UNIVERSITAS GUNADARMA FAKULTAS TEKNIK SIPIL DAN PERENCANAAN PERENCANAAN FONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTA Nugraha Sadeli Utama NPM 10307065. LATAR BELAKANG.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' LATAR BELAKANG' - meryl


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

UNIVERSITAS GUNADARMAFAKULTAS TEKNIK SIPIL DAN PERENCANAANPERENCANAANFONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTANugrahaSadeliUtamaNPM 10307065


Latar belakang
LATAR BELAKANG

Dalampembangunansuatuproyekkonstruksidibutuhkanperencanaanstruktur yang kuat, aman, dannyaman. Salah satubagianbangunanuntukmendukunghaltersebutadalahfondasi.

Fondasimerupakanbagian yang pentingdalambangunan, karenaitupertimbanganteknisdalammemilihtipe, menentukankedalamandandimensi, kapasitasdukungdanmerancangstrukturnyamerupakanhal yang harusdipelajaridenganbaik.


Tujuan
TUJUAN

TujuandaripenulisantugasakhiriniadalahuntukmerencanakandesainfondasitiangborpadaproyekGedung IKPT Jakarta yang meliputi:

  • Dimensifondasitiang bor.

  • Dayadukungfondasitiang bor.

  • Penurunanfondasitiang bor.

  • Dayadukung lateral fondasitiangbordandefleksiakibatbeban lateral.

  • DimensiPile Cap.


Batasan penulisan
BATASAN PENULISAN

Padapenulisantugasakhirini, penulismembatasipembahasanpada:

  • Perencanaandesainfondasitiangbormenggunakancara manual.

  • Perencanaandesainfondasitiangbormenggunakanbantuan program Plaxis.



Fondasi
FONDASI

Fondasiadalahbagiandarisuatustrukturbangunan yang berfungsiuntukmeneruskanbebandaristrukturatasketanah, baikakibatbebanvertikalmaupunbeban horizontal.


JenisFondasiSecaraUmum


Fondasi tiang bor
FondasiTiangBor

Hampir di setiapproyekkonstruksifondasitiangmerupakanteknologifondasidalam yang telahjamakdipergunakan. Salah satumetodepemasangantiangfondasiiniadalahdengansistem bor.

Kedalamandan diameter daritiangbordapatdivariasidenganmudah, fondasitiangbordipakaiuntukbebanringanmaupunbebanberatsepertibangunanbertingkattinggidanjembatan.


ContohPelaksaaanKonstruksiTiangBor


Metode perencanaan
METODE PERENCANAAN

Diagram AlirTugasAkhir


Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual


Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual


Diagram AlirAnalisisDesainFondasiTiangBordengan Program PLAXIS


Hasil pembahasan
HASIL PEMBAHASAN

  • Digunakandimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m.

  • Berdasarkanhasilperhitungandiperolehdayadukungsebesar:


  • Penurunan yang terjadiberdasarkancara manual:

    Penurunanyang terjadiberdasarkan program PLAXIS:


Sedangkanuntukpenurunankelompoktiangdiperolehpenurunansebesar 0,0020 m sampai 0,0101 m.

  • Dayadukung lateral tiangadalahsebesar:

    Defleksiyang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m.


  • Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.


Kesimpulan
KESIMPULAN

  • Berdasarkanhasilperhitungan, diperolehdesaindimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m.

  • Berdasarkanhasilperhitungandiperolehdayadukungfondasitiangborsebesar 65,02 ton sampai 127,82 ton.

  • Berdasarkanhasilperhitungandiperolehpenurunanfondasitiangbortunggalsebesar 0,0234 m sampai 0,0468 m. Sedangkanuntukpenurunankelompoktiangdiperolehpenurunanterbesarsebesar 0,0020 m sampai 0,0101 m.


  • Berdasarkanhasilperhitungandiperolehdayadukung lateral tiangborsebesar 11,22 ton sampai 17,61 ton. Defleksi yang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m.

  • Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.


Saran
SARAN

Dalammelakukanperencanaanfondasihalpenting yang harusdiperhatikanadalahkarakteristiktanahdimanabangunantersebutakandidirikan. Olehkarenaitumutlakdiadakanpenyelidikantanah (soil investigation) terlebihdahulu. Selainitu, untukperancanganselanjutnyasebaiknyaseismic designikutdiperhitungkan.


Gambar detail
Gambar Detail

  • FondasiTiangBor

  • Detail Pile Cap Type-1

  • Detail Pile Cap Type-2

  • Detail Pile Cap Type-3

  • Detail Pile Cap Type-4

  • Detail Pile Cap Type-5

  • Detail Pile Cap Type-6

  • Detail Pile Cap Type-7

  • Detail Pile Cap Type-8

  • Detail Pile Cap Type-9