Objective SRC-CHNG. ESSIP Plan 2013. Agnieszka DYBOWSKA DSS/EIPR 13.09.2013. Comprehensive Explanation. Scope/Applicability: Applicable to civil & military REG, incl. NSAs → only REG/ MIL SLoAs Encompasses ANS plus the related ATFM and ASM functions (full ATM/ANS)

lavi
Download Presentation

Objective SRC-CHNG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR 13.09.2013

  2. Comprehensive Explanation Scope/Applicability: • Applicable to civil & military REG, incl. NSAs → only REG/ MIL SLoAs • Encompasses ANS plus the related ATFM and ASM functions (full ATM/ANS) • Applicable Areas: 4 States: AM, AZ, TR, UA ESSIP Plan 2013 / Objective SRC-CHNG 2

  3. Comprehensive Explanation • REG01: Ensure notification by ATM organisations of planned safety related changes (LAs & Comments must explain if a documented process and formal arrangements are in place, and if there are records of notifications at the NSA) • REG02: Establish a process for the review of safety arguments, in accordance with articles 9 & 10 of EU 1034/2011 (LAs & Comments must address: • if a documented process is in place, approved @ appropriate NSA level; • conformity with Article 10(1) of SO-IR; or ESARR 1 edition 2.0; • if adequately trained NSA personnel conducting the reviews & supporting guidance are in place; • if reviews assess the acceptability of the safety arguments; and • if the introduction into operational use of a change subject to such review is conditioned by an acceptance by the NSA (article 10(3) SO-IR).) • REG03: NSA to implement the process (LAs to address: • evidence/ records of safety reviews by the NSA of the safety arguments submitted by the ATM organisations and evidence of actions taken; • notifications of acceptance by the NSA of introduction of a change into operational use subject to the safety review.) ESSIP Plan 2013 / Objective SRC-CHNG 3

  4. What is new or has changed since LSSIP 2012 • Minor changes in ESSIP Plan Edition 2013 (only modification of the numbers of Regulations applicable) • No link with European ATM Master Plan ESSIP Plan 2013 / Objective SRC-CHNG 4

  5. Supporting Material The most important: • Commission Implementing Regulation (EU) 1034/2011 on Safety Oversight • ESARR 1, Edition 2.0 • EAM 1 / GUI 1 Explanatory Material on ESARR 1 Requirements ESSIP Plan 2013 / Objective SRC-CHNG 5

  6. ESSIP Report 2012 • Two out of four States reported Objective SRC-CHNG as Completed. • Further 2 have reported delays in implementation due to lack of appropriate resources. • Since last year’s report there has been no progress in the implementation of this Objective. ESSIP Plan 2013 / Objective SRC-CHNG 6

  7. Objective Coordinator’s Analysis, recommendations, tips & tricks • Processes or arrangements reported as “Completed” before Nov 2007 (EU) or Dec 2009 (non-EU) may hide non-compliance with current regulatory requirements. • Request that REG/NSA specifies the legal references to the national implementing rules and other acts documenting their local arrangements for the safety oversight of changes (NSA procedures, manuals, guidelines to the safety auditors etc). ESSIP Plan 2013 / Objective SRC-CHNG 7

  8. Links and contacts • Objective Coordinator: Dybowska A., +32 2 729 5152agnieszka.dybowska@eurocontrol.int • DSS Objective Expert(s): Deboeck, M., +32 2 729 3812 Marc.DEBOECK@eurocontrol.int ESSIP Plan 2013 / Objective SRC-CHNG 8