An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15th 2009 MTest May Wed 27th – Tue June 2nd, 12 hours/day, probably 10pm – 10am, Priority is to test Cerenkov detectors, using custom fast electronics. Keep it simple! Want to test several devices, in order of priority or task: 2 Photek tubes in line in beam with 0,2,4,6 mm extra quartz radiator Q-bar with 2 Photek tubes, one each end. Perpendicular to beam (and x, θ scans) Q-blocks with SiPMs in line (Anatoly) GASTOFs 2 in-line, sent by Louvain. (Same DAQ, just exchange cables) 2 Photonis 48 x 48mm tubes with ganged together channels, in line (+ extra Q if wanted) Iff the latter shows good resolution, would like to install them in QUARTZTOF(cones). =============================== The above is our plan. Additional tests with QUARTIC (8-bar design) and different electronics (A.Brandt) only if they are fully independent, on back table, and understand we are prime user. I will discuss this next week at UTA (Mike)

  2. MTest May 27-June 2 All 120 GeV/c protons, intensity ~ 10K-20K per 4 sec spill, 1/minute. Small trigger scint counter ~ 2mm x 2mm 2PMTs in Dark Box. [AR] Scan to find beam center. 2nd large trigger counter ~ 4cm x 4cm in line, in COINC for trigger Halo-veto counter with round hole diam ~ 5mm to reject showers. [AR] “Standard” reference fast detector, in beam & always read out PHOTEK 240 (40mm diam) These on front table, see plan later. Scanning table: x,y,θ … mount in moveable base, program it Trigger logic & DAQ shown on next slide [ER] Very fast digital scope Set-up & waveform recording (if wanted)

  3. Electronic Measurement Time to Analog Convertors (TAC) - Ortec 567 Scintillator Trigger MCP/PMT’s START STOP 14 bit CAMAC ADC’s - Ortec AD114 Anode signals START STOP Constant Fraction Discriminators (CFD) - ortec 9327 NIM signals START STOP Analog Output 10 bit CAMAC ADC’s – LeCroy 2249 Add to this: 2nd small 2x2 trigger in AND Veto counter with hole in VETO 3

  4. Notes on detectors: 1 large (40mm diam, 2 MCPs) PHOTEK in beam center, maybe add Q. Keep fixed as Ref. 2 Photek tubes in line without & with Q-disks on window (grease? removal?) Dark Box [ER] Q-bar: Fused silica bar 6mm x 6mm x 90mm, Photek 3μm pore 10mm Φ each end. (Beam ┴ to bar, scan along, rotate…) [being made, Lindenmeyer] Light tight, but in dark box for RF and convenience of cables etc. [MA] Q-blocks + SiPMs in line [AR] GASTOF: 2 devices with (1-channel) Photek PMTs [exist, from Louvain] Mounted in line on plate, too big for dark box, mount on 2nd table (assuming no QUARTICs there) < AEROGEL ? blocks ~ 2cm long, mirror  Photeks. (Not yet made) > maybe Pair of Photonis 64-pad 48x48mm2 tubes in line (+Q plate?) to test integrated readout. < QUARTZTOF (Cones) IFF Integrated Photonis test looks good, be prepared to put on Cone radiators (2nd separate dark box). > maybe.

  5. Very schematic placement of detectors 40x40mm veto scint 40x40mm trig scint Q-bar DARK BOX BEAM 2x2 mm trig scint GASTOFs (1/2 shift) Heavy duty tables

  6. Jobs: Pre-beam: laser tests Anatoly+Mike Friday for PHOTEKs, check all PMTs, Prepare electronics/DAQ/computer Trigger and veto counters, trigger logic, cables. Prepare detectors: See previous slide. Run control software, on-line histograms etc. Prepare stands and motion control, programmed. Make time plan/schedule/shifts & people People (? partial list?) Mike Albrow, Erik Ramberg, Anatoly Ronzhin, Sasha Pronko, Hans Wenzel, + others may be, let us know.