WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes. Progress Report – preliminary version PSC06 Meeting. Gabriel Neagu WP2 Leader National Institute for R&D in Informatics – ICI, Bucharest gneagu@ici.ro, www.ici.ro.

lenka
Download Presentation

WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes Progress Report – preliminary version PSC06 Meeting Gabriel Neagu WP2 Leader National Institute for R&D in Informatics – ICI, Bucharest gneagu@ici.ro, www.ici.ro The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775

  2. NGI Sustainability indicators for the 2-nd project year • General remarks on the Progress report content: • It is focused on received contribution per country on NGI indicators • Partners not being able to provide their contributions before are invited to report during the meeting • Should be considered as un updated version of the report for the PSC05 meeting • Additional information reported for September – November period is presented in Italics for both achieved results and updates to the 2nd project year plan • This cumulative document is intended as the main input for the second version of D2.3 deliverable • Statistics are presented at the end on the addressed NGI Indicators from both planning and achieved results perspectives • The Further Work section of the report includes WP2 open positions in the AP Register SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 2

  3. NGI Sustainability indicators for the 2-nd project year • NGI setup and recognition • NGI organization and Consortium expansion • NREN cooperation • eInfrastructure national strategy • National Policy documents • eIRG plans • National-level projects • Other sources of funding in grid area including related projects • Industrial cooperation • Technical independence i.e. national-level services • Expansion of national infrastructure • Sites migrated to EGEE production • Expansion to new applications and user communities SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 3

  4. Albania • Plan for the 2-nd project year • NGI setup and recognition • The launch of NGI is planned for September 2007 • National-level projects • Several proposals would be submitted to Ministry of Education and Science, regarding both Grid infrastructure and applications • Other sources of funding in grid area including related projects • The support is expected from bilateral and regional (SEE-ERA.NET) projects • Expansion of national infrastructure • Extension of existing sites (INIMA, FIE, FNS), and inclusion of new sites (FECO and universities of Elbasani and Shkodra) • Expansion to new applications and user communities • Expansion into new domains, such as meteorology and seismology SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 4

  5. Albania • Report on May-November 2007: • NGI setup: • JRU signed between rectors of University of Tirana and Polytechnic University of Tirana • Plans to launch it in September delayed • Reorganization of INIMA • Plans for next PSC meeting in Sarajevo • Pre-election situation in universities • National projects • One joint project-proposal was presented to Ministry in framework of national programme for R&D in IT, focused on • Infrastructure improvement • Evaluation of future applications • Organization of local events SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 5

  6. Albania • Other sources of funding • Proposal to SEE-ERA was not accepted due to unclear causes • Expansion of national infrastructure • New site in implementation at Faculty of Economy (FECO) • Work in progress for improvement of the site at FIE • Work in progress for implementation of the site at FNS • New site deployed already at INIMA, but • Sites of INIMA shut down for undetermined period due to moving out of the building. • Expansion to new applications and user communities • Contacts with FECO and institutes of Seismology and Hydrometeorology established, all included in the national project-proposal SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 6

  7. Bosnia-Herzegovina • Plan for the 2-nd project year • NGI setup and recognition • Improve the NGI organization and attempt the National level recognition. This could include recognition at various levels i.e. Ministries of Science / Technology / Education where applicable: state/entity/canton • NGI organization and Consortium expansion • Planned inclusion of 3-5 new members • NREN cooperation • NREN National recognition will be attempted • eInfrastructure national strategy • If political issues allow • National-level policies • If political issues allow • eIRG membership status • If political issues allow SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 7

  8. Bosnia-Herzegovina • Plan for the 2-nd project year (cont.): • National-level projects • One long-term project is in preparation • Other sources of funding in grid area including related projects • By SARNET and by individual universities. • Technical independence i.e. national-level services • National CA is planned • RB, BDII servers (or gLite counterparts) • Expansion of national infrastructure • All sites are due for upgrade, 2 new sites will be introduced • Expansion to new applications and user communities • Attempt the expansion into new domains: electromagnetics, fluid dynamics, seismology, meteorology, biomed SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 8

  9. Bosnia-Herzegovina • Report on May-November 2007: SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 9

  10. Bulgaria • Plan for the 2-nd project year: • NGI organization and Consortium expansion • BGGC expects new members • eInfrastructure national strategy • eInfrastructure national strategy will be recognized on governmental level • eIRG plans • contribution to eIRG workshops, participation at eIRG meetings regularly • National-level projects • National-level projects are expected for expansion of infrastructure • Other sources of funding in grid area including related projects • New bilateral and regional projects are expected to start • Technical independence i.e. national-level services • Full technical independence in the production status will be achieved • Expansion of national infrastructure • A total of more than 300 CPUs is expected to be achieved SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 10

  11. Bulgaria • Report on May-November 2007: • NGI organization and Consortium expansion • Agreement was signed with University of Ruse • Interest was declared by one additional organization • National-level projects • One big national project and two small projects were activated; it will support configuration up-grades • Expansion to new user communities • New members in SEE-GRID VO from computational mechanics and geographic • eIRG plans • Participation in the Open Workshop on eInfrastructure, Lisbon, Portugal, October 11-12, 2007 • Participation in 12th e-IRG meeting, November 30, 2007, Lisbon, Portugal (coming) SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 11

  12. Croatia • Plan for the 2-nd project year: • NGI organization • Establishment of CRO GRID 2 National Grid Infrastructure (CRO NGI) and Croatian [Hrvatska] National Grid Initiative (HNGI) • More formal internal organisation and decision-making mechanisms establisheds (Steering Commitee) • eInfrastructure national strategy • e-Croatia (e-Hrvatska) strategy • National-level projects • CRO GRID 2 • Other sources of funding in grid area including related projects • EGEE-II, • SEE-GRID-2, • EU funded CenVis (Centre for Scientific Visualisation) • DARIAH • bi-lateral and multi-lateral projects SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 12

  13. Croatia • Plan for the 2-nd project year (cont): • Industrial cooperation • Ericsson Nikola Tesla, CRO GRID related contracted relationship; IBM Hrvatska; interested industrial and other entities • Technical independence i.e. national-level services • Improved Grid services at the national level • Implementation of organisational mechanisms and production infrastructure maintenance procedures • Functionality and performance expansion and optimisation: • Expansion of national infrastructure • The infrastructure will be expanded as the needs arise. • Plans are being made to establish CRO GRID National Grid Infrastructure in a similar way as by CARnet (no formal document, but strict rules). SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 13

  14. Croatia • Report on May-November 2007: • NGI organization • Establishment of Steering Committee for CRO NGI • The Regulation act of CRO NGI and the Budget for the Croatian eInfrastructure was adopted on the first meeting of the official CRO NGI board • Establishment of National Committee for NGI at Croatian Academy of Sciences and Arts SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 14

  15. FYR of Macedonia • Plan for the 2-nd project year: • NGI organization and Consortium expansion, NREN cooperation • Inclusion of new member (SEE University, Tetovo) • eInfrastructure national strategy • National strategy for Electronic Communication with ICT, Ministry of Transport and Communications • Meeting with newly appointed Minister of Information Society • The National Grid Strategy document will be presented to the ‘SS Cyril and Methodius' University Council for approval. • Depending of interest and inclusion of other Universities in NGI (from Tetovo, Bitola) this document will be proposed for adoption to the Inter University Council. • National recognition of MARGI. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 15

  16. FYR of Macedonia • Plan for the 2-nd project year (cont): • Other sources of funding in grid area including related projects • SEE-ERA.NET call • UNESCO initiative for new project: Improving Innovation Capacities in the Universities • Technical independence i.e. national-level services • CA accreditation planed to run in Jul/August 2007, CP/CPS document to be finished in March 2007; VOMS; RGMA; BDII. • Expansion of national infrastructure • Inclusion of new site (Tetovo) • Expansion to new applications and user communities • Large Scale Computations in Molecular Chemical Physics of Interacting Systems • Grid Enabled System for Mining, Gathering, Clustering and Retrieval Images from the Web • Mass Processing of Digital and Analog Seismological signals SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 16

  17. FYR of Macedonia • Report on May-August 2007: • NGI national-level recognition – In progress • Briefings with Minister of Information society of R. Macedonia, result UKIM/MARNet is recognized as the main coordinator of the Grid Initiative in Macedonia • JRU documents prepared as continuation of the previously signed MoA (2004-2006) • eInfrastructure national strategy • On the request of the Minister of ICT • Proposition of the MARNet budget 2008 year • Talks for possibilities of expansion of the backbone to all public universities (Bitola, Tetovo, new univ. Shtip) • NGI expansion. other sources of funding in grid area including related project • Preparation and dissemination activities (Linux installations) for the preparation of the new grid site at South East Europe University SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 17

  18. FYR of Macedonia • Report on May-November 2007 (cont): • Industrial cooperation • Briefings with MB of MASIT Chamber of Commerce (result -presence of its president on Industrial day in Thessaloniki • Disemination event for policy makers at 5th SEEITA Conference and 4th MASIT Open Days under the track: Attracting FDI in Macedonia and SEE Region. Present were high Government officials, Minister for foreign investment, Minister for Information Society, Director of Agency for Foreign Investments, representatives of companies, USAID, GTZ • Expansion of national infrastructure • Expansion of the MK1 cluster by 20 CPU-a Virtual machines, 1CPU on 3GHz and 512 MB RAM • Expansion to new applications and user communities • Grid enabled system for mining, gathering, clustering and retrieval images from the web • Grid-based medical platform - analysis and enhancement of the algorithms for filtering of mammograms and segmentation). SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 18

  19. FYR of Macedonia • Report on May-November 2007(cont): • Technical independence i.e. national-level services • Preparing Linux machine and installation of CA software • Participation in EUGRIDPMA meeting • CPS finalized, site prepared, CA software, hardware and site installed and configured • Started the accreditation procedure scheduled for January 2008 Amsterdam meeting of EUGRID PMA. • Participation in EUGRIDPMA meeting ---------- • Doctorial virtual Studies • preparatory meeting and 1 month common work of Anastas Mishev with IPP BAS • 1 month common work of Azir Aliu from SEE University with IPP BAS SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 19

  20. FYR of Macedonia • Up-dated plan for the remaining period: • NGI national-level recognition – • Adoption of the MARGI - Use Policy documents by MARNet Management Board. Preparing document for submission to the Inter University Council • National-level projects • Preparation s for national Call • Other sources of funding in grid area including related projects • Contributions to current FP7 projects preparations (SEE-GRID-SCI) • Technical independence i.e. national-level services • Activate the national CA • Improve the current level of deployment of national-level services • Expansion of national infrastructure • Up-grade current sites, activate SEEU site SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 20

  21. Greece • Plan for the 2-nd project year: • National-level projects • Expansion of the HellasGrid infrastructure • Other sources of funding in grid area including related projects • Participation in various Grid Related project proposals • Industrial cooperation • Increase contacts with industrial partners • Expansion of national infrastructure • Yes, via national project • Expansion to new applications and user communities • On going effort via dissemination and participation to related projects SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 21

  22. Greece • Report on May-November 2007: SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 22

  23. Hungary • Plan for the 2-nd project year: • Other sources of funding in grid area including related projects • Participation in various Grid Related project proposals • Industrial cooperation • Increase contacts with industrial partners • Expansion of national infrastructure • Further increase of HunGrid resources • Expansion to new applications and user communities • Expand to new user communities in areas of data mining, drug discovery, bioinformatics, climate modeling, B2B, geophysics, network modeling, etc SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 23

  24. Hungary • Report on May-November 2007: • NGI organization and Consortium expansion • Additional JRU established with 3 members in total: DEPARTMENT OF METEOROLOGY at ELU and SEISMOLOGICAL OBSERVATORY of GGRI • The current JRU has been formed by two smaller application developer/user teams and one team that deals with grid development, operation, support, and training. This 'satellite' JRU will exploit the nationwide Grid resources (operated by the another HGCC JRU) together with other international resources for a specific purpose, namely for applications in the field of seismology and meteorology. • the Hungarian Grid Competence Center (HGCC), involving the key and most experienced Grid players from Hungary, has launched the National Grid Initiative and intends to become the national reference point. • HGCC establish another JRU. • SZTAKI is member in both JRUs • The management of two separated JRUs with different objectives (instead of one heterogeneous JRU) and with different leaders seems to be more feasible. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 24

  25. Hungary • eIRG plans • Already eIRG member • National-level projects • Same number of projects as before, working on the projects. • Software and Services - National Technology Platform project initiated and submitted (19. 11. 2007): • Hungarian Grid community (HGCC) supports and participate in the Grid related part of the project (tight connection to NESSI - Networked European Software and Services Initiative) • Other sources of funding in Grid area including related projects • SEE-GRID-SCI • Industrial cooperation • Industrial collaboration was initiated with Oracle Hungary, first negotiation was done beginning of May as an outcome of the HU-Hungarian Grid Induction and Application Development Training • Second negotiation was done at EGEE’07 in Budapest with Oracle EMEA SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 25

  26. Hungary • Up-dated plan for the remaining period: • NGI organization and Consortium expansion • HGCC and HunGrid will be expanded with the participation of new members. • National-level projects • expected expansion of infrastructure with the new submitted projects. • + Software and Services National Technology Platform project (SSNTP) • + Biotech National Technology Platform project (BNTP) • Other sources of funding in Grid area including related projects • Contributions to current FP7 projects preparations (EGEE III, SEE-GRID-SCI, National Technology Platform project). • Industrial cooperation • Meetings will be organized to strengthen the industrial and governmental collaboration of HunGrid. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 26

  27. Hungary • Up-dated plan for the remaining period (cont): • Expansion of national infrastructure • more storage + CPU • Expansion to new applications and user communities • Supporting different research fields such as: Biotech/Bioinformatics and looking for multidisciplinary applications in the frame of Biotech National Technology Platform project. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 27

  28. Moldova • Plan for the 2-nd project year: • NGI setup and recognition • MD Grid NGI establishment in May 2007 • NGI organization and Consortium expansion, NREN cooperation • Inclusion of State University of Moldova, Institute of Ecology and Geography, Faculty of Economical Cybernetics of AESM and the Institute of Applied Physics of the ASM. • eInfrastructure national strategy • New strategy to be accepted in collaboration with MD Grid NGI • eIRG plans • Application for Moldova membership to be prepared and sent. • National-level projects • Adopting by Moldovan government of the Concept of National Information System for Science and Innovation will include grid-related topics. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 28

  29. Moldova • Plan for the 2-nd project year (cont): • Other sources of funding in grid area including related projects • NATO Proposal for upgrading of NGI regional and global connectivity • Industrial cooperation • Negotiations for new grid nodes and users involvement from MoldHidroMeteo State Enterprise and the Institute of Economics and Statistics of Moldova. • Technical independence i.e. national-level services • Necessary resources for CA, VOMS, RB/WMS to be determined and established. • Expansion of national infrastructure • Inclusion of new sites • Expansion to new applications and user communities • Creation of MD-Grid user communities, applications selection and gridification. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 29

  30. Moldova • Report on May-November 2007: • NGI setup and recognition • MD-Grid Kick-off meeting • MD-Grid NGI Consortium Agreement signed by 6 NGI participants (May 10 2007): • Research and Educational Networking Association of Moldova – coordinator • Institute of Mathematics and Computer Science of the Academy of Sciences of Moldova • Faulty of Radioelectronics and Telecommunications of the Technical University of Moldova • Institute of Geology and Seismology of the Academy of Sciences of Moldova • State Hydrometeorological Service • School of Public Health, State University of Medicine and Pharmacy “N.Testemitanu” • NGI Recognized by: MID – Ministry of Information Development and ASM SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 30

  31. Moldova • Report on May-November 2007 (cont.): • NGI organization and Consortium expansion, NREN cooperation • Negotiations of MoUs on joining MD-Grid NGI with potential partners from the State University of Moldova and the Academy of Economic Studies of Moldova have started • eIRG plans • Letter of application sent. Answer gotten: Moldova cannot be member of eIRG , observer only, but there is no policy at the moment • Industrial cooperation • Negotiation of cooperation prospects with two domestic Companies that plan to be involved in GRID applications development • Technical independence i.e. national-level services • CA building documents preparation continued • Negotiation of the ability and possible procedure of National grid CA creation with National PKI bodies was organized SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 31

  32. Moldova • Report on May-November 2007 (cont.): • Expansion of national infrastructure • Organization of the tender for purchasing of the equipment according to the MoUs with institutions • In September 2007 new equipment for two clusters deployment in RENAM node (MD-01-REN node cluster) and in RENAM - IMI node (MD-02-IMI node cluster) was purchased. • Expansion to new applications and user communities • 1 application, nominated and gridification started SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 32

  33. Moldova • Up-dated plan for the remaining period: • NGI organization and Consortium expansion • State University of Moldova, the Academy of Economical Studies of Moldova • eInfrastructure national strategy • newMD-Grid NG eInfrastructure to be determined • eIRG plans • application for Moldova observer Membership to be prepared and sent • National-level projects • Adopting by Moldovan government of the Concept of National Information System for Science and Innovation will include grid-related topics. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 33

  34. Moldova • Up-dated plan for the remaining period (cont): • Other sources of funding in grid area including related projects • FP7, SEEGRID-SCI • Industrial cooperation • negotiations for new grid nodes and users involvement from the Academy of Economical Studies of Moldova. • Technical independence i.e. national-level services • necessary resources for CA, VOMS, RB/WMS to be determined and established. • Expansion of national infrastructure • negotiations for new grid nodes creation • Expansion to new applications and user communities • creation of MD-Grid users communities, PRNNS application gridification and deployment. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 34

  35. Montenegro • Plan for the 2-nd project year: • NGI organization and Consortium expansion, NREN cooperation • Increase number of MGI members • eInfrastructure national strategy • First draft of the national Grid strategy will be written and presented in for approval by the Ministry of Education and Science. • Promote the national Grid strategy and work on its implementation • Other sources of funding in grid area including related projects • Search for additional sources of funding, especially from industry. • Industrial cooperation • Dissemination of information about Grid technology among IT and other industry in Montenegro. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 35

  36. Montenegro • Plan for the 2-nd project year (cont): • Technical independence i.e. national-level services • Establish the National Grid CA (CP/CPS to be finished until May 2007 and completion is expected until end of 2007) • Expansion of national infrastructure • Improve the Grid infrastructure by upgrading the existing site and introducing new ones. • Expansion to new applications and user communities • Increase the number of users and applications. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 36

  37. Montenegro • Report on May-November 2007: • NGI organization and Consortium expansion, NREN cooperation • MGI organization improved by signing of new MoU and forming of JRU • Technical independence i.e. national-level services • CP/CPS documents were sent, waiting response and finish job. • Expansion to new applications and user communities • Hydro-metrological institute of Montenegro signed JRU. • HMI Montenegro use our cluster and adapting their application • Expansion of national infrastructure • Established connection of HMI LAN with MREN • National-level projects • Participation in the National Research Project Call from Ministry of Education and Science (Project “Cluster improvement and promotion in Montenegro”, September 2007) SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 37

  38. Romania • Plan the 2-nd project year: • NGI organization and Consortium expansion • RoGrid expansion with one more institution during 2007 • NREN cooperation • Cooperation with RoEduNet for NREGI development • National-level projects • The new R&D Call for proposals at the National level Plan is scheduled for June-July 2007. • Other sources of funding in grid area including related projects • Via international cooperation. Utilization of Structural Funds will be attempted. • Industrial cooperation • Activate cooperation with IT private high-tech companies SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 38

  39. Romania • Plan for the 2-nd project year (cont): • Technical independence i.e. national-level services • Activate the national CA • Expansion of national infrastructure • It is planned to include 1-2 new sites • Expansion to new applications and user communities • The expansion to the ESR, BioMed, and Simulation and Optimization fields will be attempted. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 39

  40. Romania • Report on May-November 2007: • NGI organization and Consortium expansion • Two new institutions have been included in the consortium: West University of Timisoara - Computer Science Department, and Technical University of Cluj-Napoca – Computer Science Department • National-level projects • Participation in the National Research Programme Call 1 (June 2007) • A proposal for NREGI development was submitted to the National Committee for Research Infrastructures • Three projects on Grid area were accepted for financing after the Call1 • Other sources of funding in Grid area including related projects • EGEE III, SEE-GRID-SCI, Structural funds. • Industrial cooperation • IT private high-tech companies included in proposal consortia for the NRP Call1 SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 40

  41. Romania • Report on May-November 2007 (cont): • Technical independence i.e. national-level services • National CA accredited in July 2007 • Romanian CA operational from October 2007 • Current level of provided services improved as compared with previous period • Expansion of national infrastructure • Site of the new RoGrid comers • Expansion to new applications and user communities • Modelling, simulation and optimization (MOSI) applications on Grid are under development (ICI, NCIT, WUT, TUCN, INCAS) • EQUSIM application was defined by NIPNE in cooperation with National Institute for Earth Science Bucharest • Aerospace research SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 41

  42. Romania • Up-dated plan for the remaining period: • National-level projects • Starting winning projects from NRP Call 1 • Other sources of funding in grid area including related projects • Contributions to current FP7 projects preparations (EGEE III, SEE-GRID-SCI) • Technical independence i.e. national-level services • Activate the national CA • Improve the current level of deployment of national-level services • Expansion of national infrastructure • Up-grade current sites • Expansion to new applications and user communities • MOSI applications deployment and support SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 42

  43. Serbia • Plan for the 2-nd project year: • NGI organization and Consortium expansion, NREN cooperation • Improve AEGIS organization with signing of new MoU and forming JRU • Maintain excellent relation with NREN • eInfrastructure national strategy • Work towards eInfrastructure national strategy • eIRG plans • Establish eIRG membership (in progress) • National-level projects • Seek national funding from newly introduced Ministry of Telecommunications and Information Society • Other sources of funding in grid area including related projects • Obtain equipment grants from SNIP and IPA (in progress) • Get further funding in grid area through participation in FP7 and regional calls (e.g. see-era.net) SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 43

  44. Serbia • Plan for the 2-nd project year (cont): • Industrial cooperation • Expand industrial cooperation, by interacting with hi-tech SMEs (e.g. IRVAS, SEWA) • Technical independence i.e. national-level services • Achieve full technical independence of national-level services, after accreditation of CA • Expansion of national infrastructure • Further expand AEGIS infrastructure by introducing new sites, and by upgrading existing ones • Expansion to new applications and user communities • Expand to new applications and user communities such as Meteorology and Archeology SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 44

  45. Serbia • Report on May-November 2007: • NGI organization and Consortium expansion, NREN cooperation • Annual AEGIS Assembly held on September 8 • AEGIS organization improved by signing of new MoU and forming of JRU • Excellent relation with NREN maintained – it is one of the founding members of AEGIS • Industrial cooperation • Industrial cooperation improved, two hi-tech SMEs (e.g. IRVAS, SEWA) are members of AEGIS • Technical independence i.e. national-level services • Full technical independence of national-level services is achieved; AEGIS CA accredited • Expansion of national infrastructure • Upgrade of AEGIS01-PHY-SCL in progress, new sites will be added in 2007 SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 45

  46. Turkey • Plan for the 2-nd project year: • NGI organization and Consortium expansion, NREN cooperation • TR-Grid will be expanded with the participation of new members from governmental departments and industry: Prime Ministry State Planning Organization, National Meteorology Service, Turkish Atomic Energy Authority, Kandilli Observatory and Earthquake Research Center , AGMLAB • JRU will be formed as a mechanism for NGI • eInfrastructure national strategy • TR-Grid strategy and policy will be finalized. • eIRG plans • TUBITAK expects to become a member of eIRG. • Other sources of funding in grid area including related projects • All of the TR-Grid members are trying to participate in different projects from national and international level. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 46

  47. Turkey • Plan for the 2-nd project year (cont): • Industrial cooperation • Meetings will be organized to strengthen the industrial and governmental collaboration of TR-Grid. • Technical independence i.e. national-level services • Full technical independence will be achieved. • Expansion of national infrastructure • Increase in the number of CPUs to over 1000 cores is expected. • Expansion to new applications and user communities • TR-Grid will support new grid applications from different research fields and looking at multidisciplinary applications. SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 47

  48. Turkey • Report on May-November 2007: • NGI organization and Consortium expansion • 1 new member – Turkish Atomic Energy Authority (TAEA) • TR-Grid JRU was formed in August 2007 with 9 members of NGI • eInfrastructure national strategy + policy documents • TR-Grid Strategy, Site and User Policy documents were finalized and announced to grid community in Turkey. • As the decision policy maker TR-Grid NGI, “TR-Grid Advisory Board” was initiated by Management Board of TUBITAK ULAKBIM. • eIRG plans • The membership of TUBITAK to eIRG was approved. • National-level projects • TR-Grid e-Infrastructure Project has been extended until the end of June 2007 and total project budget was increased to 800K Euro SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 48

  49. Turkey • Report on May-November 2007 (cont): • Other sources of funding in grid area including related projects • EUMEDGRID, EGEE-2 • Industrial cooperation • The industrial collaboration was initiated with AGMLAB (SME) in the semantic and search engine areas. ULAKBIM and AGMLAB developed an academic research engine which will use TR-Grid infrastructure and grid services. • AGMLAB (SME specialized in the semantic and search engine areas) developer of “Academic Research Engine Application for Grid” • EDA Engineering and Analysis (SME specialized in Computational Fluid Dynamics) • ROKETSAN Missiles Industries Inc. (leading the national rocket and missile research and production programs) SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 49

  50. Turkey • Report on May-November 2007 (cont): • Expansion of national infrastructure • 8 sites are operational. Minimum site configuration is 64 core and 1 Tbyte storage area. As total 1000 cores and 40 Tbyte storage. • The new HPC inifiniband 240 cores cluster with 12 Tbyte raw storage is also operational. • Sites migrated to EGEE production • All of the 8 sites are part of EGEE infrastructure SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 50