RSU Rigid Secondary Unit. LBT Q4 2007 Engineering Review. Highlights and Progress(Q4/2007). Mirror approaching completion at SESO Hexapod passed lab test and shipped to LBT. Open Issues. M2 mirror still being fabricated, close to completion, barring disaster.

Download Presentation

LBT Q4 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Rsu rigid secondary unit

RSU Rigid Secondary Unit.

LBT Q4 2007 Engineering Review


Highlights and progress q4 2007

Highlights and Progress(Q4/2007)

Mirror approaching completion at SESO

Hexapod passed lab test and shipped to LBT


Open issues

Open Issues

M2 mirror still being fabricated, close to completion, barring disaster.

Have been unable to test hexapod control with high level software as yet.


Lbt q4 2007 engineering review

Planning

  • Schedule

    • Dry run installation of M2 hub in second week of January ‘08.

      Intend to test-fit and test-run hexapod in-situ on the M2 swing arm, Using the alignment telescope we can check that high-level software commands lead to sensible results.

    • If M2 is completed by late January, system could be ready for full install in Q1 ‘08