1 / 13

The Developement of Motorway network in Croatia

Institut IGH d.d. The Developement of Motorway network in Croatia. Goran Puž, PhD, civ.eng. Institut IGH d.d.

eve-pearson
Download Presentation

The Developement of Motorway network in Croatia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Institut IGH d.d. The Developement of Motorway network in Croatia Goran Puž, PhD, civ.eng.

  2. Institut IGH d.d. The Developement of Motorway network in Croatia 1. Background 2. History 3. Strategy 4. Design 5. Construction 6. Structures 7. Financing 8. Impacts (sustainability) 9. Future

  3. Institut IGH d.d. 1. Background Pannonian lowlands eastern edges of the Alps Basic facts - Croatian mainland covers 56,542 km2 - population 4,4 mil. inhabitants. - independent state since 1991. Danube Dinara mountain range Adriatic Sea • three large geographic regions in Croatia have different geomorphological and climatic characteristics

  4. Institut IGH d.d. Geotraffic position of Croatia in European inland and maritime traffic routes 1. Background

  5. Institut IGH d.d. 2. History First motorways: 1970 Initially: accent on longitudinal axes neglected transversal axes – maritime orientation Until 1991: 357 km of motorways and semi-motorways

  6. Institut IGH d.d. 2. History Motorway network: the biggest engineering venture in Croatia since its independence - 1991 to 1998: very few construction projects - intensive production of studies and designdocuments - project start: 1998 - 2001 - accelerated construction: from 2001 to 2009 more than 700 km of new motorways average: 80 km per year

  7. Institut IGH d.d. 3. Strategy STRATEGIC DEVELOPMENT DOCUMENTS Zoning Strategy of the Republic of Croatia Traffic Development Strategy of the Republic of Croatia, 1999: 1500 km of motorways • goals: • accessibility, • capacity • connection of the entire national territory • economic growth • transit traffic • connection to the European traffic network

  8. Institut IGH d.d.

  9. Institut IGH d.d. 4. Design The perception of space as a basic national resource is rapidly gaining momentum, and so the care about interaction between developed space and its surroundings is becoming increasingly important in the design work.

  10. Institut IGH d.d. 4. Design • Protection criteria: • - Avoiding valuable construction, • agricultural or forest land • - Keeping safe water protection areas • - Not affecting the urban environment • Avoiding protected natural • preserves or cultural – • historical sights

  11. Institut IGH d.d. 4. Design Full scale motorway: Design speed120 km/h 100 km/h - mountains

  12. Institut IGH d.d. 4. DesignService stations: Rest areas: 124 – every 20 km Rest areas with filling station: 75 – every 31 km Caffe bars: 90 – every 28 km Restaurants: 17 - every 138 km Hotels: 7 Maintenance and Trafic Control Centres: 23

  13. Institut IGH d.d. 4. Design Brinje 2007. Traffic safety: safest tunnels in Europe European Tunnel Assessment Programme – Euro TAP