Muon Detector Status ( week 46 Nov 10-->14)

Muon Detector Status ( week 46 Nov 10-->14). Present: Sandro, Pierre-Yves , Pierluigi, Fabrizio, Matteo, Oleg, Sasha, Burkhard, Ale

marlee
Download Presentation

Muon Detector Status ( week 46 Nov 10-->14)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon Detector Status (week 46 Nov 10-->14) Present: Sandro, Pierre-Yves , Pierluigi, Fabrizio, Matteo, Oleg, Sasha, Burkhard, Ale • Sandro and Pierre-Yves have been working on a procedure to perform an automatic test of the MUON-L0MU optical links – Sandro has been also working on other PVSS-related issues. • Rafael and Davide have understood the problem on the GEM threshold scan. Rafael is working on the ELMB firmware and will provide a solution before he leaves (Wednesday). • Sasha and Ale completed the M1 gas pipes installation. • The HVGEM system is now connected to muhvc02w via a SYSTEC. The first communication tests from PVSS via CANopen OPC Server have been completed successfully (Matteo M., Fabrizio). • Giovanni P. has restarted (after fighting with bugs, corrupetd PVSS installations, non-working shortcuts…) the M2-M5 timing tests A. Cardini / CERN & INFN

  2. Muon Detector Plans (week 47, Nov. 17-->21) Present: Francesco, Oleg, Sasha, Rafael (up to 18th), Burkhard, Ale, Saputi, Anelli, Rossellini, Luca Landi • Participate to the global commissioning week. Should concentrate on DAI issues. We will keep a low profile on this activity as we have many more urgent activities planned. • Work with L0MU to debug the "blind PU problem" on Side-C. We will need "PDM event" on side C during several hours – start today with Q3 (Giovanni P., Renaud) • Measure the optical power for the 15 fibers which failed the 9 db test (Reneaud, Ale) • Continue M2-M5 timing test (Giovanni P., then Francesco D.) • Continue HVGEM work from Cagliari/LNF (Matteo M., Fabrizio) • Continue work on M1 FEB PVSS projects (Davide, Rafael) • Finalize M1 services: arrange cable at cable-chain exit, install a few missing HV cables, complete gas pipes protection, install fire-extinguishers (Sasha, Luca) • Some final HV work (a few cables to be installed, connectorization) on M1 (Anelli, Rossellini) • Complete GAM+MWPC Gasy System Commissioning + pressure test • Sasha is preparing the M1 wall alignment tools A. Cardini / CERN & INFN