Exposition Light Rail Transit Project

Exposition Light Rail Transit Project. Expo Board Presentation Monthly Project Status Update October 2, 2008. PHASE 1. Phase 1 Project Status. Design Baseline Design is approximately 92% complete Venice/Robertson design is approximately 36% complete Construction

may
Download Presentation

Exposition Light Rail Transit Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008

  2. PHASE 1

  3. Phase 1 Project Status Design • Baseline Design is approximately 92% complete • Venice/Robertson design is approximately 36% complete Construction • Construction is approximately 19% complete Construction Packages • Negotiated 12 of the 19 construction packages Third Party Agreements • Executed 5 of the 8 third party agreements

  4. Phase 1 Project Status CPUC Grade Crossing Applications • September 15th: Evidentiary Hearings concluded • September 30th: Opening Briefs filed • October 8th: Reply Briefs due • October 22nd: ALJ Proposed Decision • November 21st:Possible CPUC Commission Decision

  5. Phase 1 Project Status Current Construction Activities • Began excavation at the west end of the trench structure (Seg A) • Began receiving running rail • Completed placing slab for construction of struts for grade separation structure (Seg A) • Continued excavating and installing ductbanks and vaults (Seg B) • Began storm drain chemical grouting at Rancho Cienega Park (Seg C) • Completed forming, rebar and concrete of National Bridge, abutment 2 wing walls (Seg C) • Began mobilization to start La Brea overhead structure CIDH piles (Seg C)

  6. Construction Progress Began Excavation of Trench Structure

  7. Construction Progress Began Receiving Running Rail

  8. Construction Progress 6-Way Ductbank in Segment B

  9. Construction Progress Abutment at National Blvd Bridge

  10. Construction Progress Abutment Wing Wall at National Blvd Bridge

  11. Phase 1 Project Status Project Budget Summary • Construction Budget • 12 of 19 construction packages have been negotiated in an amount • totaling $285 million • Currently within the revised construction budget • Project Budget • All tasks are within the overall project budget • Remaining significant risks to the budget include: • - Contracts yet to be negotiated (including Storage and • Inspection Facility) • Any significant contractor claims • Any significant owner related project delays • Changes to Farmdale crossing and Harvard Pedestrian Tunnel

  12. Phase 1 Project Status Project Schedule Summary • Contractor’s Latest Schedule Update Shows a 20-week Project Delay • Delay in the relocation of DWP overhead power lines at the La Cienega structure is driving most of the delay • Utility relocations have delayed completion of the trench • Authority has asked contractor for a recovery schedule • Areas of Potential Further Delay • Aerial structures at La Brea, La Cienega and Ballona Creek • Any changes to the Farmdale Ave. and/or Harvard Blvd. crossings • LADWP power line relocations • Culver City Aerial Station • Storage and Inspection Facility

  13. Phase 1 Project Status Project Issue Summary • Storage and Inspection Facility • LADOT approval of train movements across Washington Blvd. • Completion of environmental and preliminary engineering • Additional Environmental Studies • Received Finding of No Significant Impacts (FONSI) from FTA on September 23rd for Traction Power Substation Sites 3 and 4 • Environmental study for Farmdale Crossing Alternatives is complete • Environmental study for Categorical Exemption of the S&I Facility is nearing completion, but may have to be modified to an environmental assessment depending on results of the traffic study

  14. Phase 1 Project Status Government/Community Relations • Hosted Project Status Update meeting at Ahmanson Senior Center (Seg A) • Provided project update presentations to: • Operation Hope Reverse Mortgage Workshop (Seg B) • Crenshaw Chamber General Body meeting (Seg B) • Hosted informational tables at: • “7th & Fig” Plaza (Seg A) • Back to School Health and Family Festival (Seg B) • Angel City Classic Football Game Event (Seg A) • Attended regularly scheduled meetings with USC and Expo Park to discuss coordination of events and construction activities • Expo and FFP representatives met with LA Trade Tech staff to discuss construction activities, impacts and mitigation measures and established a bi-monthly coordination meeting between LA Trade Tech and FFP

  15. PHASE 2

  16. Phase 2 Project Status • AA/EIS/Conceptual Engineering • Finalizing DEIS/DEIR chapters and conceptual engineering drawings for submission to FTA within the next couple of weeks Government/Community Relations • Briefed City of Santa Monica City Manager and staff on September 2 concerning project status and follow-up on specific engineering topics • Attended City of LA Bikeway briefing for Cheviot Hills residents on proposed bikeway options within the DEIS/DEIR • Met with FTA staff on September 22 to discuss project status and gave a tour of the alignment alternatives on September 24 • Hosted informational table at California Country Club Homeowners Association Annual Block Party on September 21

  17. Phase 2 Project Status