An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bridge Standards & Practices • Bridge Design & Drafting Manual (BDDM) • Bridge Drawings • Upcoming Bridge Training

  2. Overview: • Links to ODOT Bridge Information • BDDM – Recent Key Updates • Proposing Changes to the Manual • Deviations from BDDM • Bridge Drawings – Start to Finish • Bridge Section Training Updates

  3. ODOT Bridge On-Line Links • Bridge Engineering Home Page • http://www.oregon.gov/ODOT/HWY/BRIDGE • Bridge Design & Drafting Manual (BDDM) • Bridge Standard Drawings • Use “Br. Standards & Manuals” Link • Standard Drawings also via Roadway Engineering Home Page

  4. Bridge Engineering Home Page

  5. Br. Standards & Manuals Page

  6. ODOT Bridge Example Drawings • ftp://ftp.odot.state.or.us/Bridge/BDDM • In the Example_Drawings folder • Also: • Cell_Library • Bridge_Example_Designs • BDDM_Figures

  7. BDDM Nov. 2005 Selected Updates • 1.1.2.2 Scour Analysis • 1.1.7.2(2) Pedestrian Structures – Live Load • 1.1.7.4 LRFD Ductility, Redundancy and Operational Importance Factors • 1.1.7.5 Sidewalk Loading – New section • 1.1.8.4 End Bents – Concrete facing on MSE walls • 1.1.14.2(1) Stay-in-Place Forms • 1.2 Steel – Various updates • 1.2.1.9 Deck Pouring Sequence

  8. To Propose Changes to BDDM: • Go to Introduction, “Revising The Manual”, page INTRO-5 • Follow Step-by-Step procedure • Not needed for bringing routine errors to our attention (typographical, etc.)

  9. BDDM “Deviation” Process • When you want to do something differently than BDDM policy specifies • Send E-mail request to Bridge Standards & Practices Committee stating “what” and “why” • Committee will review and respond

  10. “Deviation” vs. “Exception” • Roadway Engineering Design “Exception” process is a more formal request to use geometry, etc. that doesn’t meet operational standards

  11. Bridge Standards & Practices Committee • Bruce Johnson, State Bridge Engineer • Kevin Davidson, Br. Standards & Practices Engr. • Gary Bowling, Br. Operations Managing Engineer • Craig Shike, Concrete • Hormoz Seradj, Steel • Holly Winston, Seismic & Bridge Rails • Jan Six, Foundations

  12. Create CAD Files & Drawings • Three Types of CAD Files • Layout File • Sub-structure File • Super-structure File Layout File Sub-structure File Super-structure File

  13. Drawings are Reviewed • Engineer of record reviews drawings • Final Corrections have been made to CAD Files.

  14. Mylars are Created • “D” size mylars are printed • All parties have signed mylars. • 11” x 17” paper prints are made of signed mylars.

  15. Plans are sent in • “D” size mylars and 11” x 17” paper copies of signed mylars are sent to office of Pre-Letting in Salem Headquarters. • Office of pre-Letting sends mylars to ODOT Reprographics for printing and scanning.

  16. Contract Documents Created • ODOT Reprographics sends requested material back to Office of Pre-Letting and sends Bridge mylars and scans to Bridge Engineering Section Headquarters, front office. • Bridge front office returns signed mylars to original design office. • Loads scans into the Bridge Data System (BDS).

  17. Project is Constructed

  18. As-Constructed Drawings • Project Manager submits as-constructed comments to design office. • Engineer of record reviews comments • Drafter places as-constructed comments on mylar by hand.

  19. Distribution of As-Constructed Drawings • A set of drawings with as-constructed comments are created and distributed to: Bridge Operations Engineer Region Bridge Inspector • Original red line as-constructed drawings are sent back to Project Managers office.

  20. At Completion of Project At completion of a project, what information is needed by Bridge Engineering Section Headquarters in Salem. • Electronic CAD files in Microstation Version 8 format. • “D” size signed mylars • Calculation books • Project Files • Load Rating of as-constructed bridge per Load Rating Guidelines • Cost Data

  21. Bridge Mylar Flowchart

  22. Upcoming ODOT Bridge Section Training • Beginning Seismic Design: March, April, June & July, One day a month for 8 hours each month, total of 32 hrs. • High Performance Steel and Accelerated Bridge Construction: March 15 & 16 • What’s New in Bridge Design: May 17 & 18th • LRFD Foundation design: Tentative April or May 2006

  23. Questions?