1 / 2

Safety Project Request received by TDOT

Road Safety Audit Review Flow Chart: Development Phase. Safety Project Request received by TDOT. Safety Project Request sent to RSAR Coordinator. Safety Planning Office analyzes latest 3 years of crash data for eligibility. Must meet either of the following criteria:

loring
Download Presentation

Safety Project Request received by TDOT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Road Safety Audit Review Flow Chart: Development Phase Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office analyzes latest 3 years of crash data for eligibility. Must meet either of the following criteria: 1) HESP (Actual Rate/Critical Rate ≥ 3.50); or 2) HRRR (Rural collector/local road and Injury Rate > Statewide Average Injury Rate and/or Fatal Rate > Statewide Average Fatal Rate). Analysis indicates site does meet criteria for RSAR Analysis indicates site does not meet criteria for RSAR Safety Planning Office completes Letter of Findings for internal distribution Short Range Planning Office creates PIN # Safety Planning Office retrieves additional data necessary to perform RSAR (TRIMS, ADAM, etc) RSAR Coordinator distributes data to RSAR Team for review RSAR Coordinator schedules Pre-Briefing (priority given to Regional Traffic Engineer’s schedule) RSAR Team conducts Pre-Briefing (data is discussed and Onsite Meeting is scheduled) RSAR Team conducts Onsite Meeting Report Writer (Short Range Planning) completes Draft RSAR Report in PDF file format RSAR Coordinator distributes Draft RSAR Report to RSAR Team and schedules Post Meeting (priority given to Regional Traffic Engineer’s schedule) RSAR Team conducts Post Meeting (Draft RSAR Report is discussed) Report Writer (Short Range Planning Office) makes changes (if necessary) and finalizes RSAR Report in PDF file format RSAR Coordinator, Conceptual Planning Office, and Short Range Planning Office review RSAR Report RSAR Report approved RSAR Report not approved Project Planning Director reviews RSAR Report RSAR Report approved RSAR Report not approved Chief Engineer reviews RSAR Report RSAR Report not approved RSAR Report approved RSAR Coordinator distributes RSAR Report to Chief Engineer, Chief of Environment and Planning, Dept of Safety, Regional Director, Project Programming Director, State Traffic Engineer, Regional Traffic Engineer, Safety Program Manager, FHWA, and RSAR Team Safety Program Manager Consider additional improvements to site or RSAR process Revised: 2/13/2008

  2. Road Safety Audit Review Flow Chart: Implementation Phase Safety Program Manager Notify Project Manager Safety Program Manager requests Environmental Document Local Programming Environmental Permits Office provides required documentation (most will be “Categorical Exclusion”) Send Contract to Locals Send copy of Approved Contract to Traffic Engineering Office Safety Program Manager submits Request for Approval of Project Funding to Project Programming FHWA provides approval for Project Funding Safety Program Manager provides Notice to Proceed Guidance Implementation Maintenance Division Bid Contract Regional Director assigns project State Traffic Engineer coordinates work for Bid Contract Regional Traffic Engineer On-call Consultant develops Plans Regional & District Maintenance Supervisors State Construction Engineer lets to contract Maintenance Workforce Regional Construction & Traffic Engineer provide contract administration Contractor Regional Traffic Engineer writes and distributes Project Completion Report to Chief Engineer, Project Planning Director, Project Management Director, Project Programming Director, State Traffic Engineer, Safety Program Manager, and FHWA One year after Guidance Implementation Safety Planning Office analyzes latest 3 years of crash data Consider additional improvements to site or RSAR process Analysis indicates crash rates have improved and site no longer meets criteria for RSAR RSAR is concluded Revised: 2/13/2008

More Related