PSPI: PEPSI installation preparation, includes all of the pier modifications. LBT Q4 2007 Engineering Review. Highlights (Q4/2007). PEPSI bridge location utilities installed, except power PEPSI bridge location, have installed clean dry air, 47 deg chill water, and fiber optic

Download Presentation

LBT Q4 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Pspi pepsi installation preparation includes all of the pier modifications

PSPI: PEPSI installation preparation, includes all of the pier modifications

LBT Q4 2007 Engineering Review


Highlights q4 2007

Highlights (Q4/2007)

PEPSI bridge location utilities installed, except power

PEPSI bridge location, have installed clean dry air, 47 deg chill water, and fiber optic

Started installation of power

Started on raising height of florescent lights and boxes

Schedule PEPSI team, Frank and Emil visit first of year 2008

Cable chain designs have been tested and failed controlling the fiber motion across the elevation axis

Installed AZ hole support structure


Open issues

Open Issues

Technical

None

Schedule

Part scheduled

Financial

Cost of paint and materials

Resource

Identify paint and paint contractor


Progress q4 2007

Progress (Q4/2007)

Install 47 deg coolant, clean dry air, and fiber to PEPSI bridge location

Working on other modifications to the pier

Fiber run control cable chain being worked on

AZ hole support structure is installed

Gallery brackets are installed


Planning q1 2008

Planning (Q1/2008)

Terminate fibers

Define and install the connection point box

Install power

Move J box in pier up to 4 M, Q3 2007

Move florescence lights in pier up to 4 M, Q3 2007

Installing energy chain/ cable chain

Install services, E-net, E-stop, telephone

Insulate all pipe carrying liquids

Epoxy paint entire floor

Paint walls with epoxy paint