of the existing tracks. • Masterplan and Conceptual Design of the following Components:- • Redevelopment of Grand Stand with minimum capacity of 3000 spectators. • Redevelopment of Stables for 500 Horses. • Redevelopment of Betting Arena]; or Pre Bid Conference

  8. Eligible Assignments- Cont… • Equestrian Sports Centre • Masterplan and conceptual design of equestrian Sports Complex of International Level. • Design of Grand Stand with minimum capacity of 3000 spectators. • Design of stable for 250 horses. • Design of show jumping arena Pre Bid Conference

  9. Proposal Requirement • Method of Selection : Quality and Cost Based Selection (QCBS) • Quality Cost Ratio : 70 : 30 • Bid Security: INR 2 Lakh. • Proposal Validity Period : 90 days • Proposal shall be submitted in English Language • Format of Technical Proposal : Full Technical Proposal Pre Bid Conference

  10. Evaluation Criteria Minimum Technical Score required to pass : 70% Pre Bid Conference

  11. Financial Score • Formula for Financial Score Sf = 100 * Fm/F Sf : Financial Score Fm : Lowest Price F : Price Proposal Under Consideration • Weights given to Technical and Financial Proposals are T = 70% and P = 30% • Combined and final evaluation • 3.4.1 Proposals will finally be ranked according to their combined technical (ST) and financial • (SF) scores as follows: • S = ST x TW + SF x FW • Where S is the combined score, and TW and FW are weights assigned to Technical Proposal and Financial Proposal that shall be 0.70 and 0.30 respectively Pre Bid Conference

  12. Bidding Process Release of NIT 25th May 2012 Issue of RFP Documents 25th May 2012 15th June 2012 Pre –Bid Meeting Submission of Technical & Financial Proposal 9th July 2012 9th July 2012 Opening of Technical Proposals Opening of Financial Proposals of Technically Qualified Bidders July 2012 Selection of Preferred Bidder and Issue of Notice of Award July 2012 Team Mobilization/ Commencement of Work July 2012 Pre Bid Conference

  13. Objective • The objective of the consultancy is to provide technical assistance to GoP in the development of a world class Turf club with all the facilities of international standards. Pre Bid Conference

  14. Scope of Work- Cont… Assessment and analysis of existing site: • Selection of Site- The consultant will undertake a site suitability study for the two sites available near Ludhiana. • Assessment of land at the selected site and possibility for future expansion • Assessment of land requirement and land acquisition requirement if any • Assessment of Infrastructure facility like water supply, sewerage, drainage facility • Identification of external infrastructure development • Consultant shall list all the clearances required for the project • Consultant shall also assess the potential of proposed site for commercial development and identify and propose the type and size of commercial activities possible site Pre Bid Conference

  15. Scope of Work • Prepare the conceptual plan and design for the entire turf club. • Standardizing - laying specifications as per their respective international & national federations for turf club support infrastructure & facilities. • Planning & standardizing entire operation/activity of racing in accordance to the guidelines of international horse racing federation. Pre Bid Conference

  16. Scope of Work- Cont… • Providing technical inputs as per international/national guidelines, as & when required for designing facilities, equestrian sports, betting law, breeding & veterinary hospital till the award of final work order or signing of final agreement with the concessioner. • Assistance in preparation of tender documents/concession agreement and bid evaluation. • Conceptual design and specifications for water treatment plant, water reservoirs, water features, surface contouring of water features, irrigation and drainage. • Environmental impact assessment of the project and detailing measures required for mitigating adverse impacts if any. Pre Bid Conference

  17. Scope of Work- Cont… Preliminary Design and Conceptual Masterplan: • The consultant shall carry out preliminary design and prepare alternative concept plan for Turf Club. Identification and listing of essential and desirable components in term of infrastructure, support infrastructure, amenities, etc and recommended components for the proposed project. • Outline design for Turf Club and components, their sizing, configuration and preliminary design structure. The design shall be in conformation with applicable norms, standards, guidelines. Pre Bid Conference

  18. Scope of Work- Cont… Master Plan shall include: • Prevalent building regulation and developmental guidelines. This may include ground coverage, setbacks, maximum permissible built-up area, permissible building height, use of basement etc. • Site layout with plot boundary, setbacks and other applicable development control guidelines • Spatial arrangement of components including utilities and support infrastructure and sizing of components • Area statement for each proposed components • Parking arrangement • Circulation plan Pre Bid Conference

  19. Scope of Work- Cont… Cost Estimations: • The consultant shall undertake cost estimate as per applicable Schedule of Rate for each and every component of the proposed facilities. • The consultant shall provide in detail a schedule of fixed and variable operating and maintenance cost of the facility at various stages of utilization These costs shall be used by GoP for estimation of landed project cost and all financial analysis and calculation. Pre Bid Conference

  20. Proposed Team Structure Pre Bid Conference

  21. Time Schedules and deliverables Pre Bid Conference

  22. Sites In Punjab- Ladhowal and Mattewara Mattewara Ladhowal Ludhiana Pre Bid Conference

  23. Location of Site- Mattewara Pre Bid Conference

  24. Location of Site- Mattewara

  25. Location of Site- Ladhowal Pre Bid Conference

  26. Thank You