Common Methodology Group Work

Common Methodology Group Work. Workstream B (Pricing Modeling EDCM/CDCM) Charging to Offshore Networks under the EDCM 4 March 2010. PRESENTED BY María Isabel Liendo, SPEN, on behalf of Workstream 4. Background.

mauli
Download Presentation

Common Methodology Group Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Common Methodology Group Work Workstream B (Pricing Modeling EDCM/CDCM) Charging to Offshore Networks under the EDCM 4 March 2010 PRESENTED BY María Isabel Liendo, SPEN, on behalf of Workstream 4 energynetworks.org

  2. Background Question raised in relation to charging for embedded transmission networks (OFTOs) (DCMF, 15/01/2010) Offshore transmission networks are defined as lines rated at 132kV and above, so it is possible that they could connect to a DNO, in England and Wales This paper and presentation sets up the DNO’s current thinking energynetworks.org 2

  3. DUoS charging implications Proposal under EDCM: If the User’s connection to the DNO’s network can be classed as an Embedded Network serving identifiable end users, then a portfolio tariff applies Each generator will be modelled separately and a marginal cost determined under FCP or LRIC energynetworks.org 3

  4. Charging considerations Charge (credit) calculated refers to the offshore generator -> it should be passed through by the embedded network to achieve the objectives of the EDCM For OFTOS, the framework allows this: the GBSO’s UoS Charging Methodology establishes that “ETUoS” charges are passed to the generators Note: if more than one generator, “allocation” is currently by TECs. However, under portfolio it can be passed through directly. Change to GBSO’s methodology? For distribution offshore networks, the same rationale and methodology applies. However, no regulation for passing through charges of credits to the generator Information and data flows exchange need to be solved energynetworks.org 4

  5. Possible connection configurations Tidal generator Windfarms Windfarms OFTO OFTO DNO DNO Case 1. Simple generator Case 2. Multiple generators energynetworks.org 5

  6. Tidal generator Tidal generator Windfarms Windfarms OFTO 1 OFTO 1 OFTO 2 OFTO 2 DNO DNO A DNO B Possible connection configurations (2) Case 3. Interconnected offshore networks Case 4. Interconnected offshore networks across DNOs energynetworks.org 6