MAVEN PFFSW STATUS 4/03/2012

MAVEN PFFSW STATUS 4/03/2012. Operational Status. Interface Documents, Meetings STATIC 3/8/12. Data processing email 28 -> 35 Telemetry Products ! STATIC Specification rev N, 3/29/12 SEP Specification rev C, 2/1/12. SWIA Specification rev H, 3/29/12

kipling
Download Presentation

MAVEN PFFSW STATUS 4/03/2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAVEN PFFSW • STATUS • 4/03/2012

  2. Operational Status Interface Documents, Meetings • STATIC 3/8/12. Data processing email 28 -> 35 Telemetry Products ! • STATIC Specification rev N, 3/29/12 • SEP Specification rev C, 2/1/12. • SWIA Specification rev H, 3/29/12 • DFB-DCB ICD rev E, 1/30/12 (15th revision, they count 1-10, A-E) Development • STATIC design, development and simulation • Generated V2.4 ramload for I&T of MAG, LPW and SEP • Tested Actuator (2-bit logic) at 1/64th full speed (RegSim relay needs to be replaced) • Installed RTS v 2 on DVF • Verified RTS is loaded and operates as expected • Installed LPW LUTs on DVF • SEP has not provided any LUTs • Developed FSW limit monitors specification & this was circulated to team • Developed I&T “punchlist” for instrumenters (RTS, LUTs, Tables) • Developed Limit Monitor data structure and logic • Developing GSEOS Displays to support MAG, LPW, SEP verification • Checked MAG1 Apid 26, 40, 42 compressed & uncompressed formats on DVF. OK • Checked LPW Apid 54 (the only one given by instrument simulator) • Checked SEP Apid 2B (only housekeeping given by instrument simulator) IV&V • Awaiting Info re. Level 5 Requirements Validation Report Next Up • Limit Monitors for I&T of MAG, LPW and SEP • Run through of Flight I&T of MAG, LPW and SEP on the ETU • Need to get agreement on RTS 0-5 , (Cold and Warm Resets, Safe, Normal, Eng modes) • Working on a packet-level compression specification

  3. Reqts Issues No details available Normal to Reboot to start a new Operational program No details available

  4. Reqts Moves Move from HSK to PWR Move from STA to FP

  5. Reqts Build 3 SWIA Moments SWEA Pitch Angle Dists

  6. EEPROM

  7. SRAM

  8. Test Environment GSEOS Status: • Instrument simulation (working for MAG science, but others are housekeeping only) • Instrument simulation files for LPW, etc. need work. Need for each Instrument: • Case 1. Typical test pattern • Case 2. Anomaly test pattern (e.g Housekeeping violations) • Case 3. Worst case telemetry rate • Limit checking error messages in GSEOS • No limits are being checked GSEOS Python Test Scripts, Displays • # I&T Test Scripts Ready = 0 • # Engineering APIDs displayed : 10 of 13 (I added 26, 27 and 2B, 2C) • # Science APIDs displayed : 10 of 67 (I added 40-43, 50-54, 70) • # Total APIDs generated by Version 2.4 : 80

  9. SPRs and SCRs

  10. Charts CHARTS

  11. Op SLOC

  12. Module Status Chart

  13. Metrics Chart

  14. Margin Chart Finished adding LUTs to EEPROM. None in Flash Calculations performed in Analyses.xls

  15. Defect Chart