An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Јавно предузеће “АУТОПУТЕВИ РЕПУБЛИКЕСРПСКЕ” Бања Лука Construction of Motorway Network in Republic of Srpska Public Company “REPUBLIC OF SRPSKA MOTORWAYS” Banja Luka

  2. Operation, construction, maintenance andprotection of motorways and highways by PC “Republic of Srpska Motorways” Banja Luka • The following motorway sections will be in the future motorway network: • Banja Luka – Gradiska, 35 km • Banja Luka – Doboj, 71,91 km,  • Doboj – Vukosavlje (koridor Vc), 46 km, • Banja Luka – Kupres (Glamoc), 110 km, • Banja Luka – Prijedor – Novi Grad, 71 km, • Vukosavlje – Samac - Bijeljina, 98 km.

  3. Example Bullet Point Slide 2

  4. CURRENT PROJECTS: • Banja Luka – Gradiska(I phase) (completed) • Mahovljani Motorway Interchange (completed) • Banja Luka – Gradiska(II phase) (completed) • Banja Luka - Doboj (Construction in progress) • Corridor Vc (ready for construction – PPP in preparation)

  5. Example Bullet Point Slide 2

  6. BANJA LUKA – GRADISKA MOTORWAY(completed – in operation) • Phase I (5,7 km) financed by local funds, 50 mil € • Phase II (26,7 km) financed by loan funds: • EIB loan, 65 mil € • EBRD loan, 31 mil €

  7. Example Bullet Point Slide 2

  8. MAHOVLJANI MOTORWAY INTERCHANGE(completed – in operation) • Connecting Banja Luka – Gradiska Motorway and Banja Luka – Doboj Motorway • Financed by loan funds: • EBRD loan, 21 mil € • EC grant, 5 mil €

  9. Example Bullet Point Slide 2

  10. BANJA LUKA – DOBOJ MOTORWAY(ready for construction) • Connection between Banja Luka – Gradiska Motorway and CorridorVc • Total length of 71,91 km splitted in two sections: • Prnjavor – Doboj (Johovac), duzine 36,61 km. (EBRD loan approved,150 mil €) • Banja Luka (Mahovljani) – Prnjavor, duzine 35,3 km (EIB loan in process, 200 mil €)

  11. Example Bullet Point Slide 2

  12. DOBOJ – VUKOSAVLJE MOTORWAY(Part of the CorridorVc in Republic of Srpska) Total length of 46,6 km Ready for construction PPP in preparation

  13. Example Bullet Point Slide 2

  14. FIRST PRIORITY – COMPLETED / ONGOING Example Bullet Point Slide 2

  15. SECOND PRIORITY – IN PREPARATION Example Bullet Point Slide 2

  16. Operation, construction, maintenance andprotection of motorways and highways by PC “Republic of Srpska Motorways” Banja Luka • The following motorway sections will be in the future motorway network: • Banja Luka – Gradiska, 35 km • Banja Luka – Doboj, 71,91 km,  • Doboj – Vukosavlje (koridor Vc), 46 km, • Banja Luka – Kupres (Glamoc), 110 km, • Banja Luka – Prijedor – Novi Grad, 71 km, • Vukosavlje – Samac - Bijeljina, 98 km. SECOND PRIORITY – IN PREPARATION Studies and planning documentation still to be prepared