An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz SiD Collaboration Meeting 16-17 December 2005 Fermilab

  2. 2005.10.11 Discussion • SiD Dimensions from 2005-05 files • Barrel radius=6.450m • Barrel half-length=2.775m • EC Yoke=3.12m thick • EC Yoke ends at 5.895m=2.775+3.120m • Assumed beam height=Barrel radius + 1m • Garage assembly requirements • 3m shielding wall between beamline position & garage • 5m free space between shield wall & rotated barrel yoke • 2m free + 2m assembly fixture+1m free • 4m free space between rotated barrel yoke & rotated barrel HCAL • 2m free + 2m assembly fixture+1m free • 5m free space between rotated barrel yoke & pit wall • 2m free + 2m assembly fixture+1m free

  3. Detector Access Guesstimates • Door support leg overhang= • 3.2m~25% barrel diameter • Door opening= • 3.0m • Free space to walk around door ends= • 1.9m • Reserved radius = • 8.0m (6.45 iron +1.55m services) • Free space between dressed barrel & pit walls= • 2.0m • PACMAN radius= • 3.0m

  4. SiD closed, on beamline, in 20m x 28m 8.105 m

  5. SiD open, on beamline, in 20m x 28m 2.775 m 3.120 m 3.00 m 1.905 m 3.20 m 6.45 m 0.55 m 3.00 m

  6. SiD in 48m x 28m IR, anamorphic scales 3.00 m 5.00 m Barrel Yokerotated 6.45 m 4.00 m HCALrotated 6.45 m 5.00 m

  7. SiD in 48m x 28m IR, x-scale=y-scale

  8. Elevation View • Pit Elevation: 30m ? • 1.000 Barrel-floor • 12.90 Detector diameter • 12.90 Free space above detector • 3.000 Crane bridge and hook

  9. Remaining Issues • Presumably, 5.105m long final doublet support platform from door open position (8.895m) to pit wall (14.00m) which mates well with pacman • Many beamline devices including Crab Cavity within 14m of IP • Is a PACMAN solution viable given transverse size of these devices? • Suggest we minimize 1.9m free space at end when door open as well as 3.2m door support length • 8.1m long PacMan seems very long • 55cm clearance between door radius and pacman seems marginal