A_R&D_3 R&D on High Power Couplers for the ILC. Hassen JENHANI (LAL/IN2P3/CNRS). France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007. TTF-III coupler for the XFEL accelerator. TTF-III is also the baseline coupler for the ILC.

merdmann
Download Presentation

France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A_R&D_3 R&D on High Power Couplers for the ILC Hassen JENHANI (LAL/IN2P3/CNRS) France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10th May 2007

  2. TTF-III coupler for the XFEL accelerator TTF-III is also the baseline coupler for the ILC 30 TTF-III couplers were already fully conditioned at LAL (Fully automated conditioning procedure) Warm part Inner conductor Waveguide transition Operating characteristics of TTF-III in the XFEL accelerator: • Frequency: 1,3 GHz • Pulse length: 1,38 ms • Pulse rate: 10 Hz • Instantaneous power: 120kW • Coupling: Qext = 4,6 106 (106 - 107) Cold part Ceramic windows

  3. Power coupler conditioning at room temperature Controls synoptic TTF-III coupler pair during conditioning Well defined conditioning procedure 20µs..400µs (1 MW); 800µs & 1300µs (0.5 MW)

  4. Last conditioning time performances Drastic conditioning time decrease after the conditioning parameters optimization: From 60 h in average to 21 h Average ~ 21 h Parameter optimization Need more tests

  5. Conditioning validation Tests done by DESY Couplers don’t cause any limitation to the cavities. Thanks to W.D Moeller & D. Kostin 35 MV/m

  6. LAL prototypes: TTFV & TW60 Insulation using dielectric ring and insulating screws Capacitor (kapton) TTF-V TW60 Coupler prototype TW60 Coupler prototype TTF-V

  7. Input coupler for STF baseline cavities at KEK TRISTAN Type Coaxial Disk Ceramic ; Warm Windows Cold Windows Warm Parts Cold Parts Coupling Waveguides Doorknobs

  8. KEK high power tests: diagnostics RF Power Meter Pr Pf Pr Pf Vacuum Gauge (Warm side) 5MW Klystron Dummy Load Arc Sensor Arc Sensor 3 Electron Probes 3 Electron Probes Vacuum Gauge (Cold side) Temperature Sensor Monitor Camera Monitor Camera

  9. Processing time Total RF Processing Time up to 1.0 MW, 1.5 msec 1.0 MW, 1.5 ms, 5 Hz ~ 50 hrs. Very Careful Conditioning !!

  10. Coupler & cavity horizontal test • 2006, Nov. : • Assembly of one cavity • Installation of one cavity into a cryomodule 2007: • May : First cool-down test • June: Installation of a warm coupler • July: Second cool-down test • August: disassemble 2008 Jan : • First cool-down of 4 cavities

  11. Collaboration (1) Visit of LAL staff to KEK (December 2006): (H. Jenhani) • Participation to conditioning of the input power coupler for the STF baseline cavity • Visit of the KEK facilities (Conditioning test stand for input couplers, clean rooms, cryogenic facilities…) • Detailed presentation of the preparation and conditioning of Input power couplers at LAL. Many subjects were discussed: • Cleaning procedure • Couplers conditioning procedure • Diagnostics and observed signals • Multipacting • Storage procedure • Discussion about different design aspects of couplers and some of troubles associated to problems of some coupler manufacturing

  12. Collaboration (2) Visit of KEK staff to LAL (February 2007) : (H. Hayano, S. Noguchi & E. Kako) • Presentation of the KEK last results and schedules concerning the input power couplers for the STF baseline cavity. • Discussions about the way to recover the manufacturing problems which were observed at the reception of the LAL couplers prototypes • Visit of the LAL facilities (Conditioning test stand for couplers, clean room & the coupler control and storage room) Both KEK and LAL coupler groups were very satisfied by the this collaboration and approved the maintain of this kind of involvement in all coupler activity aspects Potential collaboration perspective were jointly planned by KEK and LAL teams

  13. Budget spending accounting LAL spending accounts: The total budget received in 2006: 6,000 € Visit to KEK (from 30th November 2006 to 16th December 2006): 4,440 € Visit to KEK (from 7th May 2007 to 14th May 2007): 1,560 € KEK spending accounts: Allocated Budget (for travel): 1,200kyen Visit of three KEK people to Orsay (from Feb 27 to Mar 07,2007): 1,000kyen

  14. KEK and LAL coupler teams collaboration perspectives (1) • Conditioning experience: • Optimization of conditioning parameters and coupler preparation procedure : A new series of TTF-III couplers will start to be conditioned at LAL soon. KEK staff can participate to some of these tests. • Better understanding of coupler behavior by comparison of the LAL and KEK experiments results • Conditioning of the LAL prototypes in the near future. Both of LAL & KEK teams can participate to data analysis and interpretation. • Coupler prototypes: • Exchange of some of design ideas (design simplification & diagnostic integration …) • Technological solutions (materials, gaskets, how to cure defaults caused by some manufacturing problems…)

  15. KEK and LAL coupler teams collaboration perspectives (2) Cryogenics : KEK long experience in the cryogenic field can help LAL coupler group to have better consideration of the cryogenic issues to upgrade coupler prototype designs. Thin layers TiN deposition: • TiN sputtering system for couplers ceramic windows was ordered by LAL (Reception in July 2007) • KEK Know-how of the thin TiN layers deposition and characterization can provide a significant help to this activity

  16. AIL budget application AIL Project 2007: Collaboration teams LAL coupler team: Dr. Alessandro Variola (Leader) Dr. Hassen Jenhani Dr. Pierre Lepercq Eng. Sophie Cavalier Eng. Mickael Lacroix KEK coupler team: Dr. Eiji Kako (Leader) Dr. Hitoshi Hayano Prof. Shuichi Noguchi Budget request for 2007