MICE Coupling Coil Cryostat Update

Allan DeMello Lawrence Berkeley National Laboratory. MICE Coupling Coil Cryostat Update. MICE CM37 at RAL, UK November 6, 2013. Status of Coupling Coil Cryostat. Cryostat Vacuum Vessel LBNL mechanical shop is fabricating the first cryostat vacuum vessel

liluye
Download Presentation

MICE Coupling Coil Cryostat Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Allan DeMello Lawrence Berkeley National Laboratory MICE Coupling Coil Cryostat Update MICE CM37 at RAL, UK November 6, 2013

  2. Status of Coupling Coil Cryostat • Cryostat Vacuum Vessel • LBNL mechanical shop is fabricating the first cryostat vacuum vessel • Scheduled to finish the 2ndweek of December • Thermal Shield • Drawings have been finished at LBNL and need to be reviewed by the LBNL superconductor group • LBNL mechanical shops will fabricate the first thermal shield • Cooling Circuit • Drawings will be generated by LBNL • LBNL mechanical shops will fabricate the cooling circuit parts • LBNL will assemble components into sub-assemblies

  3. Coupling Coil Coupling coil magnet integrated into the RFCC RFCC Module

  4. Coupling Coil Sub-assemblies

  5. LBNL mechanical shop is in the process of fabricating the first cryostat vacuum vessel • Estimated completion early December 2013 • Drawings will be updated to reflect the “as built” cryostat Coupling Coil Cryostat Vacuum Vessel

  6. Remaining Tasks • Thermal shield design is nearly complete • SINAP drawings are finished and will be reviewed by the LBNL superconductor group • LBNL shops will fabricate the first thermal shield Coupling Coil Thermal Shield

  7. Cooling Circuit Assembly • Remaining Tasks • LBNL superconductor group will finalize the cooling circuit design • Create detail fabrication drawings • Fabrication of component parts at LBNL • Assemble components into sub-assemblies for shipment to Fermilab