1 / 3

Group Responsibilities

Aero 426, Fall 2013 Phase III Technical Specialty Groups Program Manager: Jesus Orozco, Assistant Program Manager: Jeff Campbell. Group Responsibilities. Observation Candidates and Performance Evaluation Group

lindley
Download Presentation

Group Responsibilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aero 426, Fall 2013Phase III Technical Specialty GroupsProgram Manager: Jesus Orozco, Assistant Program Manager: Jeff Campbell

  2. Group Responsibilities • Observation Candidates and Performance Evaluation Group • Survey known occultations for the next two years and determine launch and orbit timing to intercept some of them. See:http://www.asteroidoccultation.com • http://www.asteroidoccultation.com/2014-Best-Events.htm • Compute SNR as the design firms up and produce illustrative graphics of an example occultation • Light Gathering Optics Design Group • Design of entire optic: Primary, deployable secondary truss, detectors • Formation Design Group • Work out deployment process using Euler-Hill dynamics. • Sketch requirements on carrier vehicle, & on P-Pod dispensers; propulsion req’mts • Produce illustrative graphic • GNC and Communications Group • Design attitude control system: sensors, actuators, star tracking and pointing, comm system trades, architecture and final design • Propulsion Group • System req’mts, for orbit insertion and maintenance, system design • Power and Thermal group • Power req’mts & power system design, thermal requirements and thermal control • Structures Group • CubeSat structure, packaging, 2nd-ary deployer, CAD drawings

  3. Immediate Tasks • Elect a Technical Group Leader (TGL) for your group • PM, APM, and DCH will be responsible for the project time-line, for assembling and finalizing cost data from the groups, and for reviewing the Final Presentation, and organizing the event • Complete the Team Mate Evaluation form (on the website) for the people in your PDR team.

More Related