1 / 6

H igh Energy H igh Intensity H adron Beams

The CARE-HHH network aims to coordinate and integrate the activities of the accelerator and particle physics communities worldwide towards achieving superior High-Energy High-Intensity Hadron Beam facilities for Europe. The network includes advancements in accelerator magnet technologies, novel methods for accelerator beam instrumentation, and accelerator physics and synchrotron design. Participating institutes include CEA, CERN, CSIC-CIEMAT, and more.

lscheller
Download Presentation

H igh Energy H igh Intensity H adron Beams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network coordinated by F. Zimmermann and W. Scandale High EnergyHigh IntensityHadron Beams http://care-hhh.web.cern.ch/care-hhh/ CARE-HHH – Mid-Term Review April 2007

  2. CARE-HHH network Coordinate and integrate the activities of the accelerator and particle physics communities in a worldwide context, towards achieving superior High-Energy High-Intensity Hadron Beam facilities for Europe • road map for the upgrade of the European accelerator infrastructure (LHC and GSI accelerator complex) • coordinate activities and foster future collaborations • dissemination and outreach WP1: Advancements in Accelerator Magnet Technologies (AMT) WP2: Novel Methods for Accelerator Beam Instrumentation (ABI) WP3: Accelerator Physics and synchrotron Design (APD) Participating institutes: CEA, CERN, CSIC-CIEMAT, CCLRC, DESY, GSI, INFN, PSI, TEU, WUT Associated institutes: CRPP, ENEA, TUBE, ESRF, UPSA, FZK, TEMF, US-LARP (BNL,FNAL,LBNL,SLAC), JINR, IHEP, KEK Additional collaborations: Texas A&M U., U. Geneva, U. Bologna CARE-HHH – Mid-Term Review April 2007

  3. Activities in 2004/07 • Events: • 24 workshops + 2 CARE-HHH GSI-CERN meetings + 4 HHH-US-LARP coordination meetings • Dissemination and outreach: • numerous presentations at workshops & conferences • 56 HHH publications, almost all workshop proceedings • HHH web sites maintained & developed • Exchanges and education: • 3 US accelerator physicists supported for HHH workshops • 5 Russian accelerator physicists supported by HHH in short-term visits to western labs • 1 EU junior scientist • 2 EU summer students, 1 master student, 5 doctoral students • 1 US-LARP Toohig fellow CARE-HHH – Mid-Term Review April 2007

  4. HHH networking results SPS crystal collimation test Parameters For the LHC upgrade energy deposition in triplet CARE-HHH – Mid-Term Review April 2007

  5. HHH networking results Materials Project LHC Quadrupole LHC Dipole NED ITER Strand Strand Strand Strand Cable Cable Cable Cable s.c. cable & magnet db e- Cloud Clearing electrodes ~50% complete, http://sdb.web.cern.ch/sdb 2 milestone meetings 2 reports CARE-HHH – Mid-Term Review April 2007

  6. Stones (MS) and Intermediate Deliverables (ID). deliverables & milestones compared with original plan 2004: HHH & HHH-APD web site => OK 2005: creation of first web-based beam dynamics code repository => OK http://oraweb.cern.ch:9000/pls/hhh/code_website.startup 2006: web based database for s.c. cables and magnets => OK, 40% complete http://sdb.web.cern.ch/sdb milestones: web reference for IR optics => OK http://care-hhh.web.cern.ch/care-hhh/SuperLHC_IRoptics/IRoptics.html booster synchrotron optics => delayed to 2007 structured list of intensity limits => nearing completion scaling laws for magnet and cryogenic cost => 2007 CARE-HHH – Mid-Term Review April 2007 The workshop on Coil Manufacturing Optimization was postponed to

More Related