1 / 6

Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction

Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction. Agenda of this meeting Tracker Layout and Module concepts Overall planning Collaboration between design teams, meetings. Agenda. Tracker layout and module concepts. Barrel + Endcap. Long Barrel. 2S modules. PS modules.

liza
Download Presentation

Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upgrade Phase 2 Mechanics meeting, 21 March 2013Introduction • Agenda of this meeting • Tracker Layout and Module concepts • Overall planning • Collaboration between design teams, meetings Antti Onnela, CERN

  2. Agenda Antti Onnela, CERN

  3. Tracker layout and module concepts Barrel + Endcap Long Barrel 2S modules PSmodules 2S, 2-Strip modules R > 600 mm VPS, Pixel-Strip modules with Vertical interconnections R > 200 mm PS, Pixel-Strip modules R > 200 mm Antti Onnela, CERN

  4. Overall planning First major milestone: TP in autumn 2014 Describe a mechanics concept (consistent with the proposed detector layout!), with detector modules, support and cooling structures, services arrangements. Also initial plans on how the detector can be constructed, assembled, tested and commissioned. , cooling Conceptual design, studies on materials, technologies D. Abbaneo Antti Onnela, CERN

  5. Collaboration between design teams, meetings Until the upgrade project has chosen between the proposed, different Tracker layout concepts, the mechanics design work needs to continue on all of them. Mechanics design teams should collaborate to: • Identify and share common topics (e.g. choice of adhesives, cooling pipe material and connection techniques) • Allow for cross-checks between designs • Avoid duplication of work • Avoid leaving topics completely or poorly covered. Collaboration between the design teams: • Use Web-accessible data storages Common ones: https://espace.cern.ch/Tracker-Upgrade/SitePages/Home.aspx and EDMS (both need a brush-up!) + Storages maintained by each design team • Hold Phase 2 Mechanics meetings every ~2 months. See next slide for 2013 CMS calendar. • Hold a Review on the Phase 2 Mechanics in summer-autumn 2013. • And of course email and phone. Antti Onnela, CERN

  6. N.B. During CMS Weeks difficult to find time for Upgrade meetings ? Mechanics Review? ? ? ? ? Antti Onnela, CERN

More Related