Linac 4 Diagnostics

Linac 4 Diagnostics. L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical responsibility). General Remarks. We divide the diagnostics in two main categories: commissioning and day-to-day operation.

liang
Download Presentation

Linac 4 Diagnostics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical responsibility)

  2. General Remarks We divide the diagnostics in two main categories: commissioning and day-to-day operation. The first will be used to find the right settings of the machine and to study the beam quality and machine performance. The second will be used to survey the machine and for fine tuning.

  3. Commissioning source/LEBT: intensity: retractable Faraday cup and beam current transformer. emittance: scanning slit device with SEM grid (also steering, quantify sc compensation and commission pre-chopper; time resolution required) measurement in stages: source, first solenoid, RFQ input plane energy spread: temporary set-up with slit, spectrometer and SEM grid; read-out of SEM time resolved; additional FC at exit of spectrometer line. RFQ and chopper line: IPHI diagnostic line (TOF energy measurement, dipole, wire scanners, pick-ups). chopper line: two beam current transformers and BSHM

  4. Commissioning DTL tank 1, 2, 3: movable diagnostics bench (MB): transmission, transverse and longitudinal emittance, energy and energy spread, set rf phase and voltage. moving slit device (transv. emittance) energy degrader (set phase) Faraday cup time-of-flight energy measurement bunch length measurement (Feschenko monitor) CCDTL, SCL: setting-up using the permanently installed diagnostics full commissioning (only at high energy): transport the beam to a permanently installed measurement line at the exit of the linac (depending on installation schedule) energy: spectrometer dipole in the ML and time-of-flight (phase pu) in the linac bunch length measurement (Feschenko monitor)

  5. Operation source/LEBT/RFQ/chopper line: intensity: retractable Faraday cup and beam current transformer. profile: SEM grid. RFQ and chopper line: intensity: two beam current transformers permanently installed upstream and downstream of the chopper. position/phase/intensity: 3 pick-ups

  6. Operation DTL, CCDTL, SCL: position/phase/intensity: after each tank of the DTL, after each of the 8 modules of the CCDTL and after each of the 4 modules of the SCL. combined position and phase pu, which measures also the beam current within 5%. beam loss (interlock!): BLMs along the linac and transfer line. beam current: in addition “real” beam current transformers after DTL, CCDTL, SCL and in the transfer line (HEBT). beam profile (SEM grids): after tank 3 of the DTL, after modules 4 and 8 of the CCDTL and after modules 2 and 4 of the SCL.

  7. Exit of Linac and Transfer Line exit of linac: measurement line for transverse and longitudinal emittance and energy, transformer transfer line: position/phase/intensity: pick-ups, transformers and beam loss monitors.

  8. Diagnostics Overview

  9. Diagnostics Overview DTL SEM Grid Beam Current Transformer Beam Loss Monitor Position, Intensity and Phase pick-up BLM BLM BLM DTL tank1 DTL tank2 DTL tank3

  10. Diagnostics Overview CCDTL 1-4 CCDTL module2 CCDTL module1 BLM BLM CCDTL module3 CCDTL module4

  11. Diagnostics Overview CCDTL 2-8 CCDTL module6 CCDTL module5 BLM BLM CCDTL module7 CCDTL module8

  12. Diagnostics Overview SCL SCL module2 SCL module1 BLM SCL module4 SCL module3 BLM

  13. Technical Specifications Need input from AB/BI - Beam current transformer - SEM Grid - Bunch Length Monitor - Time of Flight - Spectrometer dipole - Phase, position and current pick-up - Beam Loss Monitor