S78. S67. S56. PC. PM. SEQ. S45. PIC. EE. VAC. CYO. QPS. Summary of sector 45 operational tests. On behalf of all the people Involved in the HWC. PM. PC. SEQ. PIC. S45. EE. VAC. CRY. QPS. Cryo Performance. 120. 100. 80. 60. 40. 20. NOV07. DEC07. JAN08. FEB08.

Download Presentation

Summary of sector 45 operational tests

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Summary of sector 45 operational tests

S78

S67

S56

PC

PM

SEQ

S45

PIC

EE

VAC

CYO

QPS

Summary of sector 45 operational tests

On behalf of all the people

Involved in the HWC

R. Alemany LHCCWG


Cryo performance

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Cryo Performance

120

100

80

60

40

20

NOV07

DEC07

JAN08

FEB08

S45

R. Alemany LHCCWG


Powering test summary

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

PCS: Splice Check (200 A)

PLI3: Circuit Protection at I_INT

S45

PCC: Power Converter Configuration

PIC2: Interlocks Test

PNO: Powering to Nominal

R. Alemany LHCCWG


Powering test summary1

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

(*) Short circuit detected at warm - circuit condemned (to be repaired during warm-up).

S45

R. Alemany LHCCWG


Powering test summary2

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

S45


Powering test summary3

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

S45

24.02.08

13H

24.02.08

25.02.08

24.02.08

14H


Powering test summary4

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

  • PGC Matching Section (13-14.02.08):

IPQ

120 A

S45

R. Alemany LHCCWG


Powering test summary5

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

LL5

S45

R. Alemany LHCCWG


Powering test summary6

PGC Arc (+ MR4&LL5) (19.02.08):

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

  • Test Plan:

  • 2 kA FPA

  • 4 kA FPA

  • Heat Run @ 9kA + squeeze

S45

R. Alemany LHCCWG


Powering test summary7

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

Heat Run with RB, QD, QF @9kA (19.02.08)

RB VS_FAULT

S45

R. Alemany LHCCWG


Powering test summary8

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

MR4 & LL5 Squeeze (19.02.08)

S45

R. Alemany LHCCWG


Powering test summary9

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

  • PGC Summary:

    • RB settings generated from calibration curves obtained from FIDEL model.

    • The rest of the magnets: linear calibration from layout database.

    • Ramp to 5.3 TeV.

    • Optics used: V6.500.

    • PGC of sector 45 done with LSA and timing system for synchronized ramps. Tests driven by:

      • LHC Sequencer: PGC of the Matching Sections (see slide 7).

      • Equip State: PGC of the Arc (see slide 9).

S45

R. Alemany LHCCWG


Powering test summary10

PM

PC

SEQ

PIC

S45

EE

VAC

CRY

QPS

Powering Test Summary

  • Special thanks to:

    • HWC Teams.

    • LHC OP Team.

    • LSA Team.

    • Database Management Team.

    • Sequencer Team.

      Please, forgive me if I forget somebody