Aviano 2000 Program

Aviano 2000 Program. 8 Mar 2006. Quick Definitions. Aviano 2000 (AV2K) $610 million NATO construction program to bed-down 2 fighter squadrons Implementation of NATO Capability Package (CP) 3A0011 Includes both Italian and US construction agents Program Management Office (PMO)

kerem
Download Presentation

Aviano 2000 Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aviano 2000 Program 8 Mar 2006

  2. Quick Definitions • Aviano 2000 (AV2K) • $610 million NATO construction program to bed-down 2 fighter squadrons • Implementation of NATO Capability Package (CP) 3A0011 • Includes both Italian and US construction agents • Program Management Office (PMO) • Cradle-to-grave management of Aviano 2000 construction program • Single point of contact for Aviano Air Base construction

  3. Aviano 2000 History 1993 • NATO decides to relocate 2 fighter squadrons from Spain to Italy 1994 • Fighters, personnel arrive at Aviano--base population literally doubles overnight • Existing facilities undersized and inadequate • CP 3A0011 developed—dubbed “Aviano 2000” • Planning and programming for AV2K remain within current structure - Base Civil Engineer Squadron

  4. Aviano 2000 History 1995-1998 • Program size, coupled with Balkan air campaign, stretches base resources too thin • Standard planning and execution items falling through the cracks • By December 1998, need for a programmatic approach is clear 1999 • 16 AF/CC decides to sponsor the Aviano 2000 effort • Program Management Office (PMO) created 2005 • PMO moves from 16 AF to 31 FW

  5. NATO Intent CP 3A0011 • NATO program scope is for bed-down of only two F-16 squadrons • No contingency ops • No other missions (603 ACS, 16 AF, Army, etc.) • “Minimum Military Requirement” • First time NATO funds Quality of Life Projects • Italy is Host Nation • Italian laws, standards, and regulations apply • Host nation-ship granted to US via MOU for 66 projects • NATO authorizes and funds project scope • Any additions to that scope must be USAF-funded (“US cost share”) • NATO projects have, on average, 14% US cost share • NATO “buys scope”—NATO will fund modifications as long as they are within scope of original project

  6. Aviano 2000 Program Scope • Mix of operational, direct and indirect support, and quality-of-life facilities • 285 projects total, $610 million • 99 NATO ($395 million)—PMO-managed • 174 US MILCON, O&M ($203 million)—CE-managed • $12 million ITAF program • Includes major utilities and communications backbones • Multiple sources of funding • Italy ceded 210 acres of new land to use – Zappala’ Area • Complex NATO system for project and funding approvals