UNIVERSITAS GUNADARMA
This presentation is the property of its rightful owner.
Sponsored Links
1 / 21

LATAR BELAKANG PowerPoint PPT Presentation


  • 99 Views
  • Uploaded on
  • Presentation posted in: General

UNIVERSITAS GUNADARMA FAKULTAS TEKNIK SIPIL DAN PERENCANAAN PERENCANAAN FONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTA Nugraha Sadeli Utama NPM 10307065. LATAR BELAKANG.

Download Presentation

LATAR BELAKANG

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Latar belakang

UNIVERSITAS GUNADARMAFAKULTAS TEKNIK SIPIL DAN PERENCANAANPERENCANAANFONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTANugrahaSadeliUtamaNPM 10307065


Latar belakang

LATAR BELAKANG

Dalampembangunansuatuproyekkonstruksidibutuhkanperencanaanstruktur yang kuat, aman, dannyaman. Salah satubagianbangunanuntukmendukunghaltersebutadalahfondasi.

Fondasimerupakanbagian yang pentingdalambangunan, karenaitupertimbanganteknisdalammemilihtipe, menentukankedalamandandimensi, kapasitasdukungdanmerancangstrukturnyamerupakanhal yang harusdipelajaridenganbaik.


Tujuan

TUJUAN

TujuandaripenulisantugasakhiriniadalahuntukmerencanakandesainfondasitiangborpadaproyekGedung IKPT Jakarta yang meliputi:

  • Dimensifondasitiang bor.

  • Dayadukungfondasitiang bor.

  • Penurunanfondasitiang bor.

  • Dayadukung lateral fondasitiangbordandefleksiakibatbeban lateral.

  • DimensiPile Cap.


Batasan penulisan

BATASAN PENULISAN

Padapenulisantugasakhirini, penulismembatasipembahasanpada:

  • Perencanaandesainfondasitiangbormenggunakancara manual.

  • Perencanaandesainfondasitiangbormenggunakanbantuan program Plaxis.


Landasan teori

LANDASAN TEORI


Fondasi

FONDASI

Fondasiadalahbagiandarisuatustrukturbangunan yang berfungsiuntukmeneruskanbebandaristrukturatasketanah, baikakibatbebanvertikalmaupunbeban horizontal.


Latar belakang

JenisFondasiSecaraUmum


Fondasi tiang bor

FondasiTiangBor

Hampir di setiapproyekkonstruksifondasitiangmerupakanteknologifondasidalam yang telahjamakdipergunakan. Salah satumetodepemasangantiangfondasiiniadalahdengansistem bor.

Kedalamandan diameter daritiangbordapatdivariasidenganmudah, fondasitiangbordipakaiuntukbebanringanmaupunbebanberatsepertibangunanbertingkattinggidanjembatan.


Latar belakang

ContohPelaksaaanKonstruksiTiangBor


Metode perencanaan

METODE PERENCANAAN

Diagram AlirTugasAkhir


Latar belakang

Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual


Latar belakang

Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual


Latar belakang

Diagram AlirAnalisisDesainFondasiTiangBordengan Program PLAXIS


Hasil pembahasan

HASIL PEMBAHASAN

  • Digunakandimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m.

  • Berdasarkanhasilperhitungandiperolehdayadukungsebesar:


Latar belakang

  • Penurunan yang terjadiberdasarkancara manual:

    Penurunanyang terjadiberdasarkan program PLAXIS:


Latar belakang

Sedangkanuntukpenurunankelompoktiangdiperolehpenurunansebesar 0,0020 m sampai 0,0101 m.

  • Dayadukung lateral tiangadalahsebesar:

    Defleksiyang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m.


Latar belakang

  • Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.


Kesimpulan

KESIMPULAN

  • Berdasarkanhasilperhitungan, diperolehdesaindimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m.

  • Berdasarkanhasilperhitungandiperolehdayadukungfondasitiangborsebesar 65,02 ton sampai 127,82 ton.

  • Berdasarkanhasilperhitungandiperolehpenurunanfondasitiangbortunggalsebesar 0,0234 m sampai 0,0468 m. Sedangkanuntukpenurunankelompoktiangdiperolehpenurunanterbesarsebesar 0,0020 m sampai 0,0101 m.


Latar belakang

  • Berdasarkanhasilperhitungandiperolehdayadukung lateral tiangborsebesar 11,22 ton sampai 17,61 ton. Defleksi yang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m.

  • Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.


Saran

SARAN

Dalammelakukanperencanaanfondasihalpenting yang harusdiperhatikanadalahkarakteristiktanahdimanabangunantersebutakandidirikan. Olehkarenaitumutlakdiadakanpenyelidikantanah (soil investigation) terlebihdahulu. Selainitu, untukperancanganselanjutnyasebaiknyaseismic designikutdiperhitungkan.


Gambar detail

Gambar Detail

  • FondasiTiangBor

  • Detail Pile Cap Type-1

  • Detail Pile Cap Type-2

  • Detail Pile Cap Type-3

  • Detail Pile Cap Type-4

  • Detail Pile Cap Type-5

  • Detail Pile Cap Type-6

  • Detail Pile Cap Type-7

  • Detail Pile Cap Type-8

  • Detail Pile Cap Type-9


  • Login