Cloud Auto-Scaling with Deadline and Budget Constraints

Ming Mao, Jie Li, Marty Humphrey eScience Group CS Department, University of Virginia Grid 2010 – Oct 27, 2010. Cloud Auto-Scaling with Deadline and Budget Constraints. Cloud Computing. A fast growing computing platform

louise
Download Presentation

Cloud Auto-Scaling with Deadline and Budget Constraints

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ming Mao, Jie Li, Marty Humphrey eScience Group CS Department, University of Virginia Grid 2010 – Oct 27, 2010 Cloud Auto-Scaling with Deadline and Budget Constraints

  2. Cloud Computing • A fast growing computing platform • IDC - Cloud spending increases 27.4% a year to $56 billion (compared 5% a year of traditional IT) • $16.5 billion (2009) -> $55.5 billion (2014) src: Worldwide and Regional Public IT Cloud Service 2010-2014 Forecast • Two most quoted benefits • Scalable computing and storage • Reduced cost • Concerns • Security, availability, cost management, integration interoperability, etc.

  3. Cost • Q1. Cost – the most important factor in practice? • Q2. Moving into Cloud == Reduced Cost ?

  4. Current Auto-Scaling Mechanisms • Resource utilization information based triggers (e.g. AWS auto-scaling, RightScale, enStratus, Scalr, etc)

  5. Where does the gap exist? • Multiple instance types • Current billing models • Full hour billing • Non-ignorable instance acquisition time • 7-15 min in Windows Azure • More specific performance goals • Budget awareness (e.g. dollars/month, dollars/job)

  6. Problem Statement • Deadline (Job finish time) • Cost Problem Statement – how to enable cloud applications to finish all the submitted jobs before user specified deadline with as little money as possible using auto-scaling.

  7. Cloud Application Performance Model • Workload are non-dependent jobs submitted in the job queue • FCFS manner and fairly distributed • Different classes of jobs • Same performance goal (e.g.1 hour deadline) • VM instances take time to startup

  8. Problem Formalization (1) Key variables used in the model

  9. Problem Formalization (2) • Workload • Computing Power of Instance Running Instance Pending Instance

  10. Problem Formalization (3) • Scale up • Sufficient budget • Insufficient budget • Scale down

  11. An example Workload Required Computing Power where

  12. Windows Azure Implementation

  13. Evaluation - Simulation Workload & VM simulation parameters

  14. Stable workload & changing deadline

  15. Changing workload & fixed deadline

  16. Cost

  17. Evaluation - MODIS • MODIS 200X – Year Terra & Aqua – Satellite (X - Y) – Day X to day Y 15 images / day Moderate scale test (up to 20 instances) Large Scale test (up to 90 instances) * C.H. – computing hour 1C.H. = 0.12$ in Windows Azure

  18. Evaluation - MODIS • Test: Terra & Aqua 2006(1-75) - total 1125 jobs 6min early theoretical cost - 93 C.H. or 11.16$ actual cost - 132 C.H. or 15.84$

  19. Conclusions & Future works • Conclusions • More cost-efficient than fixed-size instance choice • VM startup delay can affect hugely in practice • Future works • More general cloud application model • Multiple job classes • Consider other instance types (e.g. spot instances & reserved instances) • Data transfer performance and storage cost