An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Maintenance Utilization TECH 58100 Project Champion/Define Phase Chris Gray 10/2/2013

  2. Project Selection • General Goal: Maintenance Optimization through Computerized Maintenance Management System (CMMS). • Option #1: Utilize work order system to increase general maintenance activities and reduce secondary equipment failures. Currently, work orders are only used to focus on primary production equipment preventive maintenance (PM). • Option #2: Complete full parts analysis to reduce overhead, ensure equipment functionality, maintain quality and reduce impact to repair and maintenance budget. Currently, parts are not inventoried, required PM parts are not on site, and R&M budget potential is reduced to misappropriation. This will allow parts to be loaded in CMMS and increase work order execution. • Option #3: CMMS software change to acceptable alternative. Currently, use a in-house program called Facility Management System (FMS).

  3. Project Ranking & Matrix Option #1 was selected. The potential impact for maintenance optimization is higher with option #1. This should have the most impact for the least amount of investment.

  4. Business Case Maintenance organizations must operate as an independent entity within a business. Their focus must be customer service and attention on equipment up-time, equipment availability, timeliness of repairs; along with cost. The CMMS is used to focus on PM work order execution on primary production equipment. General work orders, non-PM, must be completed in a timely manor to ensure secondary equipment is maintained. While primary equipment makes sellable product, the secondary equipment provides necessary support to ensure process controls are met on primary equipment. Optimization of the CMMS work order system to manage general safety and repair WO’s will increase personnel utilization, increase secondary equipment reliability, eliminate hazards, increase quality and decrease operating costs.

  5. Problem Statement • CMMS work order are only used for PM execution. General work orders are not managed, therefore requestors are directly asking for work to be done. There is no management of maintenance personnel, work authorization, record of work or data collected for failure analysis. • General work is not completed in a timely manor. • Customers satisfaction is low. • Non-critical safety items are slow to be repaired. • Uncontrolled cost • No data/failure analysis information is collected

  6. Project Objectives There are two objectives which will be the focus of the project. • Use the existing CMMS system to increase work order usage and execution. • Increase Maintenance personnel utilization. • Decrease overall maintenance costs for the plant.

  7. Goal & Deliverables • Utilize the computerized maintenance management system to ensure all work requested is captured and executed by a work order. • Reduced time for general repairs –repairs made <2 weeks • Increased customer satisfaction • Increased maintenance utilization –measure total work orders completed –necessary measurement since no baseline is established. • Reduced maintenance backlog –reduce work order backlog by 50%

  8. Stakeholder Analysis

  9. SIPOC

  10. VoC - SWOT

  11. CTQ Tree

  12. ROI • The execution of this project results in no investment. The maintenance Scheduler already exists, therefore no additional headcount is required. There will be a cost reduction from using company labor versus contractor labor ($30 vs $125) to make secondary equipment repairs. Performing the necessary routine maintenance on secondary equipment will also result in a reliability increase and ultimately a reduced operating cost.