Ecss ccsds liaison
This presentation is the property of its rightful owner.
Sponsored Links
1 / 5

ECSS – CCSDS Liaison PowerPoint PPT Presentation


  • 96 Views
  • Uploaded on
  • Presentation posted in: General

ECSS – CCSDS Liaison. N. Peccia CCSDS Spring 09 Meeting Col Springs, USA 28.04.2009. ECSS – CCSDS Liaison. ECSS and CCSDS have signed a MoU with the following objectives: Early exchange of New Work Items in order to avoid duplication of effort

Download Presentation

ECSS – CCSDS Liaison

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ecss ccsds liaison

ECSS – CCSDS Liaison

N. Peccia

CCSDS Spring 09 Meeting

Col Springs, USA

28.04.2009


Ecss ccsds liaison1

ECSS – CCSDS Liaison

  • ECSS and CCSDS have signed a MoU with the following objectives:

    • Early exchange of New Work Items in order to avoid duplication of effort

    • Cross participation between ECSS and CCSDS to reviews of ECSS standards and CCSDS recommendations, in order to maximize technical expertise available for those reviews and eventually facilitate adoption by the other party ;

    • Periodic exchange of planning for standards and recommendations reviews, in order to enable cross participation in both organizations.

  • To implement this MoU and achieve those goals, a coordination process has to be put in place.

  • Two Points of Contact (PoC) have been designated for this MoU on both sides :

    • G.Moury for ECSS

    • N.Peccia for CCSDS,


Ecss ccsds liaison2

ECSS – CCSDS Liaison

  • Draft procedure for CCSDS – ECSS liaison co-ordination produced

    • But it needs to be compared against the existing CCSDS liaison procedures

    • To be considered as internal co-ordination between the POCs

  • First telecon between PoCs (GM and NP), ECSS Secretariat and CCSDS Secretariat (part time) held on 25th April

    • Internal Procedure reviewed

    • Some clarifications needed on both sides

    • ECSS editorial rules discussed without CCSDS Secretariat

      • Discussed already during CESG Chair presentation

  • CCSDS POC clarifies that

    • any activity on top of normal CCSDS processes already in place for RIDs, Liaisons, etc. will be done by the CCSDS POC (NP)


Ecss ccsds coordination process

ECSS-CCSDS coordination process

CCSDS

ECSS

PoC

ECSS

CCSDS

PoC

EUROSPACE

CCSDS

Secretariat

WG

ECSS

Secretariat

Eumetsat

WG

WG

NVIR

Review Announcement + Review Package url

Normal CCSDS procedure

If CCSDS Secretariat can

not produce the reports

automatically, CCSDS POC

will produce them.

ECSS RIDs (from different organizations)

Collected ECSS RIDs

CCSDS Agency Review

RIDs Disposition

List of ECSS selected CCSDS Projects and standards

Selected CCSDS Project Planning (every half a year, 30 days after CCSDS meeting)

Selected CCSDS WG charters (every half year, 30 days after CCSDS meeting)

List of selected CCSDS BOFs

List of ECSS NWIP as potential CCSDS BOFs


Identification of ecss standards of potential interest to ccsds

Identification of ECSS standards of potential interest to CCSDS

  • E-70-41 (Packet Utilization Standard - PUS)

    • A NWI Proposal is going to be issued in ECSS for updating the PUS standard.

      • One option is to propose that this new version of the PUS is being developed within a CCSDS WG (MOIMS area ?). The objective would be to update PUS as a CCSDS/ISO standard.

  • Other ECSS standards to be identified


  • Login